Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Using milestones in scheduling  





2 See also  





3 References  





4 External links  














Milestone (project management)






Čeština
Deutsch
Eesti
Esperanto
فارسی
Français

Bahasa Indonesia
Italiano
Bahasa Melayu

Norsk bokmål
Polski
Português
Русский
Svenska
ி
Українська
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 

(Redirected from Milestone (Project management))

A milestone, when placed in project management software, is done as a zero-time task and appears with a special notation (black diamond in this case).

Milestones are tools used in project management to mark specific points along a project timeline. These points may signal anchors such as a project start and end date, or a need for external review or input and budget checks. Some contracts for products include a "milestone fee" that may be paid out when certain points are achieved.

In many instances, milestones do not impact project duration. Instead, they focus on major progress points that must be reached to achieve success.[1]

Using milestones in scheduling[edit]

Milestones can add significant value to project scheduling. When combined with a scheduling methodology such as program evaluation and review technique or the critical path method, milestones allow project managers to much more accurately determine whether or not the project is on schedule. By constraining the dates associated with milestones, the critical path can be determined for major schedule intervals in addition to the entire project. Slack/float can also be calculated on each schedule interval. This segmentation of the project schedule into intervals allows earlier indication of schedule problems and a better view into the activities for which completion is critical.

Milestones are like dashboard reviews of a project. A number of activities, which were planned at the beginning of the project with their individual timelines, are reviewed for their status. This process also gives an opportunity to check the health of the project.

Milestones are frequently used to monitor the progress, but limitations to their effectiveness exist. They usually show progress only on the critical path, and ignore noncritical activities. Resources are commonly moved from noncritical activities to critical activities to ensure that milestones are met. This gives the impression that the project is on schedule, when actually some activities are being ignored.

See also[edit]

References[edit]

  1. ^ Verzuh, Eric (2008). The Fast Forward MBA in Project Management (3rd ed.). Hoboken, NJ: John Wiley & Sons, Inc. p. 149. ISBN 9780470247891.

External links[edit]


  • t
  • e

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Milestone_(project_management)&oldid=1200878594"

    Categories: 
    Schedule (project management)
    Business stubs
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
    Articles needing additional references from October 2015
    All articles needing additional references
    Articles needing additional references from September 2022
    Articles with multiple maintenance issues
    All stub articles
     



    This page was last edited on 30 January 2024, at 12:27 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki