Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Causes  



1.1  History  







2 Criticisms  





3 References  














Public performance measure







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 

(Redirected from Public Performance Measure)

The public performance measure (PPM) is a measure of the punctuality and reliability of passenger trainsinBritain. It is the percentage of scheduled trains which successfully run their entire planned route, calling at all timetabled stations, and arrive at their terminating station 'on time',[1] where 'on time' means within five minutes of the scheduled destination arrival time for London and South East and regional operators (i.e. commuter services), or within ten minutes for long-distance operators.[2]

It is the industry standard measurement of performance,[1] and has been used since 6 June 2000.[3]

The target for PPM varies each year and for each train operator, and is agreed with the Office of Rail Regulation. In October 2013 ORR said that, "Network Rail should... ensure that 92.5% of trains arrive on time nationally by 2019 (as measured using PPM), compared to 90.7% today."[4]

Causes[edit]

Network Rail delays due to infrastructure faults cause about 39% of delays, train operating companies 28%, weather, trespass, vandalism, cable theft and fatalities 20%, other train operating companies (mostly other passenger trains) 13%.[5]

History[edit]

Prior to PPM's introduction in 2000, there were a variety of punctuality measures. For example, in 1957 Gerry Fiennes published an analysis showing that permanent way restrictions accounted for 25% of delays, locomotives (eg poor steaming due to wrong type of coal for the engine) 25%, signals (mostly due to other delays) 15%, signal failures 10%, coach defects 8%, station duties 4% and miscellaneous (eg. open doors, lamps out, special stops) 13%.[6]

From 1 April 2019, Network Rail introduced a new 'more detailed and precise set of measures...The official measure of punctuality used up till now, known as the public performance measure (PPM), considers trains to be punctual if they are five or 10 minutes after schedule, for short and long-distance trains are respectively, at their destination. The new measures will report cancellations and the proportion of trains arriving to the minute at every station on the timetable, known as a ‘station stop’, where technology allows...'[7]

Criticisms[edit]

References[edit]

  1. ^ a b "Performance". NetworkRail. Archived from the original on 8 December 2015. Retrieved 29 April 2015.
  • ^ "Proportion of trains running on time". GOV.UK. Department for Transport. Retrieved 29 April 2015.
  • ^ "Methodology — Public Performance Measure". Office of Rail and Road. Retrieved 29 April 2015.
  • ^ "Final determination of Network Rail's outputs and funding for 2014-19". Office of Rail and Road. Retrieved 29 April 2015.
  • ^ "Network Rail July 2015 PPM info sheet". Archived from the original on 8 December 2015. Retrieved 14 March 2015.
  • ^ Railway Magazine September 1957 p. 597
  • ^ "Railway Performance". NetworkRail. Retrieved 24 June 2019.
  • ^ "Network Rail's claim of 'record punctuality' runs into criticism". RailNews. 27 May 2009. Retrieved 29 April 2015.
  • ^ Network Rail

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Public_performance_measure&oldid=1165602448"

    Categories: 
    Transport policy in the United Kingdom
    Department for Transport
    Network Rail
    Hidden categories: 
    Articles with short description
    Short description with empty Wikidata description
    Use dmy dates from July 2017
    Use British English from July 2017
    Articles needing additional references from July 2017
    All articles needing additional references
     



    This page was last edited on 16 July 2023, at 06:46 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki