This article may rely excessively on sources too closely associated with the subject, potentially preventing the article from being verifiable and neutral. Please help improve it by replacing them with more appropriate citationstoreliable, independent, third-party sources. (June 2019) (Learn how and when to remove this message)
|
The Redwood Solar Cluster is a 100 MW photovoltaic power station that is located in Kern County, California. The final phase, named Redwood 4, was completed in March 2018, and is located 12 miles east of downtown Bakersfield. Redwood 4 is rated at 26 MW.[1][2]
35°19′22″N 118°48′45″W / 35.3229°N 118.8124°W / 35.3229; -118.8124
![]() | This article about a California building or structure is a stub. You can help Wikipedia by expanding it. |