The Reading–Taunton line is a major branch of the Great Western Main Line from which it diverges at Reading railway station. It runs to Cogload Junction (east of Taunton) where it joins the Bristol to Exeter and Penzance line.

Reading–Taunton line
AFirst Great Western HST approaching Great Cheverell on its way to Westbury
Overview
StatusOperational
OwnerNetwork Rail
LocaleSouth East England
South West England
Termini
  • Taunton
  • Service
    TypeHeavy rail
    SystemNational Rail
    Operator(s)Great Western Railway
    History
    Opened1906
    Technical
    Line length103 mi 51 ch (166.8 km)
    Number of tracks2
    Track gauge1,435 mm (4 ft 8+12 in) standard gauge
    Electrification25 kV 50 hz AC OLE (Reading to Newbury)
    Operating speed110 mph (180 km/h) maximum

    Route map


    (Click to expand)

    Since 1906 it has served as the principal route from London PaddingtontoDevon and Cornwall, having been built by the Great Western Railway (GWR) joining up several earlier railway lines. These included the Berks and Hants Railway from Reading to Hungerford and part of the Wilts, Somerset and Weymouth Railway from WestburytoCastle Cary. The section from Reading to Westbury is sometimes called the Berks and Hants Line, despite never entering the county of Hampshire.[1]

    History

    edit
     
    The GWR's cut-off lines to the west of England (shown in red).

    The Great Western Railway first ran trains from London to Plymouth in 1848. These trains ran via Bristol. The London and South Western Railway completed the rival West of England line in 1860, which provided a more direct route from London to Exeter. The GWR's longer route via Bristol became nicknamed the "Great Way Round" (after its initials GWR).[2][page needed]

    The direct line from Reading to Taunton was created from three earlier routes. These had been created by companies that had been absorbed into the GWR:

    The first step of creating the direct line was in 1900 when the Stert and Westbury Railway was built from Patney and Chirton (west of Pewsey) to Westbury. In addition to being part of creating a long-distance line from Reading to Taunton, it also created a shorter GWR route from London to Weymouth. The last stage to be built was the Langport and Castle Cary Railway from Castle Cary to Taunton. This route shared some of the route of the Yeovil–Taunton line west of Langport, but joined the existing main line further south at Cogload Junction. This route opened on 2 July 1906.

    The various sections of line were opened:

    In 1933, bypass lines were built at Westbury and Frome.[5]

    The Great Western was nationalised on 1 January 1948 as part of the new British Railways (BR). Resignalling in the 1980s enabled faster running. This was followed by privatisation in the 1990s, with the line being transferred first to Railtrack and then to its successor Network Rail.

    In 1977 the Parliamentary Select Committee on Nationalised Industries recommended considering electrification of the BR network, and by 1979 BR presented a range of options that included electrifying numerous Western Region routes including Reading to Taunton line by 2000.[6] Under the 1979–90 Conservative governments that succeeded the 1976–79 Labour government the proposal was not implemented.

    Route

    edit
  • t
  • e
  • Reading–Taunton line

    miles

     

    0¾
    London Paddington

     

     

     

    36¾
    Reading

     

    36¾

     

     

    Great Western Main Line
    toTaunton via Bristol

     

    36
    Reading West

     

     

    37¾

     

    41¼
    Theale
     

     

     

    44¾
    Aldermaston

     

    46
    Midgham

     

    49½
    Thatcham

     

    52
    Newbury Racecourse

     

     

     

    53¾
    Newbury

     

     

     

     

     

    58
    Kintbury

     

    61½
    Hungerford
     

     

     

    66
    Bedwyn

     

     

     

     

     

     

     

     

     

    70¾
    Savernake Low Level
     

     

     

     

     

     

     

    Burbage goods

     

    Wootton Rivers Halt

     

    75¼
    Pewsey

     

    Manningford Halt

     

    78
    Woodborough

     

    Patney and Chirton

     

     

     

    88¾
    Lavington

     

    Edington and Bratton

     

     

     

    94½
    Heywood Road Junction

     

     

     

     

     

    95½
    Westbury

     

     

     

     

    97¾
    Fairwood Junction

     

    100¼
    Clink Road Junction

     

     

     

     

     

    101¼
    Frome

     

    102¼
    Blatchbridge Junction

     

    Witham

     

     

     

    106½

     

    Strap Lane Halt

     

    111⅝
    Bruton

     

     

     

     

    116⅛
    Castle Cary

     

     

     

    Alford Halt

     

    Keinton Mandeville

     

    Charlton Mackrell

     

    Somerton

     

    Long Sutton and Pitney

     

    Langport East

     

     

     

    Athelney

     

    Athelney Junction

     

     

    Lyng Halt

     

     

     

     

     

    Durston
     
     

     

     

     

     

     

    138⅞

     

     

    Creech St Michael

     

     

     

    143⅝
    Taunton

     

    Reading to Bedwyn

    edit
    Communities served
    ReadingThealeAldermastonMidgham and WoolhamptonThatchamNewburyKintburyHungerfordGreat Bedwyn

    After Reading railway station the line curves to the left to follow the route of the old Berks and Hants Railway.[3][page needed] The Great Western Main Line is on the right and between the two routes is the former Reading TMD, now an engineering depot.

    Just beyond the depot lies Reading West, a local station that is elevated above a road at one end but is in a deep cutting at the other. At the far end of the cutting is Southcote Junction where the line to Plymouth curves sharply to the right away from the other Berks and Hants Line to Basingstoke. A third line used to curve to the left to a goods depot but this is long closed and the trackbed blocked by a footpath.

    The route, which is marketed as the "Kennet Line", follows the River Kennet through the outer suburbs of Reading to Theale. The line passes through Berkshire countryside and local stations at Aldermaston, Midgham and Thatcham.

    Newbury race course lies alongside the line on the left and has its own station a short distance east of the main Newbury railway station, where the town centre is close by on the right of the line. The station has a bay platform on the right for local terminating trains, and the through platforms are on loop lines that allow fast trains to overtake the local services that continue beyond the town. Some long-distance trains also call here.[7]

    Beyond Newbury the railway follows the route of the Kennet and Avon Canal which crosses below to run on the left side of the line through Kintbury then crosses back to the right before it reaches Hungerford. The line crosses into Wiltshire and the canal crosses back to the left to run close beside the line through Little Bedwyn to reach Bedwyn railway station which is actually in Great Bedwyn. This is the outer limit of the London suburban services[8] and there is a turn-back siding on the right just beyond the station.

    On to Taunton

    edit
    Communities served
    PewseyWestburyFromeBrutonCastle CaryTaunton

    Long-distance trains continue to follow the Kennet and Avon Canal which runs along the line. Beam engines are preserved at Crofton Pumping Station that once pumped water to the summit level of the canal. The canal goes beneath the line in a 500 yards (457 m) tunnel[2][page needed] beneath the site of the closed Savernake Low Level railway station, and the remains of the bridge that carried the Midland and South Western Junction Railway. There was never a station at Burbage but the siding served a wharf which allowed transhipment of goods between the canal and railway.

    Some trains call at Pewsey railway station, where one platform building is a replica of an earlier building but the building on the main platform is original. The site of Patney and Chirton railway station marks the start of a cut-off line that avoided the long loop (to the right) through Devizes railway station on the Berks and Hants Extension Railway.

     
    A westbound service from London passing Westbury with the Westbury White Horse in the background

    Approaching Westbury, non-stop trains curve to the left to pass under the Wessex Main Line and avoid the complex of junctions around the station, but trains that call here diverge to the right at Heywood Road Junction. Another line curves sharply to the right to join the Wessex Main Line towards Trowbridge at Hawkeridge Junction, a route that forms a diversionary route for the Great Western Main Line. The line curves left past the Panel Signal Box to join the Wessex Main Line in the opposite direction and enter the station.

    There are sidings on both sides of the line west of the station. On the right are those used for stabling the local DMUs between services, and a Network Rail distribution centre for ballast. The sidings on the left are mainly used by stone trains from Mendips quarries further west along the line. Our line diverges right from the Wessex Main Line (which continues towards Salisbury) and curves around behind the virtual quarry to reach Fairwood Junction where trains that avoided the station rejoin the historic route, which here was constructed by the Wilts, Somerset and Weymouth Railway.

    Crossing from Wiltshire into Somerset, the line passes through Clink Road Junction, where a branch line diverges on the right to Frome railway station, where a rare wooden train shed survives,[9][page needed] and Whatley Quarry. Frome is served by Heart of Wessex Line local services[10] but few long-distance trains call there[10] instead of following the avoiding line to Blatchbridge Junction.

    The next junction on the right is at Witham, where the old East Somerset Railway carries stone trains from Merehead Quarry and continues to Cranmore. After passing through Bruton railway station, the line passes the remains of the Somerset and Dorset Joint RailwayatCole, and then arrives at the junction station at Castle Cary. Here it curves right, away from the Heart of Wessex Line which continues to Weymouth via Yeovil Pen Mill, a diversionary route that is used when the usual route to Exeter is blocked.

    The main line is now on the Langport and Castle Cary Railway that opened on 2 July 1906 to shorten the so-called "Great Way Round" via Bristol.[2][page needed][4][page needed] After passing through Somerton Tunnel the line soon finds itself crossing the low-lying and comes onto the Somerset Levels and on to Langport and Curry Rivel Junction, where the old Yeovil branch line.[4][page needed] used to join from the left, only to diverge right at Athelney to join the Bristol to Taunton LineatDurston. The 1906 openings saw an additional cut-off from Athelney to Cogload Junction where the line joins the route from Bristol, the old Bristol and Exeter Railway.[4][page needed] The Taunton and Bridgwater Canal runs alongside the railway. The line passes the site of Creech St Michael railway station and the junction of the former Chard Branch Line.[4][page needed]

    Current services

    edit
     
    AHigh Speed Train crosses Langport Viaduct (between Castle Cary and Taunton).

    Passenger services on the route are operated by Great Western Railway (GWR). These are principally Class 802s from London Paddington to Plymouth, PaigntonorPenzance. There is also an overnight Night Riviera sleeper service. Some other services between these places are routed between Reading and Taunton along the Great Western Main Line to Bristol, and then on to the Bristol to Taunton Line, thereby missing this Reading to Taunton line entirely. A few services from London travel only part way along the line, terminating at WestburyorFrome.[7] GWR also provide local services along parts of the line, between Reading and Bedwyn,[8] and between Westbury and Castle Cary.[10]

    Infrastructure

    edit

    The route is double-track throughout, with passing loops at certain locations.[11] The highest line-speed on the route is 110 mph (180 km/h).[12] The route has a loading gauge clearance of W7 except Reading to Westbury which is the larger W8, and is open to rolling stock up to Route Availability 8. Signalling requires four minutes between trains on most of the route, but 8 minutes approaching Cogload Junction. Signalling is by multiple-aspect signals, controlled from panel signal boxes at Reading, Westbury and Exeter, and level-crossing boxes at Colthrop (near Thatcham) and Kintbury.[12] Most of the signals are three-aspect, but some sections of two- or four-aspect signalling also exist. During 2010, control of the area signalled by Reading panel transferred to a new Thames Valley Signalling Control Centre at Didcot.[13]

    2007 plans

    edit

    The Network Rail Business Plan (2007) says the heaviest traffic flows are on the section through Newbury, from where there is large commuter traffic to London. The main pinch-point is between Reading West and Southcote Junction where the route is shared with trains to and from Basingstoke and south-coast ports. It was forecast in the report that demand for journeys towards London can be met up to 2016 by increased service levels; three trains each hour will be needed to the west of England. By 2026 seating demand was forecast to be in excess of capacity from as far west as Westbury, and by as much as 14%.[11]

    Plans for the route included making the down loop at Newbury Racecourse reversible to improve train handling on race days; the extension of the turnback siding at Bedwyn to accommodate six-car DMUs; increase line speed as far as Cogload Junction; a third track from there and direct access to the northern bay platform at Taunton.[11]

    Electrification

    edit

    The section between Reading and Newbury was earmarked for electrification as part of a scheme to electrify the Great Western Main Line, to allow commuter services to use electrically powered trains to run the entire distance from London Paddington to Newbury. A 2009 DfT white paper called for electric services beyond Reading to be operated by cascaded and completely modernised Class 387 commuter trains from the end of 2018. This would allow the existing DMUs that operate on this section to be cascaded to the Bristol area, the South West and Northern England.[14] Electrification from Reading to Newbury was completed in January 2019.[15]

    As part of this work, changes were made to the layout of Reading station which included the building of a bridge to carry the main lines of the Reading to Didcot route over the Taunton to Reading line to remove conflicts between the two routes. An additional four platforms were built on the north side of Reading station for the relief lines, allowing the existing platforms to be used mostly by fast trains between London and the West.[16][17] The improved station was officially opened by the Queen in July 2014, and railway upgrades in the area were completed in the summer of 2015.[18][19]

    Accidents

    edit

    Serious incidents on the line include:

    References

    edit
    1. ^ "Named railway lines". National Rail. Retrieved 24 March 2015.
  • ^ a b c Leigh, Chris (1988). Railway World Special: Cornish Riviera. Shepperton: Ian Allan Publishing. ISBN 0-7110-1797-2.
  • ^ a b c d e f g h i j k l MacDermot, E.T. (1927). History of the Great Western Railway. Vol. I 1833-1863. London: Great Western Railway.
  • ^ a b c d e MacDermot, E.T. (1931). History of the Great Western Railway. Vol. II 1863-1921. London: Great Western Railway.
  • ^ R Tourret, GWR Engineering Work 1928–1938, Tourret Publishing, Abingdon, 2003, ISBN 0 905878 08 6
  • ^ Railway Electrification. British Railways Board (Central Publicity Unit). Winter 1979. pp. 0–2, 8.
  • ^ a b "National Rail Timetable 135 (Winter 2007)" (PDF). Network Rail.
  • ^ a b "National Rail Timetable 116 (Winter 2007)" (PDF). Network Rail.
  • ^ Oakley, Mike (2006). Somerset Railway Stations. Bristol: Redcliffe Press. ISBN 1-904537-54-5.
  • ^ a b c "National Rail Timetable 123 (Winter 2007)" (PDF). Network Rail.
  • ^ a b c "Network Rail Business Plan 2007: Route 12" (PDF). Network Rail.
  • ^ a b "Baseline Declaration: Track and Route Mileage: Line-speeds: Western Route" (PDF). Network Rail.
  • ^ "Route Plans 2009: Route 12 - Reading to Penzance" (PDF). Network Rail.
  • ^ "DfT White Paper: Rail Electrification" (PDF). Department for Transport. Archived from the original (PDF) on 7 April 2010.
  • ^ "Electrified railway line goes live". BBC News: England. 2 January 2019. Retrieved 12 April 2019.
  • ^ "Reading Development Plan". Network Rail.
  • ^ "Reading Station Map" (PDF). Network Rail.
  • ^ "Queen opens revamped Reading station". BBC News: Berkshire. 17 July 2014. Retrieved 12 April 2019.
  • ^ "Modernising the Great Western route". Network Rail. Retrieved 12 April 2019.
  • ^ Department of Transport; King, Major A.G.B. (1980). Railway Accident: Report on the Fire that occurred in a Sleeping-Car Train on 6th July 1978 at Taunton in the Western Region, British Railways. HMSO. ISBN 0-11-550513-X – via Railways Archive.
  • ^ "Six die as train ploughs into car". BBC News. 7 November 2004.
  • Further reading

    edit


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Reading–Taunton_line&oldid=1233749628"
     



    Last edited on 10 July 2024, at 18:00  





    Languages

     



    This page is not available in other languages.
     

    Wikipedia


    This page was last edited on 10 July 2024, at 18:00 (UTC).

    Content is available under CC BY-SA 4.0 unless otherwise noted.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Terms of Use

    Desktop