1 History  



1.1  Route and construction  







2 Route alignment  





3 Future  





4 Status updates  





5 See also  





6 References  














Dwarka Expressway







ि
Bahasa Indonesia
Nederlands
ி
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 

(Redirected from National Highway 248BB (India))

Dwarka Expressway (NH 248-BB)
Dwarka Expressway

Map

Dwarka Expressway in red
Route information
Length27.6 km (17.1 mi)
Major junctions
FromShiv Murti, Mahipalpur, Delhi
ToKherki Daula Toll Plaza, Gurugram
Location
CountryIndia
StatesDelhi, Haryana
Highway system

NH 248-BB, commonly known as Dwarka Expressway is a 27.6 km (17.1 mi) long, under construction, 8-lane (elevated) and 8-lane (service road),[1] total 16-lane[2] elevated grade separated expressway connecting DwarkainDelhi to Kherki Daula Toll Plaza, GurgaoninHaryana. The expressway takes off from km 20 milestone of NH 48 (old NH 8) at Shiv Murti in Mahipalpur in Delhi and terminate at km 40 of NH 48 near Kherki Daula Toll Plaza in Gurgaon in Haryana.[3] The Dwarka Expressway has been planned as an alternate road link between Delhi and Gurgaon, and is expected to ease the traffic situation on the Delhi–Gurgaon Expressway.[4]

Entire project, costing 7,500 crore was planned in 2006, contract was awarded in 2011. Of the original 18 km project, 14 km were completed by 2016. Several more kilometre project routes was added to the scope of the project as an extension. Various parts of the project remained delayed due to land acquisition and tree transplantation hurdles, resulting in the intervention from the Prime Minister's office in November 2018 to resolve the pending issues. Subsequently, the land for the 10 km section was handed by the Haryana and Delhi, AAI and HSVP were in the process of expediting the resolution in December 2018.[5]

One of the cause of delay was due to NHAI's need for the land from DDA to transplant 13,000 trees from the route alignment, which in November 2018 Delhi's Chief Minister Arvind Kejriwal agreed to provide after several years of inexplicable delays.[5]

In December, Haryana too handed over the land for 10 km route to NHAI and was in process of handing over the remaining land for the 4 km route by 31 December 2018.[6] Earlier in January 2018, AAI too had agreed to sell their land to NHAI for the route falling on their land.[7] Put together all of this takes care of the land needed for the entire route from various parties i.e. AAI, DDA and HSVP.

History[edit]

The Dwarka Expressway was envisaged as an alternate route for connecting Dwarka and Gurgaon in 2006.[8] It would have been 18 km long, signal-free road, with 14 km in Gurgaon and rest in Delhi. A 3.2 km long Central Peripheral Road (CPR) was planned to connect it to Southern Peripheral Road (SPR) at Kherki Daula on NH-48.[9] Land acquisition started in 2007-08.[10] The construction contract was given to JSR Construction Private Ltd and India Bulls Private Ltd in April 2011 and the completion date was set to be 31 March 2012.[11] The Punjab and Haryana High Court disposed of the petitions in May 2015.[10] In June 2016, the project was acquired by National Highways Authority of India and road was renamed National Highway 248-BB.[12] By that time, 14 km stretch of the expressway with six lanes had been completed.[13] The scope of the project was expanded and the proposed Central Peripheral Road (CPR) and 6.3 km long section of Urban Extension Road-II (UER II) were included as part of the expressway.[14] But construction couldn't be started immediately as HUDA was not able to hand over land to NHAI due to the matter of allotment of alternate plots to oustees being heard in Punjab and Haryana High Court.[15] On 28 May 2018, the High Court directed HUDA to allot alternate houses to 72 oustees, holding General Power of Attorney or Special Power of Attorney, within two weeks and thus allowing the authority to demolish remaining houses and hand over the land to NHAI.[16]

Route and construction[edit]

This 29 km long project, 18.9 in Gurugram and 10.1 km in Delhi, is expected to be completed by May 2023.[6] Work on Haryana portion can commence as of Dec 2018. Delhi has provided the land but yet to provide the forests clearance as of December 2018. Route alignment and phases/packages of this expressway being built by NHAI are as follows:

Route alignment[edit]

The route alignment to the west of Gurgaon is as follows:[21][22][23]

Future[edit]

Delhi–Jaipur SuperExpressway (NH-352B), is a greenfield expressway which is under construction of ₹6,530 crore 6-lane 195-km-long from Kherki Daula (from Dwarka Expressway in Gurgaon) to Chandwaji (onNH-48 on northern outskirts of Jaipur) runs parallel to western side of NH48. It cuts down Delhi–Jaipur distance by 40 km and travel time from 3–4 hours (270 km by Delhi–Mumbai Expressway) to 2 hours. It passes through Haryana (Kherki Daula, Farrukhnagar, Pataudi, Taoru, Rewari, north of Bawal, Jhajhar & Nangal Choudhary) and Rajasthan (Behror, Kotputli, Shahpura & Chandwaji).[25] In April 2023, the earthworks had already started and expected completion date is 2025.

Status updates[edit]

See also[edit]

References[edit]

  1. ^ "Nitin Gadkari posted VIDEO of India's first elevated expressway, Engineering Marvelous". 21 August 2023.
  • ^ "Dwarka Expressway with 140 lanes to open by 2023: Union Minister Nitin Gadkari".
  • ^ Behl, Abhishek (4 June 2016). "NHAI inspects Dwarka e-way, Shiv Murti to be the zero point". Hindustan Times. Archived from the original on 4 June 2016. Retrieved 21 October 2017.
  • ^ Kumar, Ajay (3 October 2012). "Delay in work on Northern Peripheral Road adds to commuter's woes on Delhi-Gurgaon expressway". India Today. Archived from the original on 8 March 2017. Retrieved 21 October 2017.
  • ^ a b PM's office may step in to resolve delays in Dwarka Expressway project, Hindustan Times, 20 Nov 2018.
  • ^ a b c d e f g Delhi: IGI to get 2 new approach roads in 3 years, Times of India, April 2018.
  • ^ a b IGI land to highway body for Dwarka Expressway?, Asian Age, Jan 2018.
  • ^ Behl, Abhishek (11 January 2016). "Khattar orders completion of Dwarka e-way by June 2017". Hindustan Times. Archived from the original on 6 July 2017. Retrieved 21 October 2017.
  • ^ Jha, Bagish (30 March 2017). "Now, Huda to hand over CPR project To NHAI". The Times of India. Archived from the original on 2 April 2017. Retrieved 21 October 2017.
  • ^ a b Kumar, Ashok (31 March 2016). "Dwarka Expressway gets a shot in the arm". The Hindu. ISSN 0971-751X. Retrieved 21 October 2017.
  • ^ Kumar, Ajay (23 October 2016). "Troubleshooter for commuters: Haryana government to expand Dwarka Expressway up to 16 lanes". India Today. Archived from the original on 26 February 2017. Retrieved 21 October 2017.
  • ^ Behl, Abishek (1 June 2016). "NHAI gives go-ahead for Dwarka Expressway elevation". Hindustan Times. Archived from the original on 27 November 2016. Retrieved 21 October 2017.
  • ^ Behl, Abishek (22 July 2016). "NHAI speeds up land acquisition for Delhi part of Dwarka expressway". Hindustan Times. Archived from the original on 31 December 2016. Retrieved 21 October 2017.
  • ^ a b Draft Feasibility Report - Package 2 Dwarka Expressway (PDF) (Report). September 2017. Archived from the original (PDF) on 15 December 2017. Retrieved 21 October 2017.
  • ^ Jha, Bagish (15 April 2018). "14 reasons why Dwarka Expressway is still stuck". The Times of India. Archived from the original on 16 April 2018. Retrieved 1 June 2018.
  • ^ Jha, Bagish (30 May 2018). "Dwarka expressway oustees without registry to get alternative plots". The Times of India. Archived from the original on 1 June 2018. Retrieved 1 June 2018.
  • ^ Jha, Dhananjay (20 September 2017). "Gurgaon: 10km elevated road to come up on Dwarka Expressway, tenders invited". Hindustan Times. Archived from the original on 20 September 2017. Retrieved 21 October 2017.
  • ^ Jha, Dhananjay (18 October 2017). "Huda to acquire 10 acres land for revised CPR plan". Hindustan Times. Archived from the original on 22 October 2017. Retrieved 23 October 2017.
  • ^ Haryana govt transfers land to NHAI to start construction of Dwarka e-way, Moneycontrol.com, 7 Dec 2018.
  • ^ Sharma, Aman (18 November 2017). "Government invites bids for consultant for 4-km tunnel from Dwarka Expressway". The Economic Times. Archived from the original on 1 December 2017. Retrieved 1 June 2018.
  • ^ Route of Dwarka expressway.
  • ^ Jha, Dhananjay (20 June 2017). "Gurgaon: NPR project report to be submitted this week, tenders to be floated soon". Hindustan Times. Archived from the original on 27 June 2017. Retrieved 21 October 2017.
  • ^ Dash, Deepak K. (14 August 2017). "7 projects to reduce load on NH-8 stretch". The Economic Times. Archived from the original on 19 August 2017. Retrieved 21 October 2017.
  • ^ Southern Periphery Route nearing completion, 2017.
  • ^ 195 km super e-way to link Delhi, Jaipur, Times of India, 21 March 2017.
  • ^ "Union Ministers Lay Foundation Stone for Dwarka Expressway". 8 March 2019.
  • ^ "Package-2 of Dwarka Expressway Starts | Dwarka Expressway". 12 August 2019.
  • ^ "Dwarka Expressway before Independence Day 2022". The Financial Express. 5 March 2021. Archived from the original on 5 March 2021. Retrieved 4 July 2021.
  • ^ Tiwari, Siddharth (13 September 2021). "Land hurdle cleared, Dwarka expressway cloverleaf could be ready in a year". The Times of India. Retrieved 14 September 2021.
  • ^ "Dwarka expressway to be completed by December-end: Gadkari". 18 May 2023.


  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Dwarka_Expressway&oldid=1221747598"

    Categories: 
    Expressways in Delhi
    Transport in Gurgaon
    Transport in Delhi
    Expressways in Haryana
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
    Use dmy dates from October 2017
    Use Indian English from October 2017
    All Wikipedia articles written in Indian English
    Infobox road temporary tracking category 1
    Infobox road instances in India
    Pages using the Kartographer extension
     



    This page was last edited on 1 May 2024, at 19:17 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki