Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Petition  





2 Question  





3 Campaign  



3.1  Campaign finance  







4 Results  



4.1  Reaction  







5 Aftermath  





6 References  





7 External links  














2013 Regina wastewater plant financing referendum







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 

(Redirected from 2013 Regina wastewater plant referendum)

Regina wastewater treatment plant

A city-wide referendum on a new waste water treatment facility was held in Regina, Saskatchewan on September 25, 2013. The issue of the referendum was whether the facility would be financed through a Public-private partnership (P3) or through the design-bid-build (DBB) approach. The result was 57% against the DBB approach, and the treatment plant ended up being financed by a P3.

Petition[edit]

The campaign to call this referendum started in response of a vote by the city council to finance the new $224-million Wastewater plant through a P3. A group called Regina Water Watch was created in opposition to this move, and started collecting signatures to force a referendum on the issue. According to the Saskatchewan Cities Act, a referendum must be held if 10% of the municipality's population sign a petition to hold it. By the end of June 2013, the group had amassed 24,000 signatures, above the 19,310 required by law.[1] However, the city clerk's report judged the petition was insufficient to force the referendum after ruling that over 4000 of the signatures were invalid. The city council decided to vote for the referendum to be held anyway.[2]

Question[edit]

The Referendum question was the following:

"Be it resolved that the council of the City of Regina publicly finance, operate and maintain the new wastewater treatment plant for Regina through a traditional Design, Bid, Build (DBB) approach."

The question used the same wording that the original petition had proposed.[2]

Campaign[edit]

The "Yes" side was led by Regina Water Watch, group which self-described as "a citizens’ coalition who are concerned about the privatization of Regina's water and wastewater system". Their coalition "includes community activists, the Council of Canadians Regina Chapter, CUPE 21, Making Peace Vigil and Clean Green Regina".[3] The campaign was also supported by the national Canadian Union of Public Employees (CUPE), which helped organize the group's first meeting.[4] The leader of the campaign was Jim Holmes.[2]

The "No" campaign was run by the City of Regina, and its main leader was Mayor Michael Fougere. The campaign was also supported by the Regina Chamber of Commerce.[5] Federal finance minister Jim Flaherty expressed support for the goal of the campaign in an op-ed entitled "Why I’m giving Regina $58.5 million", in reference to his government's promise of funding part of the costs of the plant if the P3 option was selected.[6]

A debate on the referendum issue was held between Fougere and Holmes on September 18, 2013.[7]

Campaign finance[edit]

The City of Regina spent a total of $408,594.96 towards the "No" campaign.[8] Other campaigns and third party groups were not required by law to reveal their campaign expenditures.

The Canadian Union of Public Employees gave significant funds to Regina Water Watch, including registering their domain name reginawaterwatch.com,[5] and paying for the report "Flushing money away: Why the Privatization of Wastewater Treatment Plant is a bad idea", which estimates that a P3 funding scheme would cost the city $61 million more than a DBB.[9] The Regina Chamber of Commerce also participated in the campaign by paying for numerous newspaper and TV ads advocating for the "No side".[5]

During the campaign period, neither CUPE nor the Regina Chamber of Commerce disclosed how much they were spending on the campaign.[5] After the campaign was over, it was revealed that CUPE had spent $180,000 on the "Yes" campaign while the Chamber had spent between $125,000 and $130,000 on the "No" campaign.[10]

Results[edit]

2013 Regina Referendum on Wastewater Plant Results[11]
Answer Votes Percentage
Yes 21,025 42.88%
No 27,988 57.08%
Invalid 20 0,04%
Total 49,033 100%

Reaction[edit]

On the night the Results were posted, Regina Mayor Michael Fougere said ""I'll just say that the people have spoken and the people are always right. I'm very proud of the campaign we ran. I'm proud that people came out in large numbers to express their opinion on a very important issue for our city. I'm very proud of the results."[12]

Jim Holmes reacted to the results by saying "I think we were more optimistic than that going into it. We were up against very tough competition. We were outspent and vilified and everything else."[12]

Aftermath[edit]

Sign at the entrance of the Regina Wastewater Treatment Plant

A P3 model funded the construction of the city's new wastewater treatment plant. In 2015, the Edmonton-based company Epcor was selected to design, build and operate the facility.[13]

By 2016, the facility was nearly built, at a lower than forecasted cost,[14] and it was deemed fully operational by 2018.[15]

References[edit]

  1. ^ "Le collectif Regina Water Watch dépose sa pétition à l'hôtel de ville de Regina". ICI.Radio-Canada.ca (in Canadian French). June 20, 2013. Retrieved April 3, 2020.
  • ^ a b c "Regina to hold referendum on sewage treatment plant". CBC news. July 22, 2013.
  • ^ "About us". Regina Water Watch. Archived from the original on July 31, 2013.
  • ^ "L'indépendance de Regina Water Watch mise en doute". ICI.Radio-Canada.ca (in Canadian French). July 24, 2013. Retrieved April 4, 2020.
  • ^ a b c d "Union, Chamber mum on Regina referendum spending details". CBC News. September 24, 2013.
  • ^ Flaherty, Jim (August 16, 2013). "Why I'm giving Regina $58.5 million". The Leader-Post. Archived from the original on August 31, 2013.
  • ^ "Few fireworks in waste water treatment plant debate". Global News. Retrieved April 4, 2020.
  • ^ "Expenditures" (PDF). Regina.ca.
  • ^ Mackenzie, Hugh (May 6, 2013). "Flushing money away: Why the Privatization of Wastewater Treatment Plant is a bad idea" (PDF). cupe.ca.
  • ^ "Campaign costs revealed in Regina referendum". CBC News. September 27, 2013. Retrieved September 1, 2020.
  • ^ "Wastewater Treatment Plant Referendum September 25, 2013: Official Summary of Results and % Turnout by poll" (PDF). Regina.ca. September 25, 2013.
  • ^ a b "Referendum results in: P3 model to fund Regina sewage plant". CBC News. September 25, 2013.
  • ^ "Epcor to operate Regina's wastewater system". The Council of Canadians. May 30, 2014. Retrieved April 4, 2020.
  • ^ "Cost of Regina wastewater plant comes in $6M less than expected". December 20, 2016.
  • ^ Schick, Lisa. "Construction troubles plagued Regina's wastewater treatment plant". 980 CJME. Retrieved November 12, 2023.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=2013_Regina_wastewater_plant_financing_referendum&oldid=1186486672"

    Categories: 
    Referendums in Saskatchewan
    2013 elections in Canada
    2013 in Saskatchewan
    September 2013 events in Canada
    Hidden categories: 
    CS1 Canadian French-language sources (fr-ca)
    Use mdy dates from September 2023
     



    This page was last edited on 23 November 2023, at 13:25 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki