Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Situation  





2 Planning  





3 Construction  





4 Post-construction  





5 Gallery  





6 References  














Senegambia bridge






Deutsch
Français
Bahasa Indonesia
Norsk bokmål
Norsk nynorsk
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 13°3059N 15°3421W / 13.51639°N 15.57250°W / 13.51639; -15.57250
 

From Wikipedia, the free encyclopedia
 

(Redirected from Senegambia Bridge)

Senegambia Bridge
Coordinates13°30′59N 15°34′21W / 13.51639°N 15.57250°W / 13.51639; -15.57250
CarriesTrans-Gambia Highway and Highway N4
CrossesGambia River
LocaleBamba Tenda, Gambia and Yelitenda, Gambia
Other name(s)Trans-Gambia Bridge
Maintained byNational Roads Authority[1]
Characteristics
Total length1.9 kilometres (1.2 mi)
Width12 metres (39 ft)
Longest span100 metres (110 yd)
History
DesignerBCEOM and SCET Tunisie
Constructed byIsolux Corsán and the Arezki Group
Construction costUS$ 93 million
OpenedJanuary 21, 2019
Statistics
TollUS$ 5 for cars
Location
Map

The Senegambia bridge, also known as the Trans-Gambia Bridge, is a bridge in The Gambia that carries the Trans-Gambia Highway connecting northern and southern Gambia. It also provides access to the isolated Casamance province from the rest of Senegal. A bridge had been proposed for this location in 1956 but political considerations delayed construction which finally began in 2015. Construction was funded largely by a loan of US$ 65 million from the African Development Bank, with remaining funding coming from the Gambian government. Construction works were carried out by a joint venture of Spanish company Isolux Corsán and the Senegalese Arezki Group.

The bridge, made from reinforced concrete, opened to light vehicles on 21 January 2019. At 1.9 kilometres (1.2 mi) in length it is one of West Africa's longest bridges and includes a 100-metre-wide (110 yd) central span to facilitate continued use of the river by boats. The Senegambia bridge forms part of the Trans-Gambia Highway and the Trans–West African Coastal Highway.

Situation[edit]

The bridge lies approximately 10 kilometres (6 mi) south of Farafenni, a Gambian town on the border with Senegal, and carries the Trans-Gambia Highway across the Gambia River,[2] which runs east-west through The Gambia and splits the country in two. The river also prevents easy movement of people from the main portion of Senegal, which lies north of The Gambia, to its southern province of Casamance which is south of the river.[3] Travellers had previously used a ferry crossing at this location, but it was unreliable and delays of 10–20 days waiting for a ferry were not uncommon.[3][4] The alternative was a 400-kilometre (250 mi) detour eastwards to the next available crossing of the Gambia River.[4] Development in Casamance had been hindered by the poor access to the rest of the country.[2]

Planning[edit]

The bridge was first mooted in 1956 and the French government committed funds for its construction in 1971 but the start of works was delayed by periods of strained tensions between Gambia and Senegal.[3][5] The project was formerly led by the Organisation pour la Mise en Valeur du Fleuve Gambie (OMVG) which commissioned engineering feasibility studies of the scheme from French firm BCEOM and Tunisian firm SCET Tunisie in the 1990s.[1] These studies were updated by the same companies between 2007 and 2009 and form the basis of the current design which has a 100-year design life.[1][6]

Funding was finally secured through the African Development Fund (ADF) of the African Development Bank (ADB), which contributed US$ 65 million as lead lender for the project.[7][8] The remaining funding was approved for the project by the Alliance for Patriotic Reorientation and Construction government of Gambia; who state that no contribution was made by Senegal.[9] Approval to proceed was granted by the government of Gambia in 2011.[6]

Construction[edit]

Final design and planning work commenced in 2012 and construction began in 2015.[2][3] Construction was led by a joint-venture of Spanish company Isolux Corsán and the Senegalese Arezki Group. The construction contract had a value of 51.7 million euros.[10]

The structure is made of reinforced concrete and has a total length of 1.9 kilometres (1.2 mi) – of which the section that crosses the river is 942 metres (1,030 yd) long.[2][3][6] It has piled foundations but unexpectedly thick layers of mud (up to 20 metres (66 ft) in depth) on the river banks caused delays in construction.[11] It is one of the longest bridges in West Africa and incorporates a 100-metre-wide (110 yd) central span to allow for passage of boats along the river.[7][10] The bridge deck is 12 metres (39 ft) wide and carries a 7.5-metre-wide (25 ft) single-carriageway road.[12]

The bridge's official name is a portmanteau of the names of Senegal and Gambia and is intended to reflect the bonds of friendship between the two countries, but it is also known as the Trans-Gambia Bridge.[11][13] Total project costs were $93 million.[6] A large portion of the workforce were local: 58 % were Gambians and 20 % were from the wider ECOWAS countries.[11]

The bridge's opening ceremony took place on 21 January 2019 and was led by Gambia's President Adama Barrow and Senegal's President Macky Sall who made the first official crossing of the bridge together shortly after 4:30 p.m. local time.[3][14] Gambian Vice President Fatoumata Tambajang, the minister of works Bai Lamin Jobe and his Senegalese counterpart Abdoulaye Daouda Diallo were also in attendance.[13][15] Zinguinchor mayor Abdoulaye Baldé and Senegalese national football team coach Aliou Cissé were also present and Senegalese musician Youssou Ndour performed music at the opening ceremony.[3][15]

Work to complete the bridge is ongoing, which prevents its opening to anything heavier than a small car.[16] A toll of US$5 is levied for each crossing.[3] Completion of the structure is expected in July 2019.[3] The bridge forms part of a link on the proposed Trans–West African Coastal Highway, part of the Trans-African Highway network.[1] This project, spearheaded by the New Partnership for Africa's Development seeks to link Nouakchott in Mauritania with LagosinNigeria via a 15-country, 4,560-kilometre (2,830 mi) highway in the hope of boosting trade and co-operation in the region.[17]

Post-construction[edit]

It is hoped that the road will improve co-operation between Gambia and Senegal and facilitate trade in minerals, fuels and foodstuffs.[7][13] It has had a marked effect on journey times; a trip by road from DakartoZiguinchor which previously took a day can now be completed within five hours.[3] Local ferry operators and roadside vendors have complained about the loss of revenue following construction of the bridge.[18]

There is a dispute between the Gambia Ferries Service and the National Roads Authority over which government agency is entitled to the revenue from the bridge. The Ministry of Works, Transport and Infrastructure has negotiated a temporary arrangement whereby the revenue is split between the two. The Gambian press has criticised the government for failing to set up a public–private partnership to ensure tolls fund the future maintenance of the structure.[19]

Gallery[edit]

References[edit]

  1. ^ a b c d "Trans-Gambia Corridor Project". National Roads Authority. Retrieved 2 February 2019.
  • ^ a b c d "Long-awaited bridge over River Gambia inaugurated". News24. Agence France-Presse. 22 January 2019. Retrieved 22 February 2019.
  • ^ a b c d e f g h i j "Bridge ends 'centuries' of commuting chaos". BBC. 23 January 2019. Retrieved 22 February 2019.
  • ^ a b Kemboi, Linus (5 February 2019). "Senegal inaugurates the new Senegambia bridge". Construction Review Online. Retrieved 22 February 2019.
  • ^ "Senegambia Bridge belongs to Gambia: President Sall". The Point. 23 January 2019. Retrieved 23 January 2019.
  • ^ a b c d "Landmark Senegambia bridge inaugurated". Agence de Presse Africaine News. Retrieved 23 February 2019.
  • ^ a b c "Africa is confronting border challenges with these access bridge links". Ventures Africa. 4 February 2019. Retrieved 22 February 2019.
  • ^ Enoghase, Sylvester (10 February 2019). "Africa Future: From Market Stall To Cyberspace". Independent Newspapers Nigeria. Retrieved 22 February 2019.
  • ^ Manneh, Yankuba Jallow And Nelson (8 February 2019). "Gambia: Review Deportation of Gambians From Abroad – APRC Interim Leader". Foroyaa Newspaper. Retrieved 22 February 2019.
  • ^ a b "Isolux Corsán Awarded Its First Contract in Gambia for the Construction of a Bridge for 51.7M€". CISION PR News Wire. Retrieved 23 February 2019.
  • ^ a b c Kang'ereha, Dorcas (26 July 2018). "Gambia to inaugurate Trans-Gambia Bridge in January 2019". Construction Review Online. Retrieved 25 February 2019.
  • ^ "From Trans-Gambia to Senegambia – A bridge over troubled water?". 4IP Group. 29 January 2019. Retrieved 23 February 2019.
  • ^ a b c "Senegambia Bridge Inaugurated". Foroyaa Newspaper. 22 January 2019. Retrieved 22 February 2019.
  • ^ "Sénégal – Gambie: inauguration du « Senegambia Bridge » (vidéo de réalisation)". Benin Web TV (in French). 23 January 2019. Retrieved 23 February 2019.
  • ^ a b "Sénégal-Gambie : Macky Sall et Adama Barrow inaugurent le « Senegambia Bridge »". KOACI. Retrieved 23 February 2019.
  • ^ "Why Is The Senegambia Bridge Opened Before Completion?". Foroyaa Newspaper. 24 January 2019. Retrieved 22 February 2019.
  • ^ "Highways link 15 West African countries". United Nations. Africa Renewal Online.
  • ^ Jabkhiro, Juliette (1 February 2019). "Trans-Gambia bridge a boon for trade, but a blow for local traders". Reuters. Retrieved 22 February 2019.
  • ^ Mbai, Pa Nderry (15 February 2019). "The Trans-Gambia Bridge – A Symbol of Senegambian Unity or A Source of Discord". Freedom Newspaper. Retrieved 22 February 2019.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Senegambia_bridge&oldid=1226851051"

    Categories: 
    Bridges completed in 2019
    Bridges in the Gambia
    Road bridges
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    CS1 French-language sources (fr)
    Articles with short description
    Short description is different from Wikidata
    Coordinates on Wikidata
    Infobox mapframe without OSM relation ID on Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 2 June 2024, at 06:29 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki