Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Flotation  





1.2  Merger with Iberdrola  







2 Contract in the US  





3 Wind power contract with Gamesa  





4 See also  





5 References  





6 External links  














Iberdrola Renovables: Difference between revisions






Català
Deutsch
Español
Français
Română
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




Print/export  



















Appearance
   

 





Help
 

From Wikipedia, the free encyclopedia
 


Browse history interactively
 Previous editNext edit 
Content deleted Content added
Nachomarina (talk | contribs)
24 edits
Nachomarina (talk | contribs)
24 edits
→‎Flotation: Eliminate a link that didn't work.
Line 44: Line 44:

The company was listed on the [[Bolsa de Madrid|Madrid Stock Exchange]] in December 2007 in an [[initial public offering]].<ref>{{cite news|url=http://www.bloomberg.com/apps/news?pid=20601085&sid=aOTq_88747JA&refer=europe|title=Iberdrola Unit Drops in Debut After $6 Billion IPO|last=Rix|first=Kristian|date=13 December 2007|work=[[Bloomberg L.P.|Bloomberg]] |accessdate=2008-09-20}}</ref> 844,812,980&nbsp;new shares were placed at a price of €5.3 each. The operation totalled €5&nbsp;billion, the largest placement ever made on the Spanish market by a new company.{{cn|date=August 2011}}

The company was listed on the [[Bolsa de Madrid|Madrid Stock Exchange]] in December 2007 in an [[initial public offering]].<ref>{{cite news|url=http://www.bloomberg.com/apps/news?pid=20601085&sid=aOTq_88747JA&refer=europe|title=Iberdrola Unit Drops in Debut After $6 Billion IPO|last=Rix|first=Kristian|date=13 December 2007|work=[[Bloomberg L.P.|Bloomberg]] |accessdate=2008-09-20}}</ref> 844,812,980&nbsp;new shares were placed at a price of €5.3 each. The operation totalled €5&nbsp;billion, the largest placement ever made on the Spanish market by a new company.{{cn|date=August 2011}}



The company joined the benchmark [[IBEX 35]] index in a February 2008 [[reshuffle]].<ref>{{cite news|url=http://www.forbes.com/markets/feeds/afx/2008/01/29/afx4587438.html|title=Criteria, Iberdrola Renovables to replace Altadis, AGBAR in IBEX-35 index Feb 4|date=29 January 2008|work=[[AFX News]]|publisher=[[Forbes]]|accessdate=2008-09-20}}</ref>

The company joined the benchmark [[IBEX 35]] index in a February 2008 reshuffle.



===Merger with Iberdrola===

===Merger with Iberdrola===


Revision as of 12:28, 20 September 2011

Iberdrola Renovables
Company typeSociedad Anónima Unipersonal

Traded as

BMAD:IBR
IndustryRenewable energy
Founded2001 (2001)
DefunctJuly 11, 2011 (2011-07-11)
FateMerged with Iberdrola
Headquarters ,

Key people

Ignacio Galán (president)
Xavier Viteri (CEO)
ParentIberdrola

Iberdrola Renovables was a subsidiary of Iberdrola, headquartered in Valencia, Spain, which included companies in the domains of renewable energy, particularly wind power. The firm was the world's largest renewable energy firm[1]: it was the world's largest owner-operator of wind farms,[2] but also operated in the solar, hydro, biomass and wave power industries.

History

Iberdrola Renovables was registered in Madrid following its incorporation in 2001. It started as a wholly owned business unit of Iberdrola under the name Iberenova,[3]

In 2009 the company changed its registered office to Valencia. However, it still had a strong presence in Madrid and in Bilbao, its birthplace.

Flotation

The company was listed on the Madrid Stock Exchange in December 2007 in an initial public offering.[4] 844,812,980 new shares were placed at a price of €5.3 each. The operation totalled €5 billion, the largest placement ever made on the Spanish market by a new company.[citation needed]

The company joined the benchmark IBEX 35 index in a February 2008 reshuffle.

Merger with Iberdrola

In July 2011, Iberdrola Renovables merged with its parent company Iberdrola, so is now the Iberdrola's renewable business.[5]

Contract in the US

In 2009 Iberdrola Renovables signed the biggest renewable energy sales contract in its history with the Tennessee Valley Authority (TVA), according to a press release issued by the company. The 20-year agreement guarantees the return during that time on all output of the Cayuga Ridge wind farm, which has installed capacity of 300 megawatts (MW). It also allows the US public company, TVA to take a further step in its plan to add a further 2,000 MW of wind capacity to the system. The Cayuga Ridge wind farm is located south of Chicago near the towns of Odell and Emington in Illinois. Iberdrola Renovables has built this facility, able to meet the average electricity consumption of 100,500 US households, using the US government’s renewable energy stimulus funds (grants).[citation needed]

Wind power contract with Gamesa

Gamesa Eólica and Iberdrola Renovables signed the largest supply in the power sector, for total capacity of 4,500 MW slated to come on to the market between 2010 and 2012. The investment associated with this capacity will amount to approximately €6,300 million, a figure that includes the turbines and other costs such as transport, civil works and all power connections, both at the wind farms themselves and those made to the grid. A strategic agreement was also signed to jointly develop the wind farm promotion, development and operation businesses in Spain and Continental Europe. According to the terms of the agreement, Iberdrola Renovables will deploy the wind turbines in its wind farm developments in Spain, the rest of Europe, the United States and Mexico. The agreement includes the assembly and start up of the wind turbines, and operating and maintenance services over the guarantee period.[citation needed]

See also

References

  1. ^ "UPDATE 3-EDP Renewables shares slip on bourse debut". Reuters. 2008-06-04.
  • ^ "Iberdrola to float world's largest wind-power company: report". MarketWatch. 9 September 2007. Retrieved 2008-09-20.
  • ^ "Iberdrola to raise up to 4 bln eur in Iberenova float - report". AFX News. Forbes. 9 September 2007. Retrieved 2008-09-20.
  • ^ Rix, Kristian (13 December 2007). "Iberdrola Unit Drops in Debut After $6 Billion IPO". Bloomberg. Retrieved 2008-09-20.
  • ^ Iberdrola and Iberdrola Renovables approve merger plan, 03/22/2011 [1]
  • External links


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Iberdrola_Renovables&oldid=451491796"

    Categories: 
    Power companies of Spain
    Renewable energy companies
    Wind power companies
    Renewable energy in Spain
    Hidden categories: 
    All articles with unsourced statements
    Articles with unsourced statements from August 2011
     



    This page was last edited on 20 September 2011, at 12:28 (UTC).

    This version of the page has been revised. Besides normal editing, the reason for revision may have been that this version contains factual inaccuracies, vandalism, or material not compatible with the Creative Commons Attribution-ShareAlike License.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki