Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Jewellery Line project  







2 Services  



2.1  Places served  





2.2  Service information  







3 See also  





4 References  





5 Bibliography  





6 External links  














Birmingham to Worcester via Kidderminster line







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 

(Redirected from Birmingham to Worcester via Kidderminster Line)

Birmingham to Worcester via Kidderminster line
Overview
StatusOperational
OwnerNetwork Rail
LocaleWorcestershire
West Midlands
West Midlands (region)
Termini
  • Birmingham Snow Hill
  • Worcester
  • Stations16
    Service
    TypeSuburban rail, Heavy rail
    SystemNational Rail
    Operator(s)West Midlands Trains
    Chiltern Railways
    CrossCountry
    Great Western Railway
    Rolling stockClass 168 Clubman
    Class 170 Turbostar
    Class 172 Turbostar
    Class 196 Civity
    Class 220 Voyager
    Class 221 Super Voyager
    Class 800 Intercity Express Train
    History
    Opened1867
    Technical
    Track gauge1,435 mm (4 ft 8+12 in) standard gauge

    Route map


    (Click to expand)

    The Birmingham to Worcester via Kidderminster line is a railway line which runs from Birmingham Snow HilltoWorcester via Stourbridge and Kidderminster in the West Midlands, England. It is one of the Snow Hill Lines, with trains operated by West Midlands Trains and Chiltern Railways using a variety of rolling stock including Class 172 and Class 168 diesel units. It is a future aspiration of Network Rail to electrify the entire line, as well as the Chiltern Main LinetoLondon Marylebone.[1]

    The line is one of two railway routes between Birmingham and Worcester, the other route runs via Bromsgrove.

    History[edit]

    The line was used mostly by GWR trains from Snow Hill, but some London and North Western Railway and Midland Railway trains from Birmingham New Street to Worcester and Hereford via Galton Junction also used the line, until 1917, when all trains on the line ran into Snow Hill.[5]

    In the late 1960s, services to Snow Hill were run down. In 1967 most services on the line were diverted to Birmingham New Street. However a skeleton service of four trains per day, was retained between Snow Hill and Langley Green until March 1972, when Snow Hill station, along with the line to Smethwick West was closed to passengers. A single line as far as Handsworth was kept open for freight traffic (cement & scrap metals).[3][6][7]

    Jewellery Line project[edit]

    Plaque at Snow Hill station, commemorating the opening of the Jewellery Line in 1995.

    Snow Hill station was reopened to services from the south in October 1987. In 1993, as part of the project to restore services through Snow Hill, work began on reopening the 4 miles (6 km) of line between Smethwick and Snow Hill as the "Jewellery Line"; the line was reopened on 24 September 1995.[8]

    Three new stations were opened on the restored route: Smethwick Galton Bridge, The Hawthorns and Jewellery Quarter. Smethwick Galton Bridge station was built as a two-level interchange with trains on the Birmingham New Street-Wolverhampton Line, and it replaced the nearby Smethwick West station which closed soon after.[9][10]

    The reopening cost £28.5 million in 1995 prices, with the majority of the funding coming from Centro.[8] It allowed cross-city rail services to operate through Snow Hill, and freed up much needed capacity at New Street station. According to Centro, it created "a third cross city line linking the lines to Worcester and Hereford with those to Stratford-upon-Avon and Leamington Spa".[6][11]

    Services[edit]

    Places served[edit]

    The line serves the following places:

    Service information[edit]

    Passenger services are provided by West Midlands Trains between Birmingham and Worcester and beyond, and by Chiltern Railways between Birmingham and Kidderminster only.

    The local service provided by West Midlands Trains comprises:[12]

    Map of Birmingham to Worcester rail routes

    All local services continue beyond Birmingham to either Dorridge, Whitlocks EndorStratford-upon-Avon, with some peak hour trains running to Leamington Spa. A triangular junction at Worcester allows a variety of service patterns (see map). Some trains terminate at Shrub Hill, whereas some reverse there before going to Foregate Street. Other trains take the direct curve to Foregate Street avoiding Shrub Hill. Some trains continue beyond Foregate Street to Malvern Link and Great Malvern.

    Chiltern Railways run services to London Marylebone in the morning rush hour, which start from Stourbridge Junction rather than Moor Street, and reverse journeys during the evening.[13]

    Before the reopening of Snow Hill, trains along this route ran into Birmingham New Street, where they terminated. Even after the Snow Hill reopening a lower level of service to New Street was maintained, but this link was axed altogether at the May 2004 timetable change, to much local consternation.[14] Passengers for New Street must now either walk between Moor Street and New Street stations, use the Midland Metro between Snow Hill and New Street, or change at Smethwick Galton Bridge. This did however add much needed extra capacity to the Stour Valley Line into Birmingham New Street and free up platform space there. This service took the connection between Galton and Smethwick Junctions near Smethwick West. Services were once hourly from Worcester to Birmingham New Street via Stourbridge.[6]

    Two CrossCountry services are timetabled to use the line each day — one service from Birmingham New Street (via Smethwick Junction and Galton Junction) in the early morning and a pair of reverse services in the evening. None of these call at any of the stations along the line and are scheduled to ensure drivers retain knowledge of the route. During congestion or mainly during engineering works, the line sees much more frequent service as a diversionary route. The line from Worcester Shrub Hill continues to Cheltenham Spa railway station, which is the next calling point for most CrossCountry services, and thus offers a convenient alternative when the Lickey Incline is closed.

    Several charter trains can often be seen on the line due to the existence of the Severn Valley Railway which has a mainline connection at Kidderminster.

    See also[edit]

    References[edit]

  • ^ a b c Boynton 1997, pp. 22–23.
  • ^ "Stourbridge Railway". John Speller's Web Pages. Retrieved 29 June 2013.
  • ^ Boynton 1997, pp. 25–26.
  • ^ a b c "Historic timetables". Stourbridge Line User's Group. Retrieved 29 June 2013.
  • ^ Boynton, John (2001). Main Line to Metro: Train and tram on the Great Western route: Birmingham Snow Hill – Wolverhampton. Kidderminster: Mid England Books. ISBN 978-0-9522248-9-1.
  • ^ a b Boynton 1997, pp. 82–86.
  • ^ "Smethwick Galton Bridge Station 1995 - Present". Rail Around Birmingham and the West Midlands. Retrieved 4 September 2015.
  • ^ "Jewellery Line Reopening". Stourbridge Line User Group. Retrieved 7 September 2015.
  • ^ "Jewellery Quarter Station 1995 - Present". Rail Around Birmingham and the West Midlands. Retrieved 28 October 2013.
  • ^ "Snow Hill Lines | Timetable from Sunday 10 December 2023 until Saturday 1 June 2024".
  • ^ "Timetable - 10 December 2023 - 1 June 2024: London to High Wycombe, Bicester, Oxford, Banbury, Leamington Spa, Stratford-upon-Avon and Birmingham". Chiltern Railways.
  • ^ "Passenger Train Services over Unusual Lines, Summer 2004 - West Midlands" Archived 2016-03-04 at the Wayback MachinePassenger Train Services over Unusual Lines; Retrieved 7 April 2016
  • Bibliography[edit]

    External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Birmingham_to_Worcester_via_Kidderminster_line&oldid=1193833548"

    Categories: 
    Railway lines in the West Midlands (region)
    Rail transport in Worcestershire
    Rail transport in the West Midlands (county)
    Transport in Worcester, England
    Hidden categories: 
    Webarchive template wayback links
    Use dmy dates from April 2022
    Commons category link is on Wikidata
     



    This page was last edited on 5 January 2024, at 22:11 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki