Pile splice





Article  

Talk  



Language  

Watch  

Edit  


(Redirected from Pile Splice)
 


Apile splice joins two segments of a driven pile, using either a weld (typical for H beams), grout or mechanical means (typical for precast concrete piles). Pile splices enable the use of shorter segments, which allows for driving piles in low-headroom situations such as under bridges or inside buildings.[1] Reducing length of pile segments to under ~65 feet long also means the trailers that haul them to job sites can stay within state length limits.[2]

An Emeca mechanical pile splice. The rebar on the back side will be cast into the end of a concrete pile.
With splices cast into the end of each segment of concrete pile, the pile driving crew just 1) lines up the segments; 2) connects the splice and 3) drives in the locking pins.

References

edit
  1. ^ "Concrete Pile Splices", PileBuck International, Inc.[1] Retrieved on 7 December 2012.
  • ^ "Size & Weight Limits", America's Independent Truckers' Association, Inc. Retrieved on 7 December 2012.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Pile_splice&oldid=927959086"
     



    Last edited on 25 November 2019, at 21:58  





    Languages

     



    This page is not available in other languages.
     

    Wikipedia


    This page was last edited on 25 November 2019, at 21:58 (UTC).

    Content is available under CC BY-SA 4.0 unless otherwise noted.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Terms of Use

    Desktop