No edit summary
|
mNo edit summary
|
||
(6 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description| |
{{Short description|Under-construction mixed-use skyscraper development in Downtown Detroit}} |
||
{{About|the under-construction skyscraper in downtown Detroit|the department store chain whose flagship store once stood on the site|Hudson's}}{{Infobox building |
|||
{{Infobox building |
|||
| name = Hudson's |
| name = Hudson's Detroit |
||
| image = HudsonsSite10-15.jpg |
| image = HudsonsSite10-15.jpg |
||
| caption = Construction progress as of October 2023 |
| caption = Construction progress as of October 2023 |
||
| location = 1208 [[M-1 (Michigan highway)|Woodward Avenue]], Detroit, MI 48226 |
| location = 1208 [[M-1 (Michigan highway)|Woodward Avenue]], Detroit, MI 48226 |
||
| coordinates = {{coord|42.33389|-83.04809|region:US-MI|display=inline,title}} |
| coordinates = {{coord|42.33389|-83.04809|region:US-MI|display=inline,title}} |
||
| status = Under |
| status = Under construction |
||
| start_date = December 2017 |
| start_date = December 2017 |
||
| est_completion = 2024 |
| est_completion = 2024 |
||
Line 14: | Line 14: | ||
| height = {{convert|208.7|m|ft|sp=us}}<ref name="Site">{{cite web |title=Hudson's Site |url=https://www.hudsonssitedetroit.com/ |website=Hudson's Site |publisher=Bedrock Management Services LLC |access-date=22 May 2022}}</ref> |
| height = {{convert|208.7|m|ft|sp=us}}<ref name="Site">{{cite web |title=Hudson's Site |url=https://www.hudsonssitedetroit.com/ |website=Hudson's Site |publisher=Bedrock Management Services LLC |access-date=22 May 2022}}</ref> |
||
| floor_area = {{convert|130064|m2|sqft|sp=us|abbr=on}} |
| floor_area = {{convert|130064|m2|sqft|sp=us|abbr=on}} |
||
| public_transit = [[Detroit People Mover]] at [[Cadillac Center station]] |
| public_transit = [[Detroit People Mover]] at [[Cadillac Center station]]<br>[[QLine|QLINE]] at [[Campus Martius station]]<br>[[Detroit Department of Transportation|DDOT]] 4 |
||
| topped_out_date = April 10, 2024 |
|||
[[QLine|QLINE]] at [[Campus Martius station]] |
|||
[[Detroit Department of Transportation|DDOT]] 4 |
|||
| developer = Bedrock Detroit |
| developer = Bedrock Detroit |
||
| website = https://www.hudsonssitedetroit.com/ |
| website = https://www.hudsonssitedetroit.com/ |
||
}} |
}} |
||
''' |
'''Hudson's Detroit''' is an under-construction mixed-use development located in [[Downtown Detroit|Downtown]] [[Detroit, Michigan]], United States. Located on the former site of [[Hudson's|J.L Hudson's]] [[J. L. Hudson Department Store and Addition|Flagship Store]], it is expected to be the [[List of tallest buildings in Detroit|second tallest building in Detroit]] as well as Michigan, at {{convert|208.7|m|ft|sp=us}}<ref name="Site"/><ref>{{Cite web|url=https://www.crainsdetroit.com/real-estate/hudsons-site-tower-will-not-be-tallest-michigan-after-all-ceo-gilberts-bedrock-says|title = Hudson's site tower will not be tallest in Michigan after all, CEO for Gilbert's Bedrock says|date = 29 January 2020}}</ref> and to be completed in 2024.<ref>{{cite web |last1=Mondry |first1=Aaron |title=Development news roundup: impact of coronavirus, Hudson's tower height revealed |url=https://detroit.curbed.com/2020/3/20/21188357/detroit-development-hudsons-tower-coronavirus-construction |website=Curbed Detroit |date=20 March 2020 |access-date=15 June 2021}}</ref><ref>{{Cite web |date=2022-01-12 |title=Detroit Hudson's Site expected to be complete in 2024 despite challenges, changes |url=https://www.wxyz.com/news/detroit-hudsons-site-expected-to-be-complete-in-2024-despite-challenges-changes |access-date=2022-04-18 |website=WXYZ |language=en}}</ref> |
||
== Site == |
== Site == |
||
Line 34: | Line 33: | ||
== History == |
== History == |
||
In 2013, after over a decade of little activity at the site, [[Rock Ventures]] announced that SHoP Architects had been selected to lead the design process for the area.<ref>{{Cite web|date=2013-11-25|title=New York-based SHoP Architects selected to design development at former Hudson's site in downtown Detroit|url=https://www.mlive.com/business/detroit/2013/11/new_york-based_shop_architects.html|access-date=2021-03-12|website=mlive|language=en}}</ref> In 2017, construction began with the removal of the underground parking garage that had been built in 2001. In March 2020, construction progress was halted due to the [[COVID-19 pandemic]], but resumed after 45 days.<ref name=":1"/> In December of the same year, construction reached above the ground for the first time. |
In 2013, after over a decade of little activity at the site, [[Rock Ventures]] announced that SHoP Architects had been selected to lead the design process for the area.<ref>{{Cite web|date=2013-11-25|title=New York-based SHoP Architects selected to design development at former Hudson's site in downtown Detroit|url=https://www.mlive.com/business/detroit/2013/11/new_york-based_shop_architects.html|access-date=2021-03-12|website=mlive|language=en}}</ref> In 2017, construction began with the removal of the underground parking garage that had been built in 2001. In March 2020, construction progress was halted due to the [[COVID-19 pandemic]], but resumed after 45 days.<ref name=":1"/> In December of the same year, construction reached above the ground for the first time. |
||
The tower was topped out on April 10, 2024; two days later on April 12, its final name, Hudson's Detroit, was announced.<ref>{{Cite web |last=Pinho |first=Kirk |date=2024-04-12 |title= |url=https://www.crainsdetroit.com/real-estate/dan-gilberts-hudsons-site-project-named-hudsons-detroit#/}}</ref> |
|||
==Tenants== |
|||
[[General Motors]] announced on April 15, 2024 that it would relocate its global headquarters from [[Renaissance Center]] to Hudson's Detroit in 2025. As the anchor tenant, GM will lease the two top floors of the mid-rise building and utilize space on the ground floor as a company showroom.<ref>{{Cite web |title=GM to move headquarters from RenCen to Hudson's site |url=https://www.detroitnews.com/story/business/autos/general-motors/2024/04/15/gm-to-move-headquarters-from-rencen-to-hudsons-site/73326824007/ |access-date=2024-04-15 |website=The Detroit News |language=en-US}}</ref> |
|||
On April 17, 2024, Bedrock announced that the tower would consist of an EDITION five-star hotel and 97 luxury condominiums to be completed by 2027.<ref>{{Cite web |title=Luxury hotel and condos will occupy Hudson's Detroit tower |url=https://www.detroitnews.com/story/business/2024/04/17/5-star-hotel-and-luxury-condos-will-occupy-hudsons-detroit-tower/73358115007/ |access-date=2024-04-19 |website=The Detroit News |language=en-US}}</ref> |
|||
== Gallery == |
== Gallery == |
Hudson's Detroit | |
---|---|
![]()
Construction progress as of October 2023
| |
![]() | |
General information | |
Status | Under construction |
Location | 1208 Woodward Avenue, Detroit, MI 48226 |
Coordinates | 42°20′02″N 83°02′53″W / 42.33389°N 83.04809°W / 42.33389; -83.04809 |
Construction started | December 2017 |
Topped-out | April 10, 2024 |
Estimated completion | 2024 |
Cost | $1.4 billion |
Height | 208.7 meters (685 ft)[1] |
Technical details | |
Floor area | 130,064 m2 (1,400,000 sq ft) |
Design and construction | |
Architect(s) | SHoP Architects Hamilton Anderson Associates |
Developer | Bedrock Detroit |
Other information | |
Public transit access | Detroit People MoveratCadillac Center station QLINEatCampus Martius station DDOT4 |
Website | |
https://www.hudsonssitedetroit.com/ |
Hudson's Detroit is an under-construction mixed-use development located in Downtown Detroit, Michigan, United States. Located on the former site of J.L Hudson's Flagship Store, it is expected to be the second tallest building in Detroit as well as Michigan, at 208.7 meters (685 ft)[1][2] and to be completed in 2024.[3][4]
1208 Woodward Avenue is situated in Downtown Detroit, bounded by Grand River Avenue to the north, Farmer Street to the east, and Gratiot Avenue to the south. The entire block was once the home to Hudson's flagship store, which was built in phases between 1911 and 1946. It was the tallest department store in the world, at 440 ft (134 m), and the second largest department store by area in the world, behind Macy's Herald SquareinNew York City.[5] In 1998, the building was imploded following 12 years of closure, making it the tallest building to ever be demolished by controlled implosion.[6] In 2001, an underground parking garage was constructed at the site, with supports for a future structure to be built atop.[7]
The development, designed by SHoP Architects, will consist of two buildings:[8] A 14-story 70.7 meters (232 ft)[9] mid-rise that will contain retail, office and event space, as well as a 208.7 meters (685 ft)[1][10] tall tower that will contain exhibition space, residential units, and a hotel. The buildings will be linked by a 700-space underground parking garage.[11]
In 2013, after over a decade of little activity at the site, Rock Ventures announced that SHoP Architects had been selected to lead the design process for the area.[12] In 2017, construction began with the removal of the underground parking garage that had been built in 2001. In March 2020, construction progress was halted due to the COVID-19 pandemic, but resumed after 45 days.[8] In December of the same year, construction reached above the ground for the first time.
The tower was topped out on April 10, 2024; two days later on April 12, its final name, Hudson's Detroit, was announced.[13]
General Motors announced on April 15, 2024 that it would relocate its global headquarters from Renaissance Center to Hudson's Detroit in 2025. As the anchor tenant, GM will lease the two top floors of the mid-rise building and utilize space on the ground floor as a company showroom.[14]
On April 17, 2024, Bedrock announced that the tower would consist of an EDITION five-star hotel and 97 luxury condominiums to be completed by 2027.[15]
Construction Progress
{{cite web}}
: Missing or empty |title=
(help)