Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Train services  





2 Route  





3 Partial closure  





4 Continuing goods traffic and mothballing  





5 Future potential reopening  





6 References  














Thornbury branch line







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 

(Redirected from Thornbury Branch Line)

Route map (Click to expand)
  • t
  • e
  • Thornbury
    Branch Line

    Thornbury

    Grovesend Tunnel

    Tytherington Quarry

    Tytherington Tunnel

    Tytherington

    Iron Acton

    Frampton Cotterell
    freight line

    Yate
    The branch departs from the main line at Yate.
    The branch near Iron Acton

    The Thornbury branch line is a railway line from YatetoThornbury in the West of England. From 1963 until mid 2013, it remained as a freight route, serving the quarry at Tytherington. It was designated 'Out of Use (temporary)' by Network Rail from 2013 until 2017, when it reopened to serve Tytherington quarry again.[1] The 7.5-mile (12 km) branch of the Midland Railway line between Bristol and Gloucester opened on 2 September 1872, and started at Yate and finished at Thornbury, with stops at Iron Acton and Tytherington.

    Train services[edit]

    The line's services first consisted of two trains in each direction per day, connecting at Yate with mainline trains. Later trains appeared to be running from Thornbury down to Bristol Temple Meads, although the services were infrequent. By 1910, there were four trains in each direction every weekday. In 1944 the passenger train was run by a class 1P 0-4-4 tank with three coaches, which spent the night at Thornbury. The journey took 19 to 22 minutes. During World War 2 12-coach trains took wounded to hospital at Thornbury.[2]

    Route[edit]

    The first 12 mile (0.80 km) was level. 1.5 miles (2.4 km) fell at 1 in 176 to Iron Acton. The climb to Tytherington was at 1 in 86, followed by 1 in 59 to Tytherington Tunnel and a siding to a quarry. The 224 yards (205 m) long tunnel was lined only at the ends and a fall of rock blocked the line for a week in 1956. Beyond the tunnel, railway ballast was supplied by Grovesend Quarry. From the 167 yards (153 m) Grovesend Tunnel the line fell at 1 in 50 through a limestone cutting to Thornbury.[2]

    Partial closure[edit]

    The 1 mile 7 chains (1.8 km) branch to iron-stone mines at Frampton Cotterell was authorised by an Act of 1865, but the mines failed, and Midland's Way & Works Committee agreed to lift the line at its 15 April 1878 meeting, though it wasn't done until 1892.[2]

    On 19 June 1944, the line was closed to passenger traffic. In the 1960s, the stations were demolished, apart from Yate, which was closed with other stations on the Bristol to Gloucester line in 1965 and then re-opened in 1989. The section of track from Tytherington Quarry to Thornbury was dismantled after the closure of the goods depot at Thornbury in 1966.

    Continuing goods traffic and mothballing[edit]

    The rest of the line remained open to goods traffic, serving the Tytherington Quarry with very occasional freight services. Following the cessation of these services and with no near term resumption of traffic expected, the line was designated 'Out of Use (temporary)' beyond milepost 0 mi 30 ch in mid 2013.[1]

    The line returned to use in June 2017 following the reopening of the quarry by operators Hanson. An initial test run operated on 4 June 2017, with occasional loaded trains running from the quarry thereafter.

    Future potential reopening[edit]

    Studies into reopening the branch line have been made in a consultation report produced by Halcrow Group in 2014,[3] as well as the November 2015 joint transport study report produced by The West of England Local Enterprise Partnership.[4] In 2013 the estimated cost of this would be £38 million.[5]

    Suggestion was made as part of the West of England Combined Authority (Weca) Joint Local Transport Plan to reopen the line along with others in the MetroWest project. However, in 2017 Weca found there would be several challenges in delivering this proposal,[6] as the former rail alignment into Thornbury is now occupied by an industrial estate and there is no practical routing into the town. The station would therefore have to be located on the edge of Thornbury at a significant distance from the town centre, making it less attractive to passengers. The Grovesend tunnel would also need to be reopened, with its current condition unknown, and there would be capacity constraints at Westerleigh Junction. This led to the authority deciding not to pursue reopening the line. FOSBR continue to advocate reopening the line in the future.[7]

    In 2020, the line was mentioned by Railway Gazette International as having potential for future funding from the Department for Transport's "Restoring Your Railway" initiative.[8]

    References[edit]

    1. ^ a b "Establishment of proposed G1 Short Term Network Change: Tytherington Branch (from 0m 30ch) Designation as "Out of Use (temporary)"" (PDF). Swindon: Network Rail. 10 September 2013. STNC/G1/2013/WEST/565. Retrieved 3 November 2013.
  • ^ a b c Railway Magazine December 1957 pp. 866-868 Colin G. Maggs: The Thornbury Branch
  • ^ "Final Report West of England Area Rail Studies" (PDF). Halcrow. Archived from the original (PDF) on 11 March 2016. Retrieved 14 March 2017.
  • ^ "West of England Joint Transport Study Key Principles Report" (PDF). Atkins. Retrieved 14 March 2017.
  • ^ Gardner, Rachel (4 January 2013). "Calls made for Thornbury railway line to re-open". Bristol Post. Retrieved 14 March 2017.
  • ^ "West of England Joint Transport Study - Executive Summary - October 2017" (PDF). West of England Combined Authority. 30 October 2017. Retrieved 26 April 2019.
  • ^ "October 2017 - Issue 95(V2)" (PDF). FOSBR. October 2017. Retrieved 25 April 2019.
  • ^ "Restoring Your Railway Fund could provide a toolkit for town transformation". Railway Gazette International. 23 June 2020. Retrieved 23 June 2020.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Thornbury_branch_line&oldid=1171395029"

    Category: 
    Railway lines in South West England
    Hidden categories: 
    Articles with short description
    Short description is different from Wikidata
    Use dmy dates from April 2022
    Commons category link from Wikidata
     



    This page was last edited on 20 August 2023, at 21:38 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki