Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Stations  





2 What remains  





3 References  





4 Further reading  














Cambridge and St Ives branch line







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 

(Redirected from Cambridge and Huntingdon railway)

  • t
  • e
  • Cambridge and
    St Ives branch line

    St Ives

    Swavesey

    Long Stanton

    Oakington

    Histon

    Chesterton

    Cambridge

    The Cambridge and St Ives branch (as it is named on New Popular Editions Ordnance Survey maps) was a railway built by the Wisbech, St Ives & Cambridge Junction Railway in the late 1840s. The railway ran from Cambridge in the south, through Fenland countryside to the market town of St Ives; more specifically, the line ran from Chesterton Junction, where it met the present-day Fen line north of the River Cam.

    Passenger services along the line managed to survive the Beeching Axe, but with British Rail citing heavy losses the final passenger service ran between St Ives and Cambridge on 5 October 1970. Despite campaigns to reopen the service during the 1970s, the only subsequent rail traffic on the line was a freight service to ChiversinHiston which ran until 1983 and a contract to ferry sand from ARC at Fen Drayton which continued until May 1992.[1]

    The railway now forms the alignment of the northern section of the Cambridgeshire Guided Busway: a bus rapid transit scheme.

    Stations[edit]

    Stations listed northwest to south, in the 'up' direction

    What remains[edit]

    On its 2011 opening, the Cambridgeshire Guided Busway route absorbed the majority of the old railway between St Ives and the point at which the bus joined public roads at Milton Road. The remaining section between the former level crossing over Milton Road and the Fen line was converted to an extension to the Guided Busway in 2015 to join it to the planned Cambridge North railway station.

    References[edit]

    1. ^ "Cambridge-St Ives-March". East Anglian Railway Archive.
  • ^ Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. p. 60. ISBN 1-85260-508-1. R508.
  • ^ Dewick, Tony (2002). Complete Atlas of Railway Station Names. Ian Allan. ISBN 0-7110-2798-6.
  • Further reading[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Cambridge_and_St_Ives_branch_line&oldid=1082188863"

    Categories: 
    Closed railway lines in the East of England
    Rail transport in Cambridgeshire
    Rail transport in Cambridge
    Hidden category: 
    Use dmy dates from April 2022
     



    This page was last edited on 11 April 2022, at 20:26 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki