1 Benmore Power Station  





2 Otematata  





3 Key statistics  





4 Transmission  





5 See also  





6 References  





7 Further reading  





8 External links  














Benmore Dam






Cebuano
Deutsch
فارسی
Français
Norsk bokmål
Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 44°3350.92S 170°1149.92E / 44.5641444°S 170.1972000°E / -44.5641444; 170.1972000
 

From Wikipedia, the free encyclopedia
 

(Redirected from Benmore Power Station)

Benmore Dam
Benmore Dam is located in New Zealand
Benmore Dam

Location of Benmore Dam in New Zealand

LocationCanterbury Region, New Zealand
Coordinates44°33′50.92″S 170°11′49.92″E / 44.5641444°S 170.1972000°E / -44.5641444; 170.1972000
Construction cost$62 million
Dam and spillways
Type of damEarth-filled dam
ImpoundsWaitaki River
Height110 m (360 ft)
Length823 m (2,700 ft)
Width (crest)10.6 m (35 ft)
Width (base)490 m (1,610 ft)
Dam volume28 million tonnes
Spillway capacity3,400 km3 (820 cu mi)
Reservoir
CreatesLake Benmore
Total capacity1.25 km3 (1,010,000 acre⋅ft)
Surface area75 km2 (29 sq mi)
Maximum water depth102 m (335 ft)
Power Station
Operator(s)Meridian Energy
Commission date1965
Hydraulic head92 m (302 ft)
Turbines6 x 90 MW (120,000 hp)
Installed capacity540 MW (720,000 hp)
Annual generation2,215 GWh (7,970 TJ)

Benmore Dam is the largest dam within the Waitaki power scheme, located in the Canterbury Region of New Zealand's South Island. There are eight other power stations in the Waitaki Power Scheme.

The dam is the largest earth-fill (zoned embankment dam) water-retaining structure in New Zealand. Its core is low permeability clay material, supported by two massive shoulders of river gravel. Lake Benmore has a volume of 1.25 billion cubic metres, about 1.5 times as much water as Wellington Harbour. The dam's spillway can cope with over 6,000 cubic metres of water per second, about 20 times the mean river flow.

Dam of Benmore hydropower station
Lake below Benmore hydropower station

Benmore Power Station[edit]

With a generating capacity of 540 megawatts (720,000 hp), Benmore Power Station is the second largest [1] hydro station in New Zealand behind Manapouri, and the largest dam in the country.

Construction of the dam and hydroelectric station began in 1958 at a cost of $62 million. It was commissioned in 1965, and was officially opened by Prime Minister Sir Keith Holyoake on 15 May that year.[2] It was built for the New Zealand Electricity Department; since 1999 it has been owned and operated by Meridian Energy.[2]

From 2008 to 2010 the six turbines were refurbished at a cost of $67 million. This enabled a 6% reduction in water use for the same generation capacity, increasing annual generation by 70 GWh (250 TJ). New switchboards and an upgrade to the switchyard were also undertaken.[2]

Benmore is the South Island terminus of the HVDC Inter-Island link between the North and South Islands of New Zealand. The HVDC converter stations are on the west side of the tailrace, and convert 220 kV AC power to ±350 kV DC for the 610 km (380 mi) journey to the North Island converter station at the HaywardsinLower Hutt.

Otematata[edit]

Otematata is the small town that was created to support workers who constructed the dam, and their families. The town was constructed by the Ministry of Works, which residents called "Uncle Mow" or "Big Mow" as it provides every feature, including social activities and clubs, and expelled criminals from the town. After the dam was constructed, much of the village was dismantled. Many of the houses, which had been trucked in from Roxburgh, were trucked away again and moved to the next site in Twizel.[3]

Today Otematata supports the dam, although with advances in technology the staffing needed to maintain the dam is drastically smaller. Due to this the town is now a small holiday community, with only around 200 permanent residents. The dam is about 8 kilometres (5.0 mi) up the valley from the township.

Key statistics[edit]

Benmore Dam from the south lookout, near the spillway

Transmission[edit]

Benmore is a major switching point in the New Zealand national grid and one of two major switching stations in the Waitaki Valley (the other being Twizel sub-station). The importance is largely due to the location at Benmore of the southern terminal station of the HVDC Inter-Island link.

The main AC switching station is on the east bank of the tailrace, and electricity generated at Benmore Power Station is injected into the national grid here. Three major 220 kV lines containing five circuits run from the Benmore substation. Clockwise from south, they are:[4]

The HVDC converter stations are located on the west side of the tailrace, connected to the AC switching station by lines over the tailrace. The -350 kV thyristor Pole 2 has its valve hall on the south side of the site. A new +350 kV thyristor Pole 3 was commissioned in 2013 to replace the ageing Pole 1, and its valve hall is located adjacent to the existing Pole 2 valve hall.

See also[edit]

  • iconWater portal
  • iconRenewable energy portal
  • References[edit]

    1. ^ "Benmore dam hydro station".
  • ^ a b c Bruce, David (30 October 2008). "Benmore gets more with first full rebuild". Otago Daily Times. Retrieved 2008-10-30.
  • ^ "Power for the People". RNZ. 2015-05-11. Retrieved 2020-02-09.
  • ^ "Maps and Diagrams". Transpower New Zealand. Archived from the original on 10 June 2017. Retrieved 18 July 2017.
  • Further reading[edit]

    External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Benmore_Dam&oldid=1219523724#Benmore_Power_Station"

    Categories: 
    Dams completed in 1965
    Buildings and structures in Canterbury, New Zealand
    Dams in New Zealand
    Earth-filled dams
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Use New Zealand English from April 2024
    All Wikipedia articles written in New Zealand English
    Articles with short description
    Short description matches Wikidata
    Coordinates on Wikidata
    Commons category link from Wikidata
     



    This page was last edited on 18 April 2024, at 07:45 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki