Home  

Random  

Nearby  



Log in  



Settings  



Donate  



About Wikipedia  

Disclaimers  



Wikipedia





L (New York City Subway service)





Article  

Talk  



Language  

Watch  

Edit  





The L 14th Street–Canarsie Local[3] is a rapid transit service in the B Division of the New York City Subway. Its route emblem, or "bullet", is colored medium gray since it serves the BMT Canarsie Line.[4]

"L" train symbol
14th Street–Canarsie Local
Manhattan-bound L train of R143satNew Lots Avenue
Map of the "L" train
Northern endEighth Avenue
Southern endRockaway Parkway
Stations24
Rolling stockR143
R160[1][2]
(Rolling stock assignments subject to change)
DepotEast New York Yard
Started serviceJune 30, 1924; 100 years ago (1924-06-30)

Route map

Down arrow  L 

Eighth Avenue

Sixth Avenue Port Authority Trans-Hudson

Union Square

Third Avenue

First Avenue

Bedford Avenue

Lorimer Street

Graham Avenue

Grand Street

Montrose Avenue

Morgan Avenue

Jefferson Street

DeKalb Avenue

Myrtle–Wyckoff Avenues

Halsey Street

Wilson Avenue
(Disabled access northbound)

Bushwick Avenue–Aberdeen Street

Broadway Junction

no regular service via Jamaica

Atlantic Avenue

Sutter Avenue

Livonia Avenue

New Lots Avenue

East 105th Street

Canarsie–Rockaway Parkway
Up arrow  L 

Legend


Lines used by the "L" train

Other services sharing tracks with the "L" train

Unused lines, connections, or service patterns
 L 
Termini of services

Cross-platform interchange

Platforms on different levels
  • talk
  • edit
  • The L operates at all times between Eighth AvenueinChelsea, Manhattan, and Rockaway ParkwayinCanarsie, Brooklyn. It also briefly enters QueensatHalsey Street, serving the neighborhood of Ridgewood.[5] It is the first New York City Subway service to be automated using communications-based train control.

    The L commenced its current route and service pattern upon completion of the Canarsie Line in 1928. Express trains formerly ran along the L's trackage in central Brooklyn, running along the BMT Fulton Street Line in eastern Brooklyn, but were discontinued in 1956. Since then, the L has been entirely local.

    The L was originally the Brooklyn–Manhattan Transit Corporation's 16 service. The 16 became the LL in 1967 and then the L in 1985. In the early 2000s, the L saw a dramatic increase in ridership since many neighborhoods along the route have experienced gentrification. From April 2019 to April 2020, late-night and weekend L service between Manhattan and Brooklyn was temporarily reduced as part of the 14th Street Tunnel shutdown, which sought to repair damage to the 14th Street Tunnel incurred by Hurricane Sandy in 2012.[6]

    History

    edit

    Early history

    edit

    1924–1967

    edit
    November 26, 1967 – June 1979 bullet  
    June 1979 – May 6, 1985 bullet  
    Original 16 designation for the BMT Canarsie Line service  

    The L was originally given the LL designation when letters were assigned to the BMT division. From 1928 to 1967, the same service was assigned the BMT number 16.

    In 1924, part of the eventual 14th Street–Canarsie Line opened, called the『14th Street–Eastern District Line』(commonly the "14th Street–Eastern Line"), and was given the number 16. This was extended east, and in 1928 it was joined to the existing BMT Canarsie Line east of Broadway Junction. Since that time, the 14th Street–Canarsie Line service has operated as it is today, except for an extension from Sixth AvenuetoEighth Avenue, which opened on May 30, 1931, to connect to the new Eighth Avenue Subway. The Eighth Avenue Terminal was originally built in IND style and has been restored to BMT style like Fulton Street and Broad Street. During rush hours, express service ran nonstop between Lorimer Street and Myrtle–Wyckoff Avenues. (Locals usually ran from Eighth AvenuetoMyrtle–Wyckoff AvenuesorAtlantic Avenue at these times.)[7]

    Before the 14th Street–Eastern and Canarsie Lines were connected, the Canarsie part of the line already had a number, 14, running from Lower Manhattan via the Broadway Elevated and called the Canarsie Line.[8] When the 14th Street–Eastern Line was connected in 1928, this was renamed the Broadway (Brooklyn) Line, but continued to operate to Rockaway Parkway.[9]

    Starting on September 23, 1936, express trains ran to Lefferts Boulevard via the connection with the Fulton Street Elevated at Atlantic Avenue.[10] This connection was severed on April 30, 1956, then the service ran to Rockaway Parkway again, but was discontinued on August 23. The R27 to R38's roll signs had both L and LL for express and local service, even though the express never ran thereafter.

    1967–1985

    edit

    On November 26, 1967, with the opening of the Chrystie Street Connection, the BMT Eastern Division lines were given letters. The 14 to Canarsie was given the label JJ (though the 14 main line was designated KK, continuing east from Broadway Junction towards Jamaica). On the other hand, the 16 became the LL.[11] Canarsie service to Lower Manhattan was discontinued in 1968.[12] When double letters were dropped on May 5, 1985, the LL became the L, and it still has that designation.[13]

    Skip-stop service proposal

    edit

    In 1991, skip-stop service was proposed to speed service during the height of rush hours in the peak direction which would have reduced the running time from 41 minutes to 37 minutes. Under this plan, the K designation, which was previously used as the Broadway Brooklyn Local from 1967 to 1976, and as the Eighth Avenue Local from 1985 to 1988, would be repurposed and would appear in a gray bullet similar to the color the L uses. Both services would have common stops at Rockaway Parkway, Broadway Junction (then called Eastern Parkway), Myrtle Avenue, Lorimer Street, First Avenue, Union Square, Sixth Avenue and Eighth Avenue. L trains would stop at East 105th Street, Livonia Avenue, Atlantic Avenue, Wilson Avenue, DeKalb Avenue, Morgan Avenue, Grand Street, and Bedford Avenue; K trains would stop at New Lots Avenue, Sutter Avenue, Bushwick Avenue–Aberdeen Street, Halsey Street, Jefferson Street, Montrose Avenue, Graham Avenue and Third Avenue. This change was proposed as a service improvement alongside other changes that would have either reduced or eliminated service to balance the MTA's operational budget, but was never implemented.[14]

    Modernization and rehabilitation

    edit

    Ridership and CBTC

    edit
    Ridership

    Annual ridership for the L service:[15]

    Headways:[15]

    The 5 busiest stations in 2005:[15]

    1. First Avenue, Manhattan
    2. Bedford Avenue, Williamsburg, Brooklyn
    3. Canarsie–Rockaway Parkway, Canarsie, Brooklyn
    4. DeKalb Avenue, Bushwick, Brooklyn
    5. Graham Avenue, Williamsburg, Brooklyn

    The stations with greatest ridership increases in 2014:[16]

    Ridership on the L has increased dramatically since 2000 since many neighborhoods along the route have experienced gentrification. The Metropolitan Transportation Authority's $443 million fleets of subway cars on the L was introduced in 2002, but by 2006 was already too small to handle growing ridership. The Transit Authority had projected that 212 Kawasaki-made R143 subway cars would be enough to accommodate ridership demands for years to come, but ridership has risen higher than expected. Therefore, sixty-four new R160A cars manufactured by Alstom were equipped with CBTC so they could run on the L.

    The BMT Canarsie Line tracks underwent an extensive retrofit over to CBTC, a system that controls the trains via a computer onboard, as opposed manually operated by a human operator. This was completed in early 2009.[17] While the retrofit has resulted in nearly two years of service changes and station closings, this system will eventually allow trains to run closer together and enables in-station "countdown clock" displays to note the exact time until the next train arrives. The line also used OPTO (one person train operation) beginning in June 2005, but a combination of public outcry regarding perceived safety issues, which increased after the July 2005 London tube bombings, heavy lobbying by the Transport Workers Union of America (TWU), as well as an arbitration ruling that MTA had breached its contract with TWU caused the Metropolitan Transportation Authority to end OPTO the following September. However, the MTA's successful implementation of countdown clocks on the L was the first in the system.[18]

    On April 27, 2003, midday L service was reduced to run every 8 minutes instead of every 6 minutes.[19]

    14th Street Tunnel shutdown

    edit

    Starting April 27, 2019,[20] L service was limited between Third Avenue and Bedford Avenue on late nights and weekends to allow for repairs on the Canarsie Line tunnels under the East River, which were badly damagedbyHurricane Sandy in 2012. Trains in both directions operated on one tube between Third and Bedford Avenues while late night and weekend work was done on the other tube.[21] The original plan was for a full 15-month closure with both tubes closed simultaneously west of Bedford Avenue,[22][23] but the plans were revised in January 2019.[21] On April 26, 2020, New York governor Andrew Cuomo announced the completion of the project, months ahead of schedule.[24][25]

    Route

    edit

    Service pattern

    edit

    The L uses the following lines with the same service pattern at all times.[26]

    Line From To Tracks
    BMT Canarsie Line Eighth Avenue Canarsie–Rockaway Parkway all

    Stations

    edit

    The L runs on the BMT Canarsie Line in its entirety.[3]

    Station service legend
      Stops all times
      Stops all times except late nights
      Stops late nights only
      Stops weekdays during the day
      Station closed
      Stops rush hours/weekdays in the peak direction only
    Time period details
      Station is compliant with the Americans with Disabilities Act
      ↑ Station is compliant with the Americans with Disabilities Act
    in the indicated direction only
      ↓
      Elevator access to mezzanine only
      Stations   Subway transfers Connections
    Manhattan
    Canarsie Line
      Eighth Avenue   A  C  E   (IND Eighth Avenue Lineat14th Street) M14A / M14D Select Bus Service
      Sixth Avenue F   <F>  M   (IND Sixth Avenue Lineat14th Street)
    1  2  3   (IRT Broadway–Seventh Avenue Lineat14th Street)
    PATHat14th Street
    M14A / M14D Select Bus Service
      Union Square   4  5  6   <6>   (IRT Lexington Avenue Line)
    N  Q  R  W   (BMT Broadway Line)
    M14A / M14D Select Bus Service
      Third Avenue M14A / M14D Select Bus Service
      First Avenue   M14A / M14D Select Bus Service
    Northbound M15 Select Bus Service
    Brooklyn
      Bedford Avenue     NYC Ferry: East River Route (at North Sixth Street west of Kent Avenue)
      Lorimer Street   G   (IND Crosstown LineatMetropolitan Avenue)
      Graham Avenue
      Grand Street  
      Montrose Avenue
      Morgan Avenue
      Jefferson Street
      DeKalb Avenue
      Myrtle–Wyckoff Avenues   M   (BMT Myrtle Avenue Line) Some a.m. rush hour trips begin or end their runs to/from Eighth Avenue at this station
      Halsey Street
      Wilson Avenue   ↑ Station is ADA-accessible in the northbound direction only.
      Bushwick Avenue–Aberdeen Street
      Broadway Junction A  C   (IND Fulton Street Line)
    J  Z   (BMT Jamaica Line)
      Atlantic Avenue LIRR Atlantic BranchatEast New York
      Sutter Avenue
      Livonia Avenue   Out-of-system transfer with MetroCard/OMNY:
    2  3  4  5   (IRT New Lots LineatJunius Street)
      New Lots Avenue B15 bus to JFK Int'l Airport
      East 105th Street Some northbound rush hour trips begin at this station
      Canarsie–Rockaway Parkway   B82 Select Bus Service; free in-station transfer to B42 bus and westbound B6 and B82 buses.

    Notes

    edit

    References

    edit
    1. ^ 'Subdivision 'B' Car Assignment Effective December 19, 2021'. New York City Transit, Operations Planning. December 17, 2021.
  • ^ "Subdivision 'B' Car Assignments: Cars Required November 1, 2021" (PDF). The Bulletin. 64 (12). Electric Railroaders' Association: 3. December 2021. Retrieved December 3, 2021.
  • ^ a b "L Subway Timetable, Effective December 4, 2022". Metropolitan Transportation Authority. Retrieved June 28, 2024.
  • ^ "MTA Colors". MTA.info. Metropolitan Transportation Authority. Retrieved June 7, 2017.
  • ^ "Queens Bus Map" (PDF). MTA.info. Metropolitan Transportation Authority. January 2017. Archived from the original (PDF) on April 16, 2008. Retrieved June 7, 2017.
  • ^ "Coronavirus Update: Hospitalizations Down, Deaths up Slightly to 437 in NY". ABC7 New York. March 6, 2020. Retrieved April 26, 2020.
  • ^ Line by line history L train
  • ^ "CELEBRATE OPENING OF SUBWAY LINK; Civic and City Officials Ride in First Train Over 14th St. Line to Brooklyn". The New York Times. June 1, 1924. Retrieved April 16, 2018.
  • ^ "EXPECT GAIN ON B.M.T. LINE; Officials Say Old Habits of Patrons Hold Down Canarsie Traffic". The New York Times. July 17, 1928. Retrieved April 16, 2018.
  • ^ "B.M.T. TO SPEED UP QUEENS SERVICE; New Multi-Section Cars to Be Used for Special Rush-Hour Trips Starting Wednesday". The New York Times. September 21, 1936. Retrieved April 16, 2018.
  • ^ Perlmutter, Emanuel (November 16, 1967). "SUBWAY CHANGES TO SPEED SERVICE: Major Alterations in Maps, Routes and Signs Will Take Effect Nov. 26" (PDF). The New York Times. Retrieved July 7, 2015.
  • ^ Hofmann, Paul (July 1, 1968). "SKIP-STOP SUBWAY BEGINS RUN TODAY; KK Line Links 3 Boroughs—Other Routes Changed". The New York Times. ISSN 0362-4331. Retrieved November 27, 2016.
  • ^ "Hey, What's a "K" Train? 1985 Brochure". Flickr – Photo Sharing!. June 17, 2016. Retrieved June 17, 2016.
  • ^ "1991 Service Capacity Plan" (PDF). New York City Transit Authority. January 4, 1991. p. 207. Retrieved February 11, 2020.
  • ^ a b c Donohue, Pete (July 7, 2006). "Oh, L, Not Enuf Trains!". Daily News. New York. Retrieved March 20, 2010.[permanent dead link]
  • ^ Mays, Jeff (April 21, 2015). "MAP: See How Much Subway Ridership Increased at Your Station". DNA Info. Archived from the original on April 23, 2015. Retrieved May 5, 2015.
  • ^ MTA Capital Program Milestones Report Archived July 16, 2012, at the Wayback Machine
  • ^ MTA/Siemens train-arrival sign
  • ^ "New BMT-IND Schedules" (PDF). The New York Division Bulletin. 46 (7). Electric Railroaders' Association: 20. July 2003.
  • ^ "L Train Shutdown to Begin on April 27". Spectrum News NY1 | New York City. October 30, 2018. Retrieved October 31, 2018.
  • ^ a b Fitzsimmons, Emma G.; Goldmacher, Shane (January 3, 2019). "Full Shutdown of L Train to Be Halted by Cuomo". The New York Times. ISSN 0362-4331. Retrieved January 3, 2019.
  • ^ Fitzsimmons, Emma G. (April 3, 2017). "M.T.A. Shortens L Train Shutdown to 15 Months". The New York Times. ISSN 0362-4331. Retrieved April 4, 2017.
  • ^ Wolfe, Jonathan (December 14, 2017). "New York Today: The Plan for the L Train Shutdown". The New York Times. ISSN 0362-4331. Retrieved December 16, 2017.
  • ^ "Governor Cuomo Announces Completion of Nation-Leading L Project Tunnel Rehabilitation With No Shutdown" (Press release). Albany, NY: New York State – Governor Andrew M. Cuomo. April 26, 2020. Archived from the original on April 27, 2020. Retrieved April 27, 2020.
  • ^ "Cuomo Announces That the L Train Will Reopen". The New York Times. April 26, 2020. ISSN 0362-4331. Retrieved April 27, 2020.
  • ^ "Subway Service Guide" (PDF). Metropolitan Transportation Authority. September 2019. Retrieved September 22, 2019.
  • edit

    Retrieved from "https://en.wikipedia.org/w/index.php?title=L_(New_York_City_Subway_service)&oldid=1232606882"
     



    Last edited on 4 July 2024, at 16:29  





    Languages

     


    Català
    Deutsch
    Español
    Français

    Italiano
    עברית
    Lombard
    Nederlands

    Norsk bokmål
    Polski
    Português
    Русский
    Suomi

     

    Wikipedia


    This page was last edited on 4 July 2024, at 16:29 (UTC).

    Content is available under CC BY-SA 4.0 unless otherwise noted.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Terms of Use

    Desktop