Home  

Random  

Nearby  



Log in  



Settings  



Donate  



About Wikipedia  

Disclaimers  



Wikipedia





Talk:100-year flood





Article  

Talk  



Language  

Watch  

Edit  



This is an old revision of this page, as edited by JoKalliauer (talk | contribs)at22:02, 11 April 2023 (Definition inconsistent (multiple events within the same year): new section). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
(diff)  Previous revision | Latest revision (diff) | Newer revision  (diff)


Latest comment: 1 year ago by JoKalliauer in topic Definition inconsistent (multiple events within the same year)
 


Learn more about this page

Flood Forecasting

Text presently in this article at subheads Upslope factors, Downslope factors, and Prediction might fit better in Flood forecasting. Justaxn (talk) 19:13, 1 July 2015 (UTC)Reply

The topic seems to be scattered in several places, and I agree Flood forecasting is not ideal. Similar ideas appear in Hydrology#Modeling, Hydrological modeling, and Runoff model. Perhaps one of the 4 should be improved and all the others should have a See Also. In any case, the physics of rainfall-runoff and calculations of a design flow rate for insufficiently-gaged sites shouldn't be in 100-year flood. We do need a link to those ideas, of course, perhaps from the statement under Probability uncertainty about regional regressions and hydrologic models. Justaxn (talk) 18:58, 4 July 2015 (UTC)Reply
Almost 200 articles link to this one, so this content can reach a wide audience. Floodplain mapping, flood safety in design, and related hydraulic engineering are important and complex topics. My point is we can't do them justice within this article. Perhaps we need a new section(s) with a sentence or two on the topics I propose to delete and you propose to add. New headings might be Use in floodplain mapping and Use in river engineering. Then this article would show the many links to related topics while remaining primarily about statistics and uncertainty. Would you care to propose some specific text that should appear? I quite agree that we should inform the public better about the many real and large uncertainties in projections of potential flood severity. Justaxn (talk) 17:43, 6 July 2015 (UTC)Reply
Floodplain maps seem to emphasize natural water channels and neglect the artificial channels and dams created by the cut and fill of transportation corridors. Fill prisms may be converted to dams unless drainage structures are sized to pass the debris likely to be transported by flood flow, rather than sized for flood flow alone. This is more likely in small runoff basins drained by culverts too small to pass floating trees. Planning should anticipate sudden release of water impounded behind saturated fill prisms without overflow structures; and, until such failure occurs, possible diversion of runoff through transportation corridors into adjacent drainages.
Would you care to propose text describing evaluation of precipitation datasets? (specifically how and why one might separate orographic from convective precipitation events in historical data rather than attempting to normalize both within a single probability distribution) I have seen datasets including a few outliers at the upper end of the frequency distribution suggesting infrequent short-duration, high-intensity cells within storm systems. These cells average out in large drainage basins, but may be critical events in small runoff basins. It might be useful to explain why floodplain mapping of smaller drainage basins requires more refined data evaluation emphasizing short-duration precipitation intensity and local conditions at the higher elevations of small drainages causing increased precipitation and lower temperatures preserving snowpack. Thewellman (talk) 22:17, 6 July 2015 (UTC)Reply
The proposal to remove certain parts of this article appears to be based upon belief this article should focus on statistics, uncertainty and flood. While the 100-year flood is a useful example of application of the first two subjects to the latter phenomenon, all three have separate articles. Suggesting that material on other aspects of this subject is inappropriate for this article would skew this article toward theory and neglect the practical problems of applying probability theory to this real-life situation. Thewellman (talk) 05:13, 8 July 2015 (UTC)Reply
Upslope factors: Most precipitation records are based on a measured depth of water received within a fixed time interval. Frequency of a precipitation threshold of interest may be determined from the number of measurements exceeding that threshold value within the total time period for which observations are available. Individual data points are converted to intensity by dividing each measured depth by the period of time between observations. This intensity will be less than the actual peak intensity if the duration of the rainfall event was less than the fixed time interval for which measurements are reported. Convective precipitation events (thunderstorms) tend to produce shorter duration storm events than orographic precipitation. Duration, intensity, and frequency of rainfall events are important to flood prediction. Short duration precipitation is more significant to flooding within small drainage basins.[1]
Downslope factors: Water flowing downhill ultimately encounters downstream conditions slowing movement. The final limitation is often the ocean or a natural or artificial lake. Elevation changes such as tidal fluctuations are significant determinants of coastal and estuarine flooding. Less predictable events like tsunamis and storm surges may also cause elevation changes in large bodies of water.
Prediction: Statistical analysis requires all data in a series be gathered under similar conditions. Even without analyzing the statistical uncertainty of a given 100-year flood, scientists and engineers can decrease the uncertainty by using two practical rules. First, forecast an extreme event which is no more than double the number of observation years (e.g. from 27 observed river measurements, so a 50-year event can be estimated since 27×2=54, but not a 100-yr event). The second way to decrease the uncertainty of the extreme event is to forecast a value which is less than the maximum observed value (e.g. the maximum rainfall event on record is 5.25 inches/hour, so the 100-year storm event should be less than this). Note that these rules cannot help in estimating Q100 if the maximum observed flood (or storm) had a shorter recurrence interval.
A simple prediction model might be based upon observed flows within a fixed channel geometry.[2] Alternatively, prediction may rely upon assumed channel geometry and runoff patterns using historical precipitation records. The rational method has been used for drainage basins small enough that observed rainfall intensities may be assumed to occur uniformly over the entire basin.
Extreme flood events often result from coincidence such as unusually intense, warm rainfall melting heavy snow pack, producing channel obstructions from floating ice, and releasing small impoundments like beaver dams.[3] Coincident events may cause flooding outside the statistical distribution anticipated by simplistic prediction models.[4]

Riverine Emphasis

This article appears to focus exclusively on flooding from riverine sources. However, the concept of a 100-year flood applies to flooding from lakes and oceans. Beyond only explicitly referring to riverine flooding, the issue manifests in various other forms, such as relating a 1% flood to flow (as opposed to elevation). Tfocker4 (talk) 01:10, 12 February 2016 (UTC)Reply

Good point. I've added a bit for balance in a few places. Please add other ideas as you see fit. Justaxn (talk) 00:04, 8 March 2016 (UTC)Reply

References

  1. ^ Simon, Andrew L., Basic Hydraulics, John Wiley & Sons, 1981, ISBN 0-471-07965-0
  • ^ Linsley, Ray K. and Franzini, Joseph B., Water-Resources Engineering, McGraw-Hill Book Company, 1972
  • ^ Abbett, Robert W., American Civil Engineering Practice, John Wiley & Sons, 1956
  • ^ United States Department of the Interior, Bureau of Reclamation, Design of Small Dams, United States Government Printing Office, 1973
  • Probability

    Is the probability of an X-year flood occurring in an X-year period actually binomial, or is it Poisson distributed?

    Hello fellow Wikipedians,

    I have just modified one external link on 100-year flood. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

    When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.

    This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}} (last update: 5 June 2024).

    Cheers.—InternetArchiveBot (Report bug) 07:29, 11 January 2018 (UTC)Reply

    Definition inconsistent (multiple events within the same year)

    A 100-year flood can occur multiple times within a year. The expected value is 1%, which means that in the arithmetic mean there are 1% events every year, however this means that there is a change of about 0.01% that two or more events occur and in about 0.98% of the cases exactly one event happes a year. Therefore we have a total of about 0.99% that at least one event is occuring. The English literature, different to e.g. the German one, does not destinglish between that, and is incosistent.

    does not agree with

    This differences are huge is huge the 2-year food. Yes we can round numbers in the 100year flood, but we have to be precise in how it is defined, and what is numerially derived from that.  — Johannes Kalliauer - contrib. 22:02, 11 April 2023 (UTC)Reply


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Talk:100-year_flood&oldid=1149384408"
     



    View edit history of this page.  


    Languages

     



    This page is not available in other languages.
     

    Wikipedia


    This page was last edited on 11 April 2023, at 22:02 (UTC).

    This version of the page has been revised. Besides normal editing, the reason for revision may have been that this version contains factual inaccuracies, vandalism, or material not compatible with the Creative Commons Attribution-ShareAlike License.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Terms of Use

    Desktop