Home  

Random  

Nearby  



Log in  



Settings  



Donate  



About Wikipedia  

Disclaimers  



Wikipedia





Jurong Lake District MRT station





Article  

Talk  



Language  

Watch  

Edit  





Jurong Lake District MRT station is a future underground Mass Rapid Transit station on the Cross Island line (CRL) located in Jurong East, Singapore. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.

 CR19 
Jurong Lake District
裕廊湖区[1]
ஜூரோங் லேக் வட்­டா­ரம்[2]

Future Mass Rapid Transit (MRT) station
Future site of the Jurong Lake District station in the future Jurong Lake District
General information
Coordinates1°19′38N 103°44′21E / 1.327245°N 103.739080°E / 1.327245; 103.739080
Owned byLand Transport Authority
Line(s)
Construction
Structure typeUnderground
AccessibleYes
History
Opening2032; 8 years' time (2032)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
West Coast
towards Aviation Park
Cross Island Line

Future service
Terminus

Location

Singapore MRT/LRT system map
Singapore MRT/LRT system map

Jurong Lake District

Jurong Lake District station in Singapore

History

edit

Jurong Lake District station was first announced on 20 September 2022 by Transport Minister S Iswaran. The station will be constructed as part of Phase 2 of the Cross Island line (CRL), a 15-kilometre (9.3 mi) segment spanning six stations from Turf City station to this station.[3][4] The station is expected to be completed in 2032.[5]

Details

edit

Jurong Lake District station will serve the Cross Island line (CRL) and have an official station code of CR19. The station will be located in the future Jurong Lake District.[6] Due to the station's proximity to the nearby Jurong Town Hall station on the Jurong Region line, Transport Minister Iswaran stated a connection between the two stations is being studied, but added that the two stations are intended to serve "different commuter movement objectives".[7]

References

edit
  1. ^ "跨岛线第二阶段将有六个地铁站 预计2032年竣工". 早报 (in Chinese). 20 September 2022. Archived from the original on 21 September 2022. Retrieved 20 September 2022.
  • ^ "குறுக்குத் தீவு ரயில்பாதையின் 2ஆம் கட்டம் 2032ல் திறப்பு". tamilmurasu (in Tamil). 21 September 2022. Archived from the original on 21 September 2022. Retrieved 21 September 2022.
  • ^ Chew, Hui Min (20 September 2022). "Six more MRT stations will be built in Phase 2 of Cross Island Line; to open by 2032". CNA. Archived from the original on 20 September 2022. Retrieved 20 September 2022.
  • ^ Kok, Yufeng (20 September 2022). "Cross Island Line phase 2 to open by 2032 with 6 MRT stations, from Turf City to Jurong Lake District". The Straits Times. Archived from the original on 20 September 2022. Retrieved 20 September 2022.
  • ^ "Cross Island Line Phase 2". LTA. 20 September 2022. Archived from the original on 20 September 2022. Retrieved 20 September 2022.
  • ^ "CR19 Jurong Lake District". LTA. Archived from the original on 20 September 2022. Retrieved 20 September 2022.
  • ^ Lee, Amanda (24 September 2022). "Authorities studying if Jurong Lake District, Jurong Town Hall stations will be linked as interchange: S. Iswaran". The Straits Times. Archived from the original on 10 January 2023. Retrieved 24 September 2022.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Jurong_Lake_District_MRT_station&oldid=1196945104"
     



    Last edited on 18 January 2024, at 23:05  





    Languages

     




     

    Wikipedia


    This page was last edited on 18 January 2024, at 23:05 (UTC).

    Content is available under CC BY-SA 4.0 unless otherwise noted.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Terms of Use

    Desktop