El Atazar Dam





Article  

Talk  



Language  

Watch  

Edit  





El Atazar Dam is an arch dam built near Madrid, Spain on the Lozoya River, very close to where the Lozoya joins the Jarama. The curved design of the dam is optimum for the narrow gorge in which it was built to retain water in the reservoir. Arch dams are thin and require less material to construct than other dam types.[1]

El Atazar Dam
The dam in 2014
CountrySpain
LocationCommunity of Madrid
Coordinates40°54′44N 3°28′24W / 40.91222°N 3.47333°W / 40.91222; -3.47333
StatusCompleted
Construction began1968
Dam and spillways
Height (foundation)134 m (440 ft)
Length52.3 m (171.6 ft)
Reservoir
CreatesEl Atazar Reservoir
Total capacity426 hm3 (1.50×1010 cu ft)
Surface area10.7 km²
The reservoir

When the dam was built, the decision was made to use the dam to store and regulate water only and not to provide energy. Construction started on the dam in 1968 and finished in 1972.

Design

edit

The dam is 134 m (440 ft) high and 52.3 m (171.6 ft) wide at the foundation. The reservoir capacity is 424,000,000 m3 (344,000 acre feet). It is a double curvature concrete arch buttress design.[2]

Problems

edit

Monitoring of the dam revealed abnormal movement. Although dams normally move, the left side of the El Atazar Dam was moving more than the right because a support built on the dam's right made that side less flexible. In 1977 a crack was noticed in the dam. By 1979 the crack had grown to 46 m (150 ft) in length and was repaired. Inspection in 1983 revealed that the settling in the foundations and the movements of the dam had caused fracturing in the rock, resulting in significantly increasing the foundation's permeability. The crack has been treated and since then the problems have abated.[3]

Power plant

edit

The dam supports a hydroelectric power plant with a nameplate capacity of 9,56 MW. Its annual generation lies between 18,66 (2012) and 44,49 (1998) GWh. The power station contains 2 Francis turbine-generators with 4,78 MW (5,4 MVA) each. The turbine rotation is 500 rpm. The hydraulic head is 56 m. Maximum flow per turbine is 8 m³/s.[4]

edit

Notes

edit
  1. ^ "Dam basics". PBS. Retrieved 2006-12-31.
  • ^ "El Atazar Background". Archived from the original on 2006-12-30. Retrieved 2006-12-31.
  • ^ "El Atazar Problem". Sim Science. Archived from the original on 27 September 2006. Retrieved 20 September 2018.
  • ^ "LAS ENERGÍAS RENOVABLES EN LA COMUNIDAD DE MADRID" (PDF) (in Spanish). www.fenercom.com. p. 57, 255–256. Retrieved 2020-09-12.
  • edit

    Retrieved from "https://en.wikipedia.org/w/index.php?title=El_Atazar_Dam&oldid=1210977935"
     



    Last edited on 29 February 2024, at 06:49  





    Languages

     


    Deutsch
    Español
    Nederlands
    Norsk bokmål
    Norsk nynorsk
    Svenska
     

    Wikipedia


    This page was last edited on 29 February 2024, at 06:49 (UTC).

    Content is available under CC BY-SA 4.0 unless otherwise noted.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Terms of Use

    Desktop