Home  

Random  

Nearby  



Log in  



Settings  



Donate  



About Wikipedia  

Disclaimers  



Wikipedia





Risk management plan





Article  

Talk  



Language  

Watch  

Edit  





Arisk management plan is a document that a project manager prepares to foresee risks, estimate impacts, and define responses to risks. It also contains a risk assessment matrix. According to the Project Management Institute, a risk management plan is a "component of the project, program, or portfolio management plan that describes how risk management activities will be structured and performed".[1]

Moreover, according to the Project Management Institute, a risk is "an uncertain event or condition that, if it occurs, has a positive or negative effect on a project's objectives".[1] Risk is inherent with any project, and project managers should assess risks continually and develop plans to address them. The risk management plan contains an analysis of likely risks with both high and low impact, as well as mitigation strategies to help the project avoid being derailed should common problems arise. Risk management plans should be periodically reviewed by the project team to avoid having the analysis become stale and not reflective of actual potential project risks.

Risk response

edit

Broadly, there are four potential responses to risk with numerous variations on the specific terms used to name these response options:[2][3]

(Mnemonic: SARA, for Share Avoid Reduce Accept, or A-CAT, for "Avoid, Control, Accept, or Transfer")

Risk management plans often include matrices.

Examples

edit

The United States Department of Defense, as part of acquisition, uses risk management planning that may have a Risk Management Plan document for the specific project. The general intent of the RMP in this context is to define the scope of risks to be tracked and means of documenting reports. It is also desired that there would be an integrated relationship to other processes. An example of this would be explaining which developmental tests verify risks of the design type were minimized are stated as part of the test and evaluation master plan. A further example would be instructions from 5000.2D[4] that for programs that are part of a system of systems the risk management strategy shall specifically address integration and interoperability as a risk area. The RMP specific process and templates shift over time (e.g. the disappearance of 2002 documents Defense Finance and Accounting Service / System Risk Management Plan, and the SPAWAR Risk Management Process).

See also

edit

Citations

edit
  1. ^ a b Project Management Institute 2021, Glossary §3 Definitions.
  • ^ Special Publication 800-37 RISK MANAGEMENT FRAMEWORK FOR INFORMATION SYSTEMS AND ORGANIZATIONS (revision 2 draft ed.). National Institute of Science and Technology. May 2018.
  • ^ CRISC Review Manual (6th ed.). ISACA. 2015. ISBN 978-1-60420-371-4.
  • ^ SECNAVINST 5000.2D 3.4.4.1
  • References

    edit
    edit

    Retrieved from "https://en.wikipedia.org/w/index.php?title=Risk_management_plan&oldid=1206253261"
     



    Last edited on 11 February 2024, at 17:00  





    Languages

     


    العربية
     

    Wikipedia


    This page was last edited on 11 February 2024, at 17:00 (UTC).

    Content is available under CC BY-SA 4.0 unless otherwise noted.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Terms of Use

    Desktop