The Shoshone Project is an irrigation project in the U.S. stateofWyoming. The project provides irrigation for approximately 107,000 acres (430 km2) of crops in the Big Horn Basin, fulfilling the vision of local resident and developer Buffalo Bill Cody, who hoped to make the semi-arid basin into agricultural land. Buffalo Bill Dam on the Shoshone River impounds water for the project in Buffalo Bill Reservoir. In addition to its role in irrigation, the project provides flood control on the Shoshone and generates power, using the 350-foot (110 m) height of Buffalo Bill Dam, once a world record, and the considerable fall of the river through Shoshone Canyon to generate hydroelectric power. Chief crops in the Big Horn Basin are sugar beets, alfalfa, barley, oats, corn and beans.

Buffalo Bill Dam with Shoshone Powerplant at right

Establishment

edit

At the end of the 19th century Buffalo Bill Cody settled in his namesake town of Cody, Wyoming, buying much of the surrounding lands. Cody promoted a plan to use the waters of the Shoshone to irrigate the plains of the Bighorn Basin extending eastward from Cody. Franklin Wheeler Mondell, later U.S. Senator from Wyoming, filed for the first water rights in 1893 but was unable to follow up on his project. Cody and his partner Nate Salsbury obtained a permit to irrigate 120,000 acres (49,000 ha) using three canals, but were in turn unable to construct the necessary infrastructure. Cody and local promoters again obtained water rights to irrigate 60,000 acres (24,000 ha) from the state of Wyoming in 1899 and attempted to build a private canal, but lacked sufficient resources. Following the passage of the Reclamation Act in 1902 the state urged the Department of Interior to take over the project. The federal government-backed Shoshone Project was authorized in 1904 by Secretary of the Interior Ethan Allen Hitchcock, based on the 1899 Cody-Salsbury permit. The project started the same year, administered by the Bureau of Reclamation. Work on Buffalo Bill Dam started in 1905. The small Ralston and Corbett dams were completed in 1908. Buffalo Bill Dam (known as Shoshone Dam until 1946) was completed in 1910 at a cost of $1.4 million, at a height of 325 feet (99 m), then the tallest dam in the world. The dam's height was extended by another 25 feet (7.6 m) to 350 feet (110 m) in the 1980s, significantly expanding reservoir capacity.[1][2]

Land was opened for settlement near Powell in the Garland Division, with extensive agricultural development by 1918. The Frannie Division was opened at about this time. The Willwood Division was opened to development between 1927 and 1938, while the Heart Mountain Division was not opened until 1947.[1][2]

Administration

edit

The project is administered in four divisions:

Power generation

edit

Waters impounded by Buffalo Bill Dam operate four power plants, two close to the dam's base and two others operated by water piped from the dam, taking advantage of the height change through Shoshone Canyon to place the power stations in the flats beyond the mountain canyon. The original powerplant, the Shoshone Powerplant, and what was initially intended to be a temporary Heart Mountain Powerplant, were supplemented and upgraded with the dam's increase in height from 1986 to 1994.

 
Shoshone Powerplant from the top of Buffalo Bill Dam

References

edit
  1. ^ a b c d "Shoshone Project History". U.S. Bureau of Reclamation. Retrieved 6 May 2011.
  • ^ a b c d e f "Shoshone Project". U.S. Bureau of Reclamation. Archived from the original on 4 March 2016. Retrieved 6 May 2011.
  • ^ Startin, Bryant. "A Little History of the Shoshone Irrigation District". Shoshone Irrigation District. Retrieved 6 May 2011.
  • ^ "Shoshone Powerplant". U.S. Bureau of Reclamation. Retrieved 6 May 2011.
  • ^ "Buffalo Bill Powerplant". U.S. Bureau of Reclamation. Retrieved 6 May 2011.
  • ^ "Heart Mountain Powerplant". U.S. Bureau of Reclamation. Retrieved 6 May 2011.
  • ^ "Spirit Mountain Powerplant". U.S. Bureau of Reclamation. Retrieved 6 May 2011.
  • edit

    Retrieved from "https://en.wikipedia.org/w/index.php?title=Shoshone_Project&oldid=1171763729"
     



    Last edited on 23 August 2023, at 02:25  





    Languages

     



    This page is not available in other languages.
     

    Wikipedia


    This page was last edited on 23 August 2023, at 02:25 (UTC).

    Content is available under CC BY-SA 4.0 unless otherwise noted.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Terms of Use

    Desktop