This article needs additional citations for verification. Please help improve this articlebyadding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Port Klang Komuter station" – news · newspapers · books · scholar · JSTOR (September 2021) (Learn how and when to remove this message) |
The Port Klang Komuter station is a train station in Port Klang, Selangor, Malaysia, operated by KTM Komuter. It is the western terminus, and name sake, of the Port Klang Line.
KD19 ![]() | |||||||||||
![]() | |||||||||||
General information | |||||||||||
Other names | Malay: Pelabuhan Klang Chinese: 巴生港口 Tamil: கிள்ளான் துறைமுகம் | ||||||||||
Location | Port Klang, Selangor, Malaysia. | ||||||||||
Owned by | Keretapi Tanah Melayu | ||||||||||
Line(s) | Port Klang Branch | ||||||||||
Platforms | 1side platform &1island platform | ||||||||||
Tracks | 3 | ||||||||||
Construction | |||||||||||
Parking | Not available in close proximity of the station, but ample parking space is available outside of the station | ||||||||||
Bicycle facilities | No | ||||||||||
Other information | |||||||||||
Station code | KD19 | ||||||||||
History | |||||||||||
Opened | 1995 | ||||||||||
Services | |||||||||||
| |||||||||||
The South Port cruise ship terminal, Port Klang Immigration Centre and the Pulau Ketam ferry terminal are located a walking distance from this station.
Many primary and secondary schools are located in the proximity, and because of that, this station can get packed during the mornings and evenings.
The station is connected to an 11.2 km single line track which terminates at Westport. The railway track – which uses block train to carry logistics – began operations on 9 December 1998.[1]
2°59′57″N 101°23′30″E / 2.99917°N 101.39167°E / 2.99917; 101.39167
This Malaysian railroad station-related article is a stub. You can help Wikipedia by expanding it. |