Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Energy production  



1.1  TG1: 1984, 2·4 MW (38°3'53"S 176°43'20"E)  





1.2  TG2: 1993, 3·5 MW (38°3'47"S 176°43'12"E)  





1.3  KGL: 2008, 100 MW (38°3'47"S 176°43'34"E)  





1.4  GDL: 2008, 9 MW (38°3'39"S 176°43'20.17"E)  





1.5  TOPP1: 2012, 21 MW (38°3'55"S 176°43'15"E)  





1.6  TAOM: 2018, 24 MW (38°3'50"S 176°42'11"E)  







2 Gallery  





3 See also  





4 References  





5 External links  














Kawerau Power Station






Norsk bokmål
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 38°347S 176°4338E / 38.06306°S 176.72722°E / -38.06306; 176.72722
 

From Wikipedia, the free encyclopedia
 

(Redirected from Kawerau geothermal power station)

Kawerau Power Station
Map
CountryNew Zealand
LocationBay of Plenty Region
Coordinates38°3′47S 176°43′38E / 38.06306°S 176.72722°E / -38.06306; 176.72722
StatusOperational
Commission date2008
Owner(s)Mercury Energy
Power generation
Nameplate capacity100 MW

The Kawerau Power Station is a 100-megawatt geothermal power plant located just outside the town of Kawerau in the Bay of Plenty RegionofNew Zealand. The power station is situated within the Kawerau geothermal field, which is part of the Taupo Volcanic Zone. Completed in July 2008 by Mighty River Power at a cost of NZ$300 million, the plant's capacity proved greater than expected.[1] The station is the largest single-generator geothermal plant in New Zealand.[2]

Energy production[edit]

Kawerau is the world's premiere geothermal field, with multiple installations. Earlier known as the Onepu hydrotherma area, the hot springs had been used for centuries but in the 1950s the New Zealand Government with Fletcher Trust and Investment Limited began the development of the field to supply steam for the new Tasman Pulp and Paper mill. A portion of the steam is used to generate electricity for use within the mill, however, external power stations also have been constructed.

TG1: 1984, 2·4 MW (38°3'53"S 176°43'20"E)[edit]

ORMAT binary cycle. Also known as TOI for Tarawera ORMAT Installation. The first binary cycle plant in NZ. Half-hourly generation data for this station are summed with those for station TG2 in data published by the Electricity authority.

In 2014 decommissioned.

TG2: 1993, 3·5 MW (38°3'47"S 176°43'12"E)[edit]

ORMAT binary cycle. Tasman Generator 2. Half-hourly generation data for this station are summed with those for TG1 in data published by the Electricity authority.

Electricity Generation at Kawerau TG1 + TG2

Being air-cooled, power production sags during the warmer summer time.

In 2020 deconstructed (brown field in a satellite image)

KGL: 2008, 100 MW (38°3'47"S 176°43'34"E)[edit]

The Kawerau geothermal power station boosted the country's geothermal capacity by 25 percent and significantly increased local generation capacity in the Eastern Bay of Plenty.[3] The plant meets approximately one third of residential and industrial demand in the region and provides cost certainty to local industry including Norske Skog Tasman.[4]

The station uses a single Fuji turbine and steam from geothermal bores. The two phase fluid is flashed/separated twice to produce high and low pressure steam to feed the turbine. The initial rating was for 90 MW, but it soon became clear that 100 MW could be sustained, and in 2018 perhaps 110 MW?

Electricity Generation at Kawerau Main.

In June 2021, the main power station suffered a mechanical failure which resulted in an outage that was expected to extend until 31 August 2021.[5] [6] The data (as in the plot) show that the outage started on the seventh of July, and full-power operation resumed in the twentieth of August.

GDL: 2008, 9 MW (38°3'39"S 176°43'20.17"E)[edit]

ORMAT binary cycles, constructed by Geothermal Developments Limited. Various power ratings appear (9, 9·2, 9·4 or even 10 MW) but since September 2009 the power output has been reduced to 7 MW due to the fine pumice coming up with the flow from well KA24, also provoking closedowns to clear the filters. Sold to Eastland in January 2010. No half-hourly generation data for this station are published by the Electricity authority.

TOPP1: 2012, 21 MW (38°3'55"S 176°43'15"E)[edit]

Commissioned by Norske Skog Tasman and called Tasman ORMAT Power Plant 1. Sold to Ngati Tuwharetoa Geothermal Assets (NTGA) in 2016, bought by Eastland in 2021. No half-hourly generation data for this station are published by the Electricity authority.

TAOM: 2018, 24 MW (38°3'50"S 176°42'11"E)[edit]

ORMAT binary cycle plant, called Te Ahi O Maui. This station uses fluid from wells TP-1 and TP-2. The access road branches off Spencer Avenue, which may be mentioned in location descriptions.

Electricity Generation at Kawerau Te Ahi O Maui.

As time goes on, some boreholes falter in production, and new ones are drilled. There is an extensive network of interconnecting pipelines to distribute geothermal fluid, and increasingly, to take exhausted fluid for re-injection on the periphery of the field rather than dumping it into the river. All of this is conducted via complex and changing relationships amongst multiple parties.

Gallery[edit]

See also[edit]

  • iconGeology portal
  • iconRenewable energy portal
  • References[edit]

    1. ^ "Mighty River Power's Kawerau power station now fully operational". Mighty River Power. 2 September 2008. Archived from the original on 14 October 2008. Retrieved 2009-01-04.
  • ^ Bradley, Grant (2 July 2008). "Full steam ahead for new Kawerau plant". The New Zealand Herald. Retrieved 2008-09-10.
  • ^ Carr, Mathew; Evans, Gavin (5 January 2007). "Geothermal power moves ahead as reliable source of renewable energy". International Herald Tribune.
  • ^ "Mighty River Power News" (PDF). Mighty River Power. February 2007. Archived from the original (PDF) on 2007-09-27.
  • ^ Gray, Jamie (9 June 2021). "Dry weather drives Mercury to second earnings downgrade". NZ Herald.
  • ^ "Market Summary for the week ended 13 June 2021" (PDF). Transpower. June 2021.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Kawerau_Power_Station&oldid=1224102150"

    Categories: 
    Geothermal power stations in New Zealand
    Buildings and structures in the Bay of Plenty Region
    Kawerau District
    Whakatane Graben
    Taupō Volcanic Zone
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Use New Zealand English from April 2024
    All Wikipedia articles written in New Zealand English
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 16 May 2024, at 07:46 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki