Home  

Random  

Nearby  



Log in  



Settings  



Donate  



About Wikipedia  

Disclaimers  



Wikipedia





North American Electric Reliability Corporation





Article  

Talk  



Language  

Watch  

Edit  





The North American Electric Reliability Corporation (NERC) is a nonprofit corporation based in Atlanta, Georgia, and formed on March 28, 2006, as the successor to the North American Electric Reliability Council (also known as NERC). The original NERC was formed on June 1, 1968, by the electric utility industry to promote the reliability and adequacy of bulk power transmission in the electric utility systems of North America. NERC's mission states that it "is to assure the effective and efficient reduction of risks to the reliability and security of the grid".[4]

North American Electric Reliability Corporation
AbbreviationNERC
FormationMarch 28, 2006 (2006-03-28)
Founded atAtlanta, Georgia
TypeNonprofit corporation

Tax ID no.

20-4821888
Legal status501(c)(6)
PurposeTo ensure the reliability of the bulk power system in North America, including the continental United States and Canada, and the northern portion of Baja California, Mexico.
HeadquartersAtlanta, Georgia, U.S.
Coordinates33°50′51N 84°22′00W / 33.847404°N 84.366719°W / 33.847404; -84.366719

Region

Contiguous United States, Canada and a portion of Baja CaliforniainMexico

Membership (2015)

1,900+[1]

President & CEO

Jim Robb

Senior Vice President

Mark Lauby

Sr. VP, CFO, & Treasurer

(Vacant)

Sr. VP & CSO

Bill Lawrence

Board of directors

  • Roy Thilly (Chair)
  • Janice B. Case (Vice Chair)
  • Jim Robb
  • Robert G. Clarke
  • Kenneth W. DeFontes Jr.
  • Frederick W. Gorbet
  • David Goulding
  • George S. Hawkins
  • Suzanne Keenan
  • Robin E. Manning
  • Jan Schori
  • Colleen Sidford
  • Subsidiaries
  • Midwest Reliability Organization (MRO)
  • SERC Reliability Corporation (SERC)
  • ReliabilityFirst (RF)
  • Texas Reliability Entity (Texas RE)
  • Western Electricity Coordinating Council (WECC)
  • Budget (2015)

    Increase $66.6 million[2]

    Staff (2015)

    198[3]
    Websitewww.nerc.com Edit this at Wikidata

    Formerly called

    North American Electric Reliability Council

    NERC oversees six regional reliability entities and encompasses all of the interconnected power systemsofCanada and the contiguous United States, as well as a portion of the Mexican state of Baja California.

    NERC's major responsibilities include working with all stakeholders to develop standards for power system operation, monitoring and enforcing compliance with those standards, assessing resource adequacy, and providing educational and training resources as part of an accreditation program to ensure power system operators remain qualified and proficient. NERC also investigates and analyzes the causes of significant power system disturbances in order to help prevent future events.

    NERC's standards for generating resources require that sufficient generating capacity be provided such that customers will need to be disconnected less often than once every ten years.[5] These standards are mandatory for only some of the regional entities.[5]

    Origins

    edit

    Originally formed as a voluntary organization in 1968 by the electricity industry and called the National Electric Reliability Council, the name was changed to include "North American" in place of "National" in 1981 in recognition of Canada's participation and the broader scope of NERC's footprint. The name was changed from "Council" to "Corporation" in 2007.

    In 2000, NERC established the Electricity Sector Information Sharing and Analysis Center, which provides industry with timely responses and alerts on cyber and physical security threats that have the potential to impact the bulk power system. The ES-ISAC, which changed its name in 2015 to Electricity Information Sharing and Analysis Center, shares timely information with industry through its secure web portal.

    In August 2003, North America experienced its worst blackout to date, as 50 million people lost power in the Northeastern and Midwestern United States and Ontario, Canada. A United States–Canada Power System Outage Task Force was formed to investigate the causes of the blackout and to make recommendations to prevent future blackouts.

    The Energy Policy Act of 2005 (US) called for the creation of an Electric Reliability Organization (ERO) to develop and enforce compliance with mandatory reliability standards in the United States. This non-governmental, "self-regulatory organization" was created in recognition of the interconnected and international nature of the bulk power grid.

    In April 2006, NERC applied for and was granted the designation of the ERO by FERC in July 2006. NERC also filed the first set of mandatory Reliability Standards with FERC, as well as filing the same information with the Canadian provincial authorities in Alberta, British Columbia, Manitoba, New Brunswick, Nova Scotia, Ontario, Quebec, Saskatchewan, and with the National Energy Board of Canada.

    About NERC

    edit

    Electricity Information Sharing and Analysis Center

    edit

    NERC also operates the Electricity Information Sharing and Analysis Center (E-ISAC). E-ISAC offers security services to bulk power system owners and operators across North America. E-ISAC services includes specific cyber and physical security threat intelligence, tailored cyber security knowledge and physical security collaboration. The E-ISAC, which NERC established at the request of the U.S. Department of Energy, works closely with NERC's Bulk Power System Awareness team in Atlanta to monitor real-time cyber and physical security threats to the grid.

    The E-ISAC, through capabilities including its Cybersecurity Risk Information Sharing Program (CRISP), works with critical asset owners and operators to analyze real-time cyber and physical security data for patterns of incidents with the potential to affect the bulk power system. NERC has a "firewall" separating the E-ISAC and NERC's compliance and enforcement activities. The separation extends to a physical separation of the E-ISAC from the rest of NERC.

    Interconnections and regional entities

    edit
     
    The electrical grids of the contiguous United States consists of 190,000 kilometres (120,000 mi) of lines operated by 500 companies.

    Interconnections

    edit

    Regional entities

    edit

    NERC authority

    edit

    As part of the fallout of the Northeast Blackout of 2003, the Energy Policy Act of 2005 authorized the Federal Energy Regulatory Commission (FERC) to designate a national Electric Reliability Organization (ERO). On July 20, 2006, FERC issued an order certifying NERC as the ERO for the United States.

    In September 2018, the Federal Energy Regulatory Commission (FERC) and NERC opened a joint investigation into a "winter load event" earlier in January that stressed the electrical grids in the Midwest. On January 17, Midwest and U.S. south central grid operators ordered emergency appeals for electricity conservation. This was due to high power demand caused by cold weather.[6]

    See also

    edit

    References

    edit
    1. ^ "NERC Membership List". North American Electric Reliability Corporation. 2015. Retrieved 29 October 2015.
  • ^ "2015 NERC Budget" (PDF). NERC. 13 August 2014. p. 7. Retrieved 29 October 2015.
  • ^ "NERC Staff" (PDF). NERC Roster. North American Electric Reliability Corporation. 9 October 2015. pp. 44–65. Retrieved 30 October 2015.
  • ^ "NERC". Retrieved June 22, 2023.
  • ^ a b Loehr, George C. (August 16, 2021). "Federal Standards Should Also Apply to PNM Merger". Albuquerque Journal (Albuquerque, New Mexico). p. A9.
  • ^ Bade, Gavin (2018-09-13). "FERC, NERC Open Inquiry into Winter Load Event that Stressed Midwest Grids". Utility Dive. Retrieved 2018-09-13.
  • edit

    Retrieved from "https://en.wikipedia.org/w/index.php?title=North_American_Electric_Reliability_Corporation&oldid=1190599293"
     



    Last edited on 18 December 2023, at 20:35  





    Languages

     


    Deutsch
    فارسی
    Français
     

    Wikipedia


    This page was last edited on 18 December 2023, at 20:35 (UTC).

    Content is available under CC BY-SA 4.0 unless otherwise noted.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Terms of Use

    Desktop