Home  

Random  

Nearby  



Log in  



Settings  



Donate  



About Wikipedia  

Disclaimers  



Wikipedia





Uri Dam





Article  

Talk  



Language  

Watch  

Edit  





Uri Dam is a 480 MW hydroelectric power station on the Jhelum River near UriinBaramula district of the Jammu and Kashmir, India. It is located very near to the Line of Control, the de facto border between India and Pakistan.[1] The station is largely built under a hill with a 10 km tunnel. It is of the run-of-the-river type without a large dam, since the Indus Waters Treaty gives Pakistan the exclusive right to regulate the Jhelum River.[2] On 4 July 2014 a 240 MW Uri-II power project which is a new project located just downstream of Uri I, was inaugurated.[3]

Uri Dam
CountryIndia
Opening date1997

Construction

edit

The project was awarded by the National Hydroelectric Power Corporation in October 1989 to a European consortium called Uri Civil led by Swedish Skanska and including Swedish NCC and ABB and British Kvaerner Boving.[4] It was partially funded by the Swedish and British governments.[5] The workforce included about 200 foreigners and 4,000 Indians, many from the local area.[2][6][7] This together with shelling across the border and unrest related to the burning of Charari Sharief and the siege of Hazratbal Shrine led to an 18-month delay.[1]

The project cost about Rs. 33 billion (about 450 million EUR or US$660 million) and was completed in 1997.[1]

Operation

edit

The station is operated by the NHPC. Plans to expand it with a 250 MW Uri-II plant were announced in 1998. The government of Pakistan has objected to this, saying it violates the Indus Waters Treaty.[8][9] On 4 July 2014 a 240 MW Uri-II power project which is a new project located just downstream of Uri I, was inaugurated.[10]

References

edit
  1. ^ a b c Pranjal Sharma (21 October 1998). "Uri's Little Europe builds an Indian dream". The Indian Express. Retrieved 26 November 2009.
  • ^ a b "Uri project a boon to J-K". The Tribune. 20 October 1998. Retrieved 26 November 2009.
  • ^ "Modi inaugurates 240 MW Uri-II power project in Kashmir superb". IANS. news.biharprabha.com. Retrieved 5 July 2014.
  • ^ Qazi, S. A. (2005). Systematic geography of Jammu and Kashmir. New Delhi: APH Publishing. pp. 97–98. ISBN 81-7648-786-4. Retrieved 26 November 2009.
  • ^ "Uri Hydro-Electric Project, India: Evaluation of the Swedish Support" (PDF). Retrieved 23 November 2018.
  • ^ K. Santhanam (2003). Jihadis in Jammu and Kashmir: a portrait gallery. SAGE. pp. 241–242. ISBN 0-7619-9785-7. Retrieved 27 November 2009.
  • ^ Sveriges Radio P3 Dokumentär: Kidnappningen i Kashmir by Fredrik Johnsson and Kristofer Hansson. First broadcast on 7 December 2008. Radio documentary with interviews.
  • ^ "Uri-II Project". NHPC website. Retrieved 27 November 2009.
  • ^ Gopal Sharma (28 June 2007). "Pakistan now objects to 250-Mw Uri hydel project". Business Standard. Retrieved 27 November 2009.
  • ^ "Modi inaugurates 240 MW Uri-II power project in Kashmir". The Biharprabha News. Retrieved 28 August 2019.
  • edit

  •  Water portal
  •  Renewable energy portal
  • 34°08′40N 74°11′08E / 34.1444°N 74.18545°E / 34.1444; 74.18545


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Uri_Dam&oldid=1142135768"
     



    Last edited on 28 February 2023, at 18:25  





    Languages

     


    Deutsch
     

    Wikipedia


    This page was last edited on 28 February 2023, at 18:25 (UTC).

    Content is available under CC BY-SA 4.0 unless otherwise noted.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Terms of Use

    Desktop