Sacramento Municipal Utility District







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 

(Redirected from SMUD)

Sacramento Municipal Utility District
Company typeMunicipal
IndustryElectricity
Founded1923
HeadquartersSMUD Headquarters Building
Sacramento, California, United States
RevenueIncrease US$ 1.652 Billion (2018)[1]

Operating income

Increase US$ 242.087 Million (2018)[1]

Net income

Increase US$ 209.138 Million (2018)[1]

Number of employees

2,278 (2018)[2]
Websitewww.smud.org

The Sacramento Municipal Utility District (SMUD) is a community-owned electric utility serving Sacramento County and parts of Placer County.[3] It is one of the ten largest publicly owned utilities in the United States, generating the bulk of its power through natural gas (estimated 35.2% of production total in 2020) and large hydroelectric generation plants (29.1% in 2020). SMUD's green power (renewable) energy output was estimated as 33.8% in 2020.[4]

SMUD owned the Rancho Seco Nuclear Generating Station nuclear power plant, shut down by a vote of the utility's rate-payers in the late 1980s. Although the nuclear plant is now decommissioned, its now-unused iconic towers remain on the site. Solar arrays and the 500-megawatt Cosumnes gas-fired plant have risen in proximity to the towers.

SMUD's headquarters building, built in the late 1950s on the edge of the East Sacramento neighborhood, is notable for its mural by Sacramento artist Wayne Thiebaud. The mural wraps around the ground floor of the building and is accessible to the public. It is one of the earliest major works by the artist, and remains his largest installation to date.

History[edit]

the decommissioned Rancho Seco Nuclear Generating Station

Created by a vote of Sacramento County residents on 2 July 1923 pursuant to the Municipal Utility District Act,[5][6] SMUD's ability to provide power to its customer-owners was stymied in the courts for nearly a quarter century by the investor-owned Pacific Gas & Electric Company (PG&E) of San Francisco.[7] A court ruling eventually sided with SMUD, which began providing power at the beginning of 1946.[7] SMUD is a public agency of the State of California, and as such is not subject to the Federal Energy Regulatory Commission's jurisdiction under the Federal Power Act.[8][9] Echoes of SMUD's fight to fulfill its original mandate from the voters have continued in more recent turf battles with PG&E. In the 1980s, residents of Folsom voted to join SMUD, with PG&E fighting the annexation in the courts. Folsom rate-payers are now part of SMUD. In 2006, PG&E successfully convinced SMUD rate-payers and rate-payers in Yolo County to vote down an annexation proposal that would have extended the public utility's service territory to include the Yolo County cities of West Sacramento, Davis and Woodland, along with territory between the three cities.

In February 2020, 75 project customers, including the Sacramento Municipal Utility District, received permanent federal water contracts for the Central Valley Project.[10][11]

Governance[edit]

SMUD is governed by a seven-member Board of Directors. Each member is elected by residents in a "ward" or constituency for four-year terms. As of January 2024 the directors[12] were:

Facilities[edit]

Loon Lake Reservoir

SMUD's electricity generation capacity derives from the watershed of the South Fork of the American River, called the "Upper American River Project (UARP)" in federal licensing documents. The project is an extensive complex of multiple retention dams, diversion dams, reservoirs, canals, tunnels and hydroelectric powerplants. The plants are run during hours of peak demand, though retaining sufficient flood control capacity dictates water releases to some extent.

From upstream to downstream, the District's UARP assets include:[13][14]

SMUD owns the first of potentially two natural gas power plants (the Cosumnes Power Plant, brought online in 2006 on property adjacent to the decommissioned Rancho Seco nuclear facility) as well as wind-powered and solar-powered electric generation facilities. In addition, the utility owns some small gas-fired peaker plants for meeting the highest energy demands, typically on Sacramento's notably blistering summer days.

SMUD is in the Advisory Council of the PHEV Research Center.

References[edit]

  1. ^ a b c "Consolidated Financial Statements Report of Independent Auditors". Sacramento Municipal Utility District. 2019. Retrieved 2022-08-23.
  • ^ "2018 Annual Report". Sacramento Municipal Utility District. Retrieved 2022-08-23.
  • ^ "Company information". Sacramento Municipal Utility District. Retrieved 2020-01-11.
  • ^ "2020 POWER CONTENT LABEL". Sacramento Municipal Utility District. 2020. Retrieved 2022-08-23.
  • ^ Sacramento Municipal Utility District v. Solano County et al., C023977 (1997).
  • ^ "PUBLIC UTILITIES CODE SECTION 11501-11509". LegInfo.ca. Archived from the original on 2010-11-06. Retrieved 2022-08-23.
  • ^ a b 1998 Congressional Record, Vol. 144, Page E13 (January 27, 1998)
  • ^ Northern California Power Agency v. Federal Power Commission, 514 F.2d 184 (1975), archived from the original on 14 May 2010.
  • ^ 16 U.S.C. § 824
  • ^ Boxall, Bettina (2020-02-29). "Westlands Water District gets permanent U.S. contract for massive irrigation deliveries". Los Angeles Times. Archived from the original on 2022-05-19. Retrieved 2020-03-02.
  • ^ "Bureau of Reclamation Completes First Group of Congressionally-Mandated California Central Valley Project Contract Conversions". Sierra Sun Times. March 2, 2010. Retrieved 2020-03-03.
  • ^ "Board of Directors". Sacramento Municipal Utility District. Retrieved 2022-08-23.
  • ^ "Upper American River Project" (PDF). Sacramento Municipal Utility District. Retrieved 2022-08-23.
  • ^ "Federal Register, Volume 71 Issue 151 (Monday, August 7, 2006". Govinfo.gov. Retrieved 2022-08-23.
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Sacramento_Municipal_Utility_District&oldid=1209413734"

    Categories: 
    Sacramento Municipal Utility District
    Municipal electric utilities of the United States
    Public utilities of the United States
    Sacramento County, California
    Special districts of California
    Companies based in Sacramento, California
    Hidden categories: 
    Articles with short description
    Short description matches Wikidata
    Articles with VIAF identifiers
    Articles with WorldCat Entities identifiers
    Articles with J9U identifiers
    Articles with LCCN identifiers
     



    This page was last edited on 21 February 2024, at 20:30 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki