Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Firing room  





2 Key personnel  



2.1  Launch Director (LD)  





2.2  Flow Director (FD)  





2.3  NASA Test Director (NTD)  





2.4  Orbiter Test Conductor (OTC)  





2.5  Tank/Booster Test Conductor (TBC)  





2.6  Payload Test Conductor (PTC)  





2.7  Launch Processing System Coordinator (LPS)  





2.8  Support Test Manager (STM)  





2.9  Safety Console Coordinator (SAFETY)  





2.10  Shuttle Project Engineer (SPE)  





2.11  Landing and Recovery Director (LRD)  





2.12  Superintendent of Range Operations (SRO)  





2.13  Ground Launch Sequencer Engineer (CGLS)  







3 See also  





4 References  



4.1  Sources  







5 External links  














Launch Control Center: Difference between revisions






Français
ि
Bahasa Indonesia
Italiano

Svenska
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




Print/export  







In other projects  



Wikimedia Commons
 
















Appearance
   

 





Help
 

From Wikipedia, the free encyclopedia
 


Browse history interactively
 Previous editNext edit 
Content deleted Content added
→‎External links: broken link
Line 99: Line 99:


[[Category:Kennedy Space Center]]

[[Category:Kennedy Space Center]]

[[Category:Buildings and structures in Brevard County, Florida]]

[[Category:Buildings and structures in Merritt Island, Florida]]

[[Category:National Register of Historic Places in Brevard County, Florida]]

[[Category:National Register of Historic Places in Brevard County, Florida]]


Revision as of 18:34, 6 March 2014

Launch Control Center

U.S. National Register of Historic Places

LC-39 Launch Control Center
Launch Control Center is located in Florida
Launch Control Center

Nearest cityTitusville, Florida
MPSJohn F. Kennedy Space Center MPS
NRHP reference No.99001645[1]
Added to NRHPJanuary 21, 2000

The Launch Control Center (LCC) is a four-story building located at NASA's Kennedy Space CenteronMerritt Island, Florida used for the supervision of launches from Launch Complex 39. In practice, this means that the LCC handles all American manned space flights. Attached to the southeast corner of the Vehicle Assembly Building, the LCC contains offices; telemetry, tracking and instrumentation equipment; the automated Launch Processing System; and four firing rooms.

Launches have been conducted from the LCC since the unmanned Apollo 4 (Apollo-Saturn 501) launch on November 9, 1967; its first manned launch was Apollo 8 on December 21, 1968.

Firing room

Firing Room 1 configured for space shuttle launches
Firing Room 2 as it appeared in the Apollo era
A Saturn I-B control panel from an Apollo-era Firing Room

Launch operations are supervised and controlled from the firing room. Responsibility for the booster and spacecraft remains with the LCC until the booster has cleared the launch tower, when responsibility is handed over to the Mission Control CenteratJohnson Space Center.

Extensive renovation of Firing Room 4 was finished in 2006.

Key personnel

Launch Director (LD)

The Launch Director is the head of the launch team, and is responsible for making the final "go" or "no go" decision for launch after polling the relevant team members.

Flow Director (FD)

The Flow Director is responsible for the preparation of the spacecraft for launch, and remains in the LCC in an advisory capacity.

NASA Test Director (NTD)

The NASA Test Director is responsible for all pre-launch testing, whether involving the flight crew, the orbiter, the external tank/solid rocket booster, or ground support equipment. The NTD is also responsible for the safety of all personnel on the pad after fuelling has occurred. Reports to the Launch Director.

Orbiter Test Conductor (OTC)

The Orbiter Test Conductor is in charge of all pre-flight checkout and testing of the orbiter, and manages the engineers in the firing room who monitor the orbiter's systems. OTC is an employee of a contractor rather than of NASA.

Tank/Booster Test Conductor (TBC)

Payload Test Conductor (PTC)

The Payload Test Conductor is responsible for the pre-flight test and checkout of payloads carried by the orbiter and manages the engineering and test teams responsible for monitoring and controlling payload ground operations. PTC is a contractor member of the Space Shuttle Team.

Launch Processing System Coordinator (LPS)

The LPS Coordinator monitors and oversees the LPS System; specifically, the desired launch rate, Space Shuttle stacking (assembly), and all safety requirements. This is made possible by the Launch Processing System, or LPS — a highly automated, computer-controlled system that oversees the entire checkout and launch process.[2]

Support Test Manager (STM)

Safety Console Coordinator (SAFETY)

Shuttle Project Engineer (SPE)

Landing and Recovery Director (LRD)

Superintendent of Range Operations (SRO)

The Superintendent of Range Operations ensures that all tracking and communications systems are ready to support the launch operation as well as ensuring that downrange airspace and splashdown areas remain clear for launch, and monitors weather near the launch site.

Ground Launch Sequencer Engineer (CGLS)

The Ground Launch Sequencer Engineer is responsible for monitoring the operation of the automated Ground Launch Sequencer system, which controls the countdown from T-9 minutes until launch. After this point through to T-31 seconds, they are in charge of implementing a manual hold if necessary. After T-31 seconds however only cutoff is available and will result in a recycle of the countdown to T-20 minutes and a scrub of the launch. The request for a cutoff is phrased "CGLS, give cutoff."

See also

References

  1. ^ "National Register Information System". National Register of Historic Places. National Park Service. July 9, 2010.
  • ^ NASA: KSC Launch Control Center
  • Sources

    External links


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Launch_Control_Center&oldid=598432754"

    Categories: 
    Kennedy Space Center
    Buildings and structures in Merritt Island, Florida
    National Register of Historic Places in Brevard County, Florida
    Hidden categories: 
    Articles using NRISref without a reference number
    Wikipedia articles in need of updating from October 2013
    All Wikipedia articles in need of updating
    Articles with short description
    Short description is different from Wikidata
    Pages using infobox NRHP with unknown parameters
    Use American English from January 2014
    All Wikipedia articles written in American English
     



    This page was last edited on 6 March 2014, at 18:34 (UTC).

    This version of the page has been revised. Besides normal editing, the reason for revision may have been that this version contains factual inaccuracies, vandalism, or material not compatible with the Creative Commons Attribution-ShareAlike License.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki