Wardha–Yavatmal–Nanded line is an under-construction railway project based in Maharashtra, India. The railway line would facilitate the transport between WardhatoNanded via Yavatmal. The Ministry of Railways, Government of India has given the project a "special project" status. The railway line would operate on a geographical area of 284 kilometers.[1][2]

Wardha–Yavatmal–Nanded line
Overview
StatusActive
Termini
  • Hazur Sahib Nanded railway station
  • Technical
    Line length284 km (176 mi)
    Track gauge5 ft 6 in (1,676 mm) broad gauge
    ElectrificationYes
    Operating speed130 Km/Hr

    Wardha–Yavatmal–Nanded line map

    km

    Nagpur–Bhusawal section

    3
    Sewagram Junction

    Nagpur–Hyderabad line

    0
    Wardha Junction

    Nagpur–Bhusawal section

    15
    Deoli

    27
    Bhidi

    43
    Kalamb

    Talegaon

    66
    Yavatmal

    78
    Lasina

    85
    Ling

    90
    Ladkhed

    96
    Tapona

    107
    Darwha Moti Bagh Junction

    Nagpur–Bhusawal section

    Antargaon

    Harsul

    Digras

    Belgavhan

    174
    Pusad

    Shilona

    Palsa

    209
    Umarkhed

    Hadgaon

    Bamni

    Waranga

    Devwadi

    260
    Ardhapur

    Secunderabad–Manmad line

    275
    Maltekdi

    278
    Hazur Sahib Nanded

    Secunderabad–Manmad line
    km
    Source: IndiaRailInfo

    History

    edit

    Land acquisition

    edit

    The length of the line is 284 km and it needs 722 hectares of land. The Government of Maharashtra has approved the acquisition of 722 hectares of land. Around 90% of the land required for the Wardha–Yavatmal–Nanded broad-gauge railway line has been acquired and now Government of Maharashtra will request the Ministry of Railways to start the tender process. [3] Land acquisition was completed in 2018.[4]

    Construction

    edit

    Tender for all patches were granted in Feb 2019 and construction is already underway on several patches. 77 km Wardha–Yavatmal section was granted to the Construction Organisation of Central Railway zone, and 207 km Yavatmal–Nanded section was granted to Rail Vikas Nigam (RVNL). As of Feb 2019, earth works, all bridges (2 major bridges on Yashoda river and Bhindi River and 26 minor bridges), and at least 54 railway under bridge (RuB) have been completed. There will be six tunnels totalling 9.8 km, most challenging being a 2.5 km tunnel through a hillock behind Yavatmal Airport. Contracts for all station buildings have been awarded by Feb 2019 and construction has commenced.[5]

    Initial work on Yavatmal new railway station started. It will be constructed behind Z.P school Arni road Yavatmal.[6] Some Station Work are Supposed To be Completed in 2024.Wardha to Kalamb(Kamathwada) Track Construction is Complete Soon At end of this Year(2023).

    Cost

    edit

    Revised total project cost is of 284 km new line project is INR3168.29 crores.[5] According to 2019–20 Pink Book, allocation for that financial year was INR350 crore, since the construction work is already underway and this should help complete a few sections faster.[7]

    Route

    edit

    Following stations have been planned on the route (partial list, please help expand between Yavatmal to Nanded):[5]

    Scope

    edit

    The railway line would operate in six tehsils and 90 villages in Wardha, Yavatmal, Washim, Hingoli and Nanded district of Maharashtra, India.[8] When the line is commissioned it will provide direct connectivity between Nagpur and other districts in Vidarbha region and Marathwada region.

    The broad gauge Metro will also run on this route.[citation needed]

    First Successful Trial Run Done Between Wardha To Deoli On 31 Aug 2023.another section Bhidi-Kalamb, a distance of 15 km from Deoli, is planned to be completed. Similar to exercise in Kalamb, the CRS would come down to inspect the new route and certify it for opening of passenger rail services.

    Prime Minister Narendra Modi will inaugurate multiple rail projects worth more than Rs 1,300 crore in Maharashtra on February 28 in Yavatmal.

    The key projects include the Wardha-Kalamb broad gauge line (part of Wardha-Yavatmal-Nanded new broad gauge line project).The Hounrable Prime minister Virtually flag off the new passenger train service from Wardha to Kalamb by Video Conferencing.

    Introduction of New passenger Train Service

    Ministry of Railways approved introduction of 51119/20 Wardha Kalamb Passenger to the following abstract timings

    51119 Wardha Kalamb Passenger Start from Wardha 08:00 Am nd reached Kalamb 09:10 Am.

    51120 Kalamb Wardha Passenger start from Kalamb 10:00Am nd reached wardha 11:10 Am.

    Commercial Stoppage : Deoli, Bhidi.

    Days of Operation : 5 Days a week(Expect Sunday And Wednesday)

    Composition : GS 08 + SLRD 02= 10 Coaches.



    See also

    edit

    References

    edit
    1. ^ "Wardha–Nanded rail line project gets special status".
  • ^ "Land acquisition for new rail line in Yavatmal fast-tracked". 10 April 2017.
  • ^ "Work will start soon". The Times of India.
  • ^ Land acquisition for new rail line in Yavatmal fast-tracked
  • ^ a b c CR to lay track on Wardha–Nanded route
  • ^ "Work Started".
  • ^ No new railway projects but ongoing ones get fund boost
  • ^ "Wardha–Nanded rail line project gets special status". Business Standard India. Press Trust of India. 22 July 2016.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Wardha–Nanded_line&oldid=1214666235"
     



    Last edited on 20 March 2024, at 11:24  





    Languages

     



     

    Wikipedia


    This page was last edited on 20 March 2024, at 11:24 (UTC).

    Content is available under CC BY-SA 4.0 unless otherwise noted.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Terms of Use

    Desktop