Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  





2 WAPDA Water vision 2025  





3 Functions  





4 Sporting teams  





5 Hospitals  





6 See also  





7 References  














Water & Power Development Authority






فارسی
سنڌي

اردو
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 

(Redirected from Pakistan Water and Power Development Authority)

Water & Power Development Authority
WAPDA
مقتدرہ ترقیات پانی و بجلی
Emblem of WAPDA

WAPDA House, Lahore-54000, Pakistan
Agency overview
FormedFebruary 22, 1958; 66 years ago (1958-02-22)
TypePower and Hydrology
JurisdictionFederal Government of Pakistan
HeadquartersWAPDA House, Lahore-54000, Pakistan
Agency executive
Parent agencyMinistry of Energy
Websitewww.wapda.gov.pk

The Pakistan Water & Power Development Authority (WAPDA; Urdu: مقتدرہ ترقیات پانی و بجلی) is a government-owned public utility agency maintaining hydropower and waterinPakistan, although it does not manage thermal power plants. WAPDA includes Tarbela and Mangla dams among its resources. Its headquartered in Lahore.

History[edit]

WAPDA was established by an act of parliament in 1958[2] to unify the maintenance of infrastructure previously overseen by provincial agencies. Its Chairmen included outstanding civil servants like Ghulam Ishaq Khan, Ghulam Faruque Khan and Aftab Ghulam Nabi Kazi who were subsequently President of Pakistan, Minister for Commerce and Economic Adviser, respectively. In October 2007, thermal power management was split into the newly formed Pakistan Electric Power Company (PEPCO).

WAPDA Water vision 2025[edit]

WAPDA has formulated a comprehensive $25–33 billion National Water Resource and Hydropower Development Programme, entitled Water Vision 2025. The Water Vision 2025 projects are expected to generate 16,000 MW of hydroelectricity. Other goals are to prevent water shortages, limit drought and increase water storage for a growing population. Five massive hydropower projects have been announced by the President of Pakistan; these are to be completed by 2016, with a generation capacity of 9,500 MW. Two of the projects are ready for construction, while three are in the stages of feasibility studies and preparation of tender documents.[3][4]

Water Vision 2025 consists of three phases. Phase I was expected to start in 1993 but was delayed. The priority of water sector projects under Phase I of Water Vision 2025 are Gomal Dam (Khyber Pakhtunkhwa), Mirani Dam and Mithan Kot Barrage at Kachhi Canal (Balochistan) raising of Mangla Dam (Azad Kashmir), Greater Thal Canal phase I (Punjab) and Thar/ Rainee Canals phase I (Sindh). The total cost of these Phase I projects will be $2.467 billion with a construction period of five years. Under Phase II, Hingol Dam, Balochistan Dam and Satpara Dam (Northern Areas), Chashma Right Bank Canal and Kurram Tangi Dam (NWFP), phase II of the Greater Thal Canal Akhori Dam and Sanjwal Dam (Punjab), phase II of Thar/Rainee Canals, Gajnai and Sehwan Barrage (Sindh) will be completed in 3–6 years, except Bhasha Dam, which will take 8–10 years for its completion. The total cost of Phase II projects will be $8.94 billion. These 11 projects will have a storage capacity of 12,790,000 acre-feet (15.78 km3), would generate over 3362 mW of power, and would irrigate 14000 square kilometers of land. Under Phase III, Yugo Dam, Skardu Dam, Dhok Dam, Rohtas Dam, Naulong Dam and Khadji Dam will be completed and under phase IV Katzarah Dam will be completed.

Functions[edit]

Before the disbundling of its power wing WAPDA was the principal agency of Pakistan for the development of its water resources and electric power network. During its prime WAPDA was the biggest state institution of the civil government of Pakistan. Since its inception in 1958 WAPDA has played a crucial role in the water & power sector and was the sole institution of the government of Pakistan for generation, transmission and distribution of power; Irrigation, water supply and drainage; Prevention of waterlogging and reclamation of waterlogged and saline lands; and Flood control. But after 2007 WAPDA’s mandate now is the development of water and hydropower resources in an efficient manner.

Sporting teams[edit]

Hospitals[edit]

There is a 260 Bedded WAPDA Teaching Hospital Complex at Lahore providing medical services to those in need. Additionally, there are 50 bedded hospitals at Tarbela, Peshawar, Gujranwala, Faisalabad, Hyderabad, Multan, Quetta & Guddu and 20 bedded hospital at Mangla and Sukkur which are fully functional and proving in-house services in all major clinical disciplines.

See also[edit]

References[edit]

  1. ^ "WAPDA Chairman discusses financing for WAPDA projects with French Ambassador".
  • ^ Water and Power Development Authority
  • ^ (R H Siddiqui) Wapda 'Vision 2025' to help solve power crises The Nation (newspaper), Published 24 September 2008, Retrieved 20 June 2021
  • ^ Fawad Yousafzai (12 May 2021). "Wapda endeavouring to add 9000MW to national grid by 2028". The Nation (newspaper). Retrieved 20 June 2021.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Water_%26_Power_Development_Authority&oldid=1230985970"

    Categories: 
    Pakistan federal departments and agencies
    Regulatory authorities of Pakistan
    Water companies of Pakistan
    Water supply and sanitation in Pakistan
    Government agencies established in 1958
    1958 establishments in Pakistan
    Water and Power Development Authority
    Ministry of Water Resources (Pakistan)
    Hidden categories: 
    Articles with short description
    Short description matches Wikidata
    Articles containing Urdu-language text
    Articles with ISNI identifiers
    Articles with VIAF identifiers
    Articles with LCCN identifiers
     



    This page was last edited on 25 June 2024, at 20:21 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki