Line 41: | Line 41: | ||
* during the day, less water is diverted from the Niagara River through the tunnels to maintain a visually appealing flow of water over the Falls as established via treaty between the U.S. and Canada. |
* during the day, less water is diverted from the Niagara River through the tunnels to maintain a visually appealing flow of water over the Falls as established via treaty between the U.S. and Canada. |
||
* during the day, to compensate for the reduced water flow into the forebay from the river tunnels, the forebay is also filled with water released from the upper reservoir. This water flows from the upper reservoir, through the 12 pump-turbines of the Lewiston Pump-Generating Plant and into the forebay, and then into the turbines of the Robert Moses Niagara Power Plant, finally ending up in the lower Niagara River. The upper reservoir contains about 22 billion gallons maximum and is about 1900 acres in surface area. |
* during the day, to compensate for the reduced water flow into the forebay from the river tunnels, the forebay is also filled with water released from the upper reservoir. This water flows from the upper reservoir, through the 12 pump-turbines of the Lewiston Pump-Generating Plant and into the forebay, and then into the turbines of the Robert Moses Niagara Power Plant, finally ending up in the lower Niagara River. The upper reservoir contains about 22 billion gallons maximum and is about 1900 acres in surface area. |
||
* at night, some of the water flowing into the forebay is pumped up into the upper reservoir by reversing the pump-generators in the Lewiston Pump-Generating Plant. This flow largely replaces the amount of water that was released from the upper reservoir earlier in the day. |
* at night, some of the water flowing into the forebay flows through the Robert Moses Niagara Power Plant turbines, and some is pumped up into the upper reservoir by reversing the pump-generators in the Lewiston Pump-Generating Plant. This pumped flow largely replaces the amount of water that was released from the upper reservoir earlier in the day (over time, it exactly replaces the amount released, but on any given day the amounts released from and pumped back into the upper reservoir may be different as power demand and power cost fluctuate day-to-day). |
||
All water that flows through the tunnels only passes through the Robert Moses Niagara Power Plant turbines once. Some of the tunneled water also passes twice through the pump-turbines of the Lewiston Pump-Generating Plant (once to pump up the water into the upper reservoir, and again when the upper reservoir releases water to drop through the pump-turbines and into the forebay). Virtually all of the water that drops through the Lewiston Pump-Generating Plant pump-turbines was previously pumped up through the pump-turbines. The only water that drops through the pump-turbines that was not previously pumped up into the upper reservoir is the rainwater that collects into the upper reservoir (an amount I don't know). Anyone who sees the need to "get cute" and describe how any water is "used twice" needs to be very clear on these aspects to ensure the cuteness does not introduce inaccuracies as in the current article text, or miss the point of uniqueness at Niagara Falls. Assuming for the moment that "used twice" makes sense, its use in the current article makes it seem like the pump-generator system is similar to other pump-generator installations, and that is very inaccurate. I think it is more insightful to point out that the water that is pumped up into the upper reservoir is "pumped once and dropped twice" to an elevation far below its starting elevation in the forebay, thus generating immense amounts of power that constant elevation pump generating stations cannot achieve ("constant elevation" in the sense that the starting elevation of pumped water is the same elevation of the water after it drops through the pump-generators). The "pumped once, dropped twice" situation at Niagara Falls is unique to large natural waterfalls that have been converted to hydroelectric operation (anyone please chime in with a list of such sites - it should be just a small subset of the list at [[List_of_pumped-storage_hydroelectric_power_stations]] |
All water that flows through the tunnels only passes through the Robert Moses Niagara Power Plant turbines once. Some of the tunneled water also passes twice through the pump-turbines of the Lewiston Pump-Generating Plant (once to pump up the water into the upper reservoir, and again when the upper reservoir releases water to drop through the pump-turbines and into the forebay). Virtually all of the water that drops through the Lewiston Pump-Generating Plant pump-turbines was previously pumped up through the pump-turbines. The only water that drops through the pump-turbines that was not previously pumped up into the upper reservoir is the rainwater that collects into the upper reservoir and does not evaporate before use (an amount I don't know), which may or may not offset the amount of pumped water that evaporates in the upper reservoir (another amount I don't know). I believe these slight losses and offsets can be credibly mentioned as slight without quantification or any reference link, since that's what is done for the same losses in the general pump-storage wiki article (if these amounts were significant, we'd be able to find a bunch of engineering articles dealing with them). Anyone who sees the need to "get cute" and describe how any water is "used twice" needs to be very clear on these aspects to ensure the cuteness does not introduce inaccuracies as in the current article text, or miss the point of uniqueness at Niagara Falls. Assuming for the moment that "used twice" makes sense, its use in the current article makes it seem like the pump-generator system is similar to other pump-generator installations, and that is very inaccurate. I think it is more insightful to point out that the water that is pumped up into the upper reservoir is "pumped once and dropped twice" to an elevation far below its starting elevation in the forebay, thus generating immense amounts of power that constant elevation pump generating stations cannot achieve ("constant elevation" in the sense that the starting elevation of pumped water is the same elevation of the water after it drops through the pump-generators). The "pumped once, dropped twice" situation at Niagara Falls is unique to large natural waterfalls that have been converted to hydroelectric operation (anyone please chime in with a list of such sites - it should be just a small subset of the list at [[List_of_pumped-storage_hydroelectric_power_stations]] |
||
* the combination of varying the amount of water diverted from the Falls and storing and releasing water in the upper reservoir provides the balance to produce the maximum amount of energy from the amount of water diversion allowed by treaty and maintain a valuable tourism industry centered around the Falls. |
* the combination of varying the amount of water diverted from the Falls and storing and releasing water in the upper reservoir provides the balance to produce the maximum amount of energy from the amount of water diversion allowed by treaty and maintain a valuable tourism industry centered around the Falls. |
||
Line 51: | Line 51: | ||
In summary, perhaps the most unique aspects of the Niagara Falls hydroelectric operations, besides its immense scale and being the among the earliest of its kind, are how it was designed to manage tourism and energy needs and how it has a "second drop" for pumped water that many pump-generator facilities do not have. Hopefully all of that helps explain aspects of uniqueness that the current article does not address very well. |
In summary, perhaps the most unique aspects of the Niagara Falls hydroelectric operations, besides its immense scale and being the among the earliest of its kind, are how it was designed to manage tourism and energy needs and how it has a "second drop" for pumped water that many pump-generator facilities do not have. Hopefully all of that helps explain aspects of uniqueness that the current article does not address very well. |
||
The treaty as it evolved is described and summarized fairly well at the following link and should be included in the article http://www.niagarafrontier.com/riverdiversion.html. The actual 1950 treaty is provided word-for-word here http://www.lexum.com/ca_us/en/cts.1950.03.en.html All existing agreements related to the Niagara River, Niagara Falls and its power generation and water quality are administered under the umbrella organization for all water agreements between the U.S. and Canada, the International Joint Commission (IJC) whose website has a great deal of information http://www.ijc.org/en/home/main_accueil.htm Under the umbrella of the IJC, the International Niagara Board of Control specifically manages the Niagara Falls aspects of all agreements http://www.ijc.org/conseil_board/niagara/en/niagara_mandate_mandat.htm |
The treaty as it evolved to deal with economic and power needs is described and summarized fairly well at the following link and should be included in the article http://www.niagarafrontier.com/riverdiversion.html. The actual 1950 treaty is provided word-for-word here http://www.lexum.com/ca_us/en/cts.1950.03.en.html All existing agreements related to the Niagara River, Niagara Falls and its power generation and water quality are administered under the umbrella organization for all water agreements between the U.S. and Canada, the International Joint Commission (IJC) whose website has a great deal of information http://www.ijc.org/en/home/main_accueil.htm Under the umbrella of the IJC, the International Niagara Board of Control specifically manages the Niagara Falls aspects of all agreements http://www.ijc.org/conseil_board/niagara/en/niagara_mandate_mandat.htm |
||
Other points: the power generation capacity of the Lewiston Pump-Generating Plant is variously described as 240MW (which is what the article currently states, or 300MW at http://www.niagarafrontier.com/power.html. |
Other points: the power generation capacity of the Lewiston Pump-Generating Plant is variously described as 240MW (which is what the article currently states and not clearly sourced), or 300MW at http://www.niagarafrontier.com/power.html. Additionally, the current article mentions a total combined capacity of 2525 MW, yet a source already listed in the article http://www.wnypapers.com/news/article/current/2010/07/03/100238/nypa-to-upgrade-lewiston-pump-generating-plant states total capacity of 2411MW. To clarify I think we need to acknowledge that various projects have upgraded the power capacity of both the Robert Moses and Lewiston plants several times over the years, so I think a summary table would very very insightful. The table I propose would show the power capacities as they evolved with improvement projects over the years, and are planned for the future. I would appreciate help if someone could draft such a table and include it here. |
||
I tried to find a map that clearly shows the tunnels, plants and reservoirs, but surprisingly could not find one. <span style="font-size: smaller;" class="autosigned">— Preceding [[Wikipedia:Signatures|unsigned]] comment added by [[Special:Contributions/96.11.85.188|96.11.85.188]] ([[User talk:96.11.85.188|talk]]) 05:10, 8 September 2012 (UTC)</span><!-- Template:Unsigned IP --> <!--Autosigned by SineBot--> |
I tried to find a map that clearly shows the tunnels, plants and reservoirs, but surprisingly could not find one. <span style="font-size: smaller;" class="autosigned">— Preceding [[Wikipedia:Signatures|unsigned]] comment added by [[Special:Contributions/96.11.85.188|96.11.85.188]] ([[User talk:96.11.85.188|talk]]) 05:10, 8 September 2012 (UTC)</span><!-- Template:Unsigned IP --> <!--Autosigned by SineBot--> |
This is the talk page for discussing improvements to the Robert Moses Niagara Power Plant article. This is not a forum for general discussion of the article's subject. |
Article policies |
Find sources: Google (books · news · scholar · free images · WP refs) · FENS · JSTOR · TWL |
![]() | This article has not yet been rated on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | ||||||||||||||||||||
|
There are references to two court cases, the United States Supreme Court case allowing the Indian territory to be taken for construction, and a law suit regarding the chemical contamination which was subsequently settled. There are citations for both, but in each instance the case name should be listed and a citation to the official reporter should be provided. —Preceding unsigned comment added by 75.99.27.34 (talk) 15:28, 19 May 2010 (UTC)[reply]
I am not sure if this article qualifies to have the "Dams in New York" category. It is a power station fed by a man-made constructed reservoir. I am sure there are dams involved but the vast majority of the article and facility is based around the power station. The Sir Adam Beck Hydroelectric Power Stations are a similar facility and not label or categorized as a dam. I wish to remove the category and adjust the intro wording.--NortyNort (talk) 19:57, 15 June 2010 (UTC)[reply]
I took a photo of the plant when I was there today, and put it up on Flickr: [1] It's licensed CC so if anyone wants to add it here go ahead. —Preceding unsigned comment added by 98.100.71.138 (talk) 02:06, 27 September 2010 (UTC)[reply]
Hmm... yes, that's a problem. —Preceding unsigned comment added by 98.100.71.138 (talk) 14:53, 27 September 2010 (UTC)[reply]
Didn't there used to be a railroad bridge next to the dam on the reservoir side? Note the railroad tracks just south of the university, you can see where they went through where the campus is. On the north side of the reservoir you can see the 'road' continue with several short tunnels under roadways. Does anyone know more about this? The article doesn't mention a railroad bridge, but it would have probably pre-dated the dam and been very high off the water, right? --76.115.67.114 (talk) 04:56, 19 February 2012 (UTC)[reply]
The current text was written by someone who does not fully understand this hydroelectric facility. I encourage someone to write prose that uses the following:
All water that flows through the tunnels only passes through the Robert Moses Niagara Power Plant turbines once. Some of the tunneled water also passes twice through the pump-turbines of the Lewiston Pump-Generating Plant (once to pump up the water into the upper reservoir, and again when the upper reservoir releases water to drop through the pump-turbines and into the forebay). Virtually all of the water that drops through the Lewiston Pump-Generating Plant pump-turbines was previously pumped up through the pump-turbines. The only water that drops through the pump-turbines that was not previously pumped up into the upper reservoir is the rainwater that collects into the upper reservoir and does not evaporate before use (an amount I don't know), which may or may not offset the amount of pumped water that evaporates in the upper reservoir (another amount I don't know). I believe these slight losses and offsets can be credibly mentioned as slight without quantification or any reference link, since that's what is done for the same losses in the general pump-storage wiki article (if these amounts were significant, we'd be able to find a bunch of engineering articles dealing with them). Anyone who sees the need to "get cute" and describe how any water is "used twice" needs to be very clear on these aspects to ensure the cuteness does not introduce inaccuracies as in the current article text, or miss the point of uniqueness at Niagara Falls. Assuming for the moment that "used twice" makes sense, its use in the current article makes it seem like the pump-generator system is similar to other pump-generator installations, and that is very inaccurate. I think it is more insightful to point out that the water that is pumped up into the upper reservoir is "pumped once and dropped twice" to an elevation far below its starting elevation in the forebay, thus generating immense amounts of power that constant elevation pump generating stations cannot achieve ("constant elevation" in the sense that the starting elevation of pumped water is the same elevation of the water after it drops through the pump-generators). The "pumped once, dropped twice" situation at Niagara Falls is unique to large natural waterfalls that have been converted to hydroelectric operation (anyone please chime in with a list of such sites - it should be just a small subset of the list at List_of_pumped-storage_hydroelectric_power_stations
Greater clarity on the economic impact of the operation is also needed. While it takes slightly more energy to pump water up into the upper reservoir than is recovered when that water drops through the pump-turbines into the forebay, this loss is overwhelmed by the significant amount of power that is gained when the water from the upper reservoir then flows into the forebay and drops through the turbines of the Robert Moses Niagara Power Plant. Because of the treaty limitations on water diversion throughout a day, without the upper reservoir and Lewiston Pump-Generating Plant, the water that now flows from the upper reservoir and into the forebay and then into the Robert Moses Niagara Power Plant would have naturally gone over the Falls without passing through any power plant. Put another way, if there were no treaty regulating water diversion, then water could be diverted as needed for power uses and the significant tourism industry would suffer, and if there was a treaty but no upper reservoir or pump-generator plant, the economic loss from the lower power generation of water limits would be very significant. This tradeoff of managing energy economics and tourism economics is either extremely rare of unique among hydroelectric operations. Most operations with pump-generator capabilities are trying to take advantage of the differences in energy rates that occur throughout a day - pump water up when demand and rates are low, release this water when rates and demand are high (the profits from this offsets the slight energy loss of pumping up and then releasing to the same elevation). While the rate and demand aspect is also a factor at Niagara Falls that adds to the overall benefit how it operates, it is relatively minor compared to the tourism aspect. In other words, even if power rates and demand were the same throughout a day, the current way of operating would still be used. If rates and demand were constant in other pump-generator operating situations, then those operations that are of constant elevation (original and final elevation of pumped water the same)would not be profitable to the point that they would likely not be used.
In summary, perhaps the most unique aspects of the Niagara Falls hydroelectric operations, besides its immense scale and being the among the earliest of its kind, are how it was designed to manage tourism and energy needs and how it has a "second drop" for pumped water that many pump-generator facilities do not have. Hopefully all of that helps explain aspects of uniqueness that the current article does not address very well.
The treaty as it evolved to deal with economic and power needs is described and summarized fairly well at the following link and should be included in the article http://www.niagarafrontier.com/riverdiversion.html. The actual 1950 treaty is provided word-for-word here http://www.lexum.com/ca_us/en/cts.1950.03.en.html All existing agreements related to the Niagara River, Niagara Falls and its power generation and water quality are administered under the umbrella organization for all water agreements between the U.S. and Canada, the International Joint Commission (IJC) whose website has a great deal of information http://www.ijc.org/en/home/main_accueil.htm Under the umbrella of the IJC, the International Niagara Board of Control specifically manages the Niagara Falls aspects of all agreements http://www.ijc.org/conseil_board/niagara/en/niagara_mandate_mandat.htm
Other points: the power generation capacity of the Lewiston Pump-Generating Plant is variously described as 240MW (which is what the article currently states and not clearly sourced), or 300MW at http://www.niagarafrontier.com/power.html. Additionally, the current article mentions a total combined capacity of 2525 MW, yet a source already listed in the article http://www.wnypapers.com/news/article/current/2010/07/03/100238/nypa-to-upgrade-lewiston-pump-generating-plant states total capacity of 2411MW. To clarify I think we need to acknowledge that various projects have upgraded the power capacity of both the Robert Moses and Lewiston plants several times over the years, so I think a summary table would very very insightful. The table I propose would show the power capacities as they evolved with improvement projects over the years, and are planned for the future. I would appreciate help if someone could draft such a table and include it here.
I tried to find a map that clearly shows the tunnels, plants and reservoirs, but surprisingly could not find one. — Preceding unsigned comment added by 96.11.85.188 (talk) 05:10, 8 September 2012 (UTC)[reply]