Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Iron ore mining  



1.1  EBX foundry  





1.2  Jindal Steel  







2 See also  





3 References  





4 External links  














El Mutún






العربية
Deutsch
Español
Français
Ladin
Nederlands
Русский
Simple English
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 19°1125S 57°5302W / 19.19028°S 57.88389°W / -19.19028; -57.88389
 

From Wikipedia, the free encyclopedia
 

(Redirected from El Mutun)

El Cerro Mutún (Spanish for "the Mountain Mutún") is an iron ore deposit.[1] Located in the Germán Busch Province in the Santa Cruz DepartmentofBolivia, near Puerto Suárez, it extends across the border into Brazil, where it is called the Serrania de Jacadigo. Also known as the "Serrania Mutún", it has an area of about 75 square kilometers. Its estimated reserves are about 40.205 billion (40.205 × 109) tons of iron ore[2] of 50% iron, mainly in hematite and magnetite form, and in lesser quantities in siderite and manganese minerals. This can be compared with an estimate of the total world reserves of iron ore: 800 billion tons of crude ore containing more than 230 billion tons of iron.[3]

Iron ore mining

[edit]

A series of attempts have been made to commercially extract the iron ore on the site, including by the Brazilian firm EBX and the Indian company Jindal Steel. Following the Jindal's 2012 exit from the country, the Mutún Steel Company (Spanish: Empresa Siderúrgica del Mutún)—the state-owned partner in the previous ventures—continues to plan for operations.

EBX foundry

[edit]

In early 2000s, Brazilian company EBX devised a project to create a foundry in El Mutún. However, the project was blocked by Bolivian president Evo Morales because of environmental concerns; instead of using natural gas available from a pipeline 20 km away, vegetable carbon was to be used for the foundry, demanding 45 hectares a day of Amazonian wood.[4] Despite this, EBX started working anyway before obtaining its licence, under the name of MXX. The Bolivian Ministry of Defence declared that "various irregularities and constitutional violations" had been observed. On April 19, 2006, the Bolivian army freed three government ministers who had been taken hostage by villagers demanding the immediate opening of all EBX's installations.[5] By 2007, the Bolivian government had expelled EBX from the Mutun region.[6]

Jindal Steel

[edit]

In 2007, India's third largest steel manufacturer, Jindal Steel and Power Limited, signed a contract with the Bolivian government to exploit the El Mutún iron ore deposit. According to the contract, Jindal would invest US$1.5 billion initially and an additional US$2.5 billion over the next eight years. This is the single largest investment by an Indian firm in Latin America.[7] By September 2011, Jindal had obtained clearance for the project from the EIA and had hired an engineering consultant for FEED work.[8] The project is expected to create 6,000 jobs directly and another 15,000 indirectly.[9]

Jindal Steel planned to set up an integrated 1.7 MTPA steel plant, a 6 MTPA sponge iron plant, a 10 MTPA iron ore pellet plant and a 450 MW power plant.[8] The project was expected to generate US$200 million in revenues for the Bolivian government, equivalent to 5% of its current revenue.[6] The government projected that the Jindal complex would generate more than 21,000 jobs.[6] As of 2009, Jindal had only invested US$20 million on the Mutun project due to difficulty in securing natural gas supplies from the Bolivian government for the 450MW power plant and ore smelting process. With progress on the project stalled, the Bolivian government and Jindal steel traded both accusations and demands. The government had opened criminal investigations against Jindal's executives and demanded that the full promised investment be deposited in Bolivian banks, while the company demanded these charges be dropped in exchange for a $18 million investment. Jindal announced its decision to withdraw on July 16, 2012.[10] In August 2012 Jindal finally exited the El Mutún project.[11] In 2014, international arbitrators awarded Jindal $22.5 million due to Bolivia's earlier seizure of the bond.[12]

An editorial in La Jornada alleged that contrary to contract terms, Jindal was mostly interested in extracting iron ore concentrates and exporting the raw material for further processing at its plants in India.[13]

See also

[edit]

References

[edit]
  1. ^ "Serrania Mutun, Chiquitos Province, Santa Cruz Department, Bolivia". mindat.org. Retrieved 2006-10-20.
  • ^ "Will Evo stick?". Mines and Communities Website. Archived from the original on 2007-08-15. Retrieved 2008-03-29.
  • ^ "Iron Ore" (PDF). U.S. Geological Survey Mineral Resources Program. Retrieved 2006-10-20.
  • ^ (in Spanish) Bolivia: El bocado de『El Mutún』– Bolpress
  • ^ "Libération de trois ministres boliviens pris en otage par des villageois" (in French). Le Monde. 2006-04-19. Retrieved 2006-04-19.
  • ^ a b c Bolivia holds hill of ore
  • ^ "India's Bolivian ore". The Australian. 3 December 2007. Archived from the original on 5 December 2007. Retrieved 3 December 2007.
  • ^ a b "Jindal Steel and Power expects 10–12% growth in Indian steel". IIFL. Archived from the original on May 9, 2013. Retrieved September 25, 2011.
  • ^ "AFP: Bolivia OKs Indian firm to mine vast iron deposit". Archived from the original on 2007-12-08. Retrieved 2007-12-03.
  • ^ Chipana, Willy; Iván Condori (2012-07-17). "Jindal deja el país tras no aceptar cuatro condiciones del Gobierno". La Razón. Retrieved 2013-04-01.
  • ^ "Jornada | Editorial". www.jornadanet.com. Archived from the original on 2012-03-30.
  • ^ Dube, Ryan (26 August 2014). "Bolivia to Appeal Ruling Favoring India's Jindal in el Mutún Dispute". Wall Street Journal.
  • ^ "Jornada | Editorial". www.jornadanet.com. Archived from the original on 2012-03-30.
  • [edit]

    19°11′25S 57°53′02W / 19.19028°S 57.88389°W / -19.19028; -57.88389


    Retrieved from "https://en.wikipedia.org/w/index.php?title=El_Mutún&oldid=1077492195"

    Categories: 
    Iron ore deposits
    Precambrian South America
    Neoproterozoic Bolivia
    Neoproterozoic Brazil
    Geography of Bolivia
    Geography of Santa Cruz Department (Bolivia)
    Geology of Santa Cruz Department (Bolivia)
    Hidden categories: 
    Articles with Spanish-language sources (es)
    CS1 French-language sources (fr)
    Pages using gadget WikiMiniAtlas
    Articles containing Spanish-language text
    Coordinates on Wikidata
     



    This page was last edited on 16 March 2022, at 16:31 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki