mNo edit summary
Tags: Manual revert Visual edit Mobile edit Mobile web edit
|
Added more info
|
||
Line 7: | Line 7: | ||
| length_km = 1216 |
| length_km = 1216 |
||
| direction_a = East |
| direction_a = East |
||
| terminus_a = [[ |
| terminus_a = [[Algeria-Tunisia border]] |
||
| junction = |
| junction = |
||
| direction_b = West |
| direction_b = West |
||
| terminus_b = [[Maghnia]] |
| terminus_b = [[Maghnia]] |
||
| cities = [[Constantine, Algeria|Constantine]], [[Setif]], [[Algiers]], [[Blida]], [[Oran]], [[Tlemcen]] |
| cities = [[Constantine, Algeria|Constantine]], [[Setif]], [[Algiers]], [[Blida]], [[Oran]], [[Tlemcen]], [[El Taref]] |
||
| established = 2007 |
| established = March 2007 |
||
| history = Completed as of {{start date and age|August 2023}} |
| history = Completed as of {{start date and age|August 2023}} |
||
}} |
}} |
||
The '''East-West Highway''' ({{lang-ar|الطريق السيار شرق-غرب}}), also referred to as the '''A1 Highway''', is a motorway in [[Algeria]]. The project of a six-lane [[highway]] across Algeria was launched in 2007, and is |
The '''East-West Highway''' ({{lang-ar|الطريق السيار شرق-غرب}}), also referred to as the '''A1 Highway''', is a motorway in [[Algeria]]. The project of a six-lane [[highway]] across Algeria was launched in 2007, it was finished in August 2023 after 17 years of construction <ref>{{Cite web |date=2023-08-14 |title=Algérie: après 17 années de travaux, l'autoroute Est-Ouest est enfin terminée |url=https://www.rfi.fr/fr/afrique/20230814-alg%C3%A9rie-apr%C3%A8s-17-ann%C3%A9es-de-travaux-l-autoroute-est-ouest-est-enfin-termin%C3%A9e |access-date=2024-05-01 |website=RFI |language=fr}}</ref> and is considered to be one of the largest public works projects in the world.<ref>{{cite web|url=http://www.roadtraffic-technology.com/projects/eastwesthighway/|accessdate=2010-11-09|title=East-West Highway - Road Traffic Technology| archiveurl= https://web.archive.org/web/20101008212542/http://www.roadtraffic-technology.com/projects/eastwesthighway/| archivedate= 8 October 2010 | url-status= live}}</ref> |
||
The US$11 billion project |
The US$11 billion project was undertaken by a complex consortium of international suppliers, and there have been concerns about [[corruption]] and long delays.<ref>{{cite web|url=http://www.africa-asia-confidential.com/article-preview/id/368/East-West-Highway-to-trouble|accessdate=2010-11-09|title=East-West Highway to trouble|publisher=Africa-Asia Confidential|archive-url=https://web.archive.org/web/20101127010728/http://www.africa-asia-confidential.com/article-preview/id/368/East-West-Highway-to-trouble|archive-date=2010-11-27|url-status=dead}}</ref><ref>{{cite web|url=http://www.echoroukonline.com/eng/algeria/10708-delayed-development-projects-cost-algeria-a-loss-of-10-5-billion-dollars.html|accessdate=2010-11-09|title=Echorouk Online - Delayed development projects cost Algeria a loss of 10.5 billion dollars|archive-url=https://web.archive.org/web/20110724173701/http://www.echoroukonline.com/eng/algeria/10708-delayed-development-projects-cost-algeria-a-loss-of-10-5-billion-dollars.html|archive-date=2011-07-24|url-status=dead}}</ref> The Central and Western sections of the road were built by a consortium of [[China Railway Construction Corporation]] and [[CITIC]] while the Eastern section was constructed by a Japanese consortium of Kajima Corporation, Nishimatsu Construction Company, Itochu Corporation, Hazama Corporation and Taisei Corporation.<ref name=contractor>{{cite news|title=East-West Highway, Algeria|url=http://www.roadtraffic-technology.com/projects/eastwesthighway/|agency=Road Traffic Technology}}</ref> |
||
==Route== |
==Route== |
||
[[File:TUNNEL AUTOROUTE EST OUEST 3.jpg|thumb|left|Tunnel (2015)]] |
[[File:TUNNEL AUTOROUTE EST OUEST 3.jpg|thumb|left|Tunnel (2015)]] |
||
|
The highway runs through {{convert|1216|km|mi|abbr=on}} starting from the [[Morocco|Moroccan]] border and ending at the [[Tunisia]]n<ref>{{Cite web |title=El Tarf: the opening of the section of the East-West highway and its fruitful socio-economic impact |url=https://www.aps.dz/regions/164638-el-tarf-l-ouverture-de-l-ultime-troncon-de-l-autoroute-est-ouest-et-ses-fructueux-rejaillissements-socioeconomiques}}</ref> border, connecting Algeria's major coastal cities.<ref>{{cite web|url=http://www.basf-cc.ae/en/News2/Pages/Algeria.aspx|accessdate=2010-11-09|title=Construction of East West Highway in Algeria|date=2010-11-09|archive-url=https://web.archive.org/web/20101002114629/http://www.basf-cc.ae/en/News2/Pages/Algeria.aspx|archive-date=2010-10-02|url-status=dead}}</ref> Other hub roads are under construction as well, thus providing a link to other important cities of the inner part of the country. |
||
The East-West highway was the first stage of Algeria's five-year plan, which included spending US$40.9 billion on modernization of road networks and increasing ports' capacity. |
The East-West highway was the first stage of Algeria's five-year plan, which included spending US$40.9 billion on modernization of road networks and increasing ports' capacity. |
||
== Origin & History == |
|||
=== Pre-Construction Phase === |
|||
The motorway was envisioned in the 1970s by the then planning ministry alongside other mega-projects. |
|||
Studies on the motorway began as early as 1983, analysts considered factors such as [[Climate of Algeria|climate]], [[Geography of Algeria|topography]] and many socio-economic impacts on the urban centers which the motorway would pass through. Eventually, in June of 1987, the project was parliamentary approved. |
|||
==== Funding and early construction ==== |
|||
In the early stages of the project, it would be funded by European, Arab and African loans. |
|||
On June 18th, 1990 the [[European Investment Bank|EIB (European Investment Bank)]] granted the first loan of 40 million euros<ref>{{Cite web |title=AUTOROUTE EST-OUEST |url=https://archive.wikiwix.com/cache/index2.php?rev_t=20150923000000&url=http://www.eib.org/projects/loans/1990/19902002.htm#federation=archive.wikiwix.com&tab=url |access-date=2024-05-01 |website=archive.wikiwix.com}}</ref> for the first section between [[El Affroun]] and [[Blida]]. A year later, in 1991, the same bank granted a 31 million euro loan for the bypass section near [[Bouïra|Bouira]] <ref>{{Cite web |title=AUTOROUTE EST-OUEST II (BOUIRA) |url=https://archive.wikiwix.com/cache/index2.php?rev_t=20150923000000&url=http://www.eib.org/projects/loans/1991/19912032.htm#federation=archive.wikiwix.com&tab=url |access-date=2024-05-01 |website=archive.wikiwix.com}}</ref>. Between 1993-1994 a total of 100 million euros were loaned for the [[Lakhdaria]]-Bouira section of the A1 highway. The same bank continued to grant loans of up to 210 million euros up until 2002 for several portions of the highway, but there were no direct connections between these sections except for the already existing [[:fr:Route_nationale_4_(Algérie)|RN-4]]. |
|||
On October 3, 1995 , a 30 <abbr>km</abbr> section between El Affroun and [[Hoceinia]] ( Ain Defla ) is inaugurated. 7 years later, the [[Arab Fund for Economic and Social Development]] (FADES) granted a loan of 86 million dollars for the completion of the section, of which only 30% would be used for its implementation.<ref>{{Cite web |date=2014-02-13 |title=Implementing Health Reform: A January Exchange Enrollment Report (Page 80) |url=http://dx.doi.org/10.1377/forefront.20140213.037208 |access-date=2024-05-01 |website=Forefront Group}}</ref> |
|||
Between 1996 and 2002, the [[African Development Bank]] granted a loan of $161 million for the completion of the Constantine city bypass and <abbr>the 29 km section</abbr><ref>{{Cite web |title=Presidential Decree n o 03-328 of October 6, 2003 MINISTRY OF FINANCE JO N o 60 of October 8, 2003, Page 4 Approving loan agreement No. 2000 110000013 signed on June 2, 2003 in Addis Ababa between the People's Democratic Republic of Algeria and the African Development Bank for the financing of the motorway bypass project of Constantine - Phase II (Aïn El Bey section - CW 133) |url=https://www.joradp.dz/Jo2000/2003/060/FP4.pdf}}</ref> between [[Aïn Smara|Ain Smara]] and [[El Meridj]]. |
|||
==== State funding ==== |
|||
In February 2005 , almost a year after his re-election, [[Hirak (Algeria)|Former]] [[Abdelaziz Bouteflika|President Abdelaziz Bouteflika]] announced that the financing of all of the remaining sections from the public treasury would be provided for by the government's treasury, ignoring the advice of his finance minister <ref>Excerpt, "He announces, after listening to one point of the situation, his decision to have the entire remaining 900 km of the East-West highway financed by the Public Treasury" - Abdelatif Benachenhou - "Return to a broken destiny" - El Kadi Ihsane - in El Watan on 05-09-2005</ref>. |
|||
On July 25th, 2005 , an executive decree is published to enforce the decision and to grant the funding necessary for the remaining sections of the motorway. |
|||
The limited international [[Invitation to tender|call for tenders]] , including precise specifications due to the sheer scale of the the East-West highway project was launched on July 23, 2005 . Several responses were recorded (American, French, German and Portuguese). Ultimately, two consortia were selected: the Chinese CITIC-CRCC and the Japanese COJAAL. The results were announced on April 15th, 2006 and the production contracts were signed on September 18th in the same year. |
|||
==== Project managers ==== |
|||
While the highway was owned by the state, another call for tenders was released for the management of the construction itself, the winners were as following: |
|||
* the Canadian design office “Dessau Soprane” for control and monitoring over the entire project. |
|||
* the French design office “Egis-Route” for the western sector. |
|||
* the Canadian design office [[AtkinsRéalis|SNC Lavalin]] for the central sector. |
|||
* the Italian group "ANAS Italconsult INCO" for the eastern sector. |
|||
=== Construction (2008-2023) === |
|||
Although the main east-west highway project started in 2006, several sections already existed. The new sections were to be delivered scattered throughout the following decade. |
|||
The western and central sections, carried out by the Chinese group CITIC-CRCC, were inaugurated and completed during the early 2010s, but the work on the eastern section would not be completed up until 2016, which carried out by the Japanese group COJAAL. Technical problems as well as Cojaal's inability to carry out this type of infrastructure would be used to explain this delay. |
|||
A corruption scandal surfaced in 2010 , and alleged outside sources reported on the quality of the work carried out by CITIC-CRCC , and it was considered non-compliant with international standards as repair work and maintenance were already necessary as early as 2013 <ref>{{Cite web |title=Ali Idir, “Delivery of the entire East-West highway not before 2016” |url=http://www.tsa-algerie.com/actualite/item/1146-la-livraison-de-la-totalite-de-l-autoroute-est-ouest-pas-avant-2016 |url-status=live |access-date=2013-09-05}}</ref>. |
|||
The project was completed on August 12th, 2023. |
|||
==References== |
==References== |
A1 autoroute | |
---|---|
![]() | |
![]() | |
Route information | |
Length | 1,216 km (756 mi) |
Existed | March 2007–present |
History | Completed as of August 2023; 11 months ago (August 2023) |
Major junctions | |
East end | Algeria-Tunisia border |
West end | Maghnia |
Location | |
Country | Algeria |
Major cities | Constantine, Setif, Algiers, Blida, Oran, Tlemcen, El Taref |
Highway system | |
The East-West Highway (Arabic: الطريق السيار شرق-غرب), also referred to as the A1 Highway, is a motorway in Algeria. The project of a six-lane highway across Algeria was launched in 2007, it was finished in August 2023 after 17 years of construction [1] and is considered to be one of the largest public works projects in the world.[2]
The US$11 billion project was undertaken by a complex consortium of international suppliers, and there have been concerns about corruption and long delays.[3][4] The Central and Western sections of the road were built by a consortium of China Railway Construction Corporation and CITIC while the Eastern section was constructed by a Japanese consortium of Kajima Corporation, Nishimatsu Construction Company, Itochu Corporation, Hazama Corporation and Taisei Corporation.[5]
The highway runs through 1,216 km (756 mi) starting from the Moroccan border and ending at the Tunisian[6] border, connecting Algeria's major coastal cities.[7] Other hub roads are under construction as well, thus providing a link to other important cities of the inner part of the country. The East-West highway was the first stage of Algeria's five-year plan, which included spending US$40.9 billion on modernization of road networks and increasing ports' capacity.
The motorway was envisioned in the 1970s by the then planning ministry alongside other mega-projects.
Studies on the motorway began as early as 1983, analysts considered factors such as climate, topography and many socio-economic impacts on the urban centers which the motorway would pass through. Eventually, in June of 1987, the project was parliamentary approved.
In the early stages of the project, it would be funded by European, Arab and African loans.
On June 18th, 1990 the EIB (European Investment Bank) granted the first loan of 40 million euros[8] for the first section between El Affroun and Blida. A year later, in 1991, the same bank granted a 31 million euro loan for the bypass section near Bouira [9]. Between 1993-1994 a total of 100 million euros were loaned for the Lakhdaria-Bouira section of the A1 highway. The same bank continued to grant loans of up to 210 million euros up until 2002 for several portions of the highway, but there were no direct connections between these sections except for the already existing RN-4.
On October 3, 1995 , a 30 km section between El Affroun and Hoceinia ( Ain Defla ) is inaugurated. 7 years later, the Arab Fund for Economic and Social Development (FADES) granted a loan of 86 million dollars for the completion of the section, of which only 30% would be used for its implementation.[10]
Between 1996 and 2002, the African Development Bank granted a loan of $161 million for the completion of the Constantine city bypass and the 29 km section[11] between Ain Smara and El Meridj.
In February 2005 , almost a year after his re-election, Former President Abdelaziz Bouteflika announced that the financing of all of the remaining sections from the public treasury would be provided for by the government's treasury, ignoring the advice of his finance minister [12].
On July 25th, 2005 , an executive decree is published to enforce the decision and to grant the funding necessary for the remaining sections of the motorway.
The limited international call for tenders , including precise specifications due to the sheer scale of the the East-West highway project was launched on July 23, 2005 . Several responses were recorded (American, French, German and Portuguese). Ultimately, two consortia were selected: the Chinese CITIC-CRCC and the Japanese COJAAL. The results were announced on April 15th, 2006 and the production contracts were signed on September 18th in the same year.
While the highway was owned by the state, another call for tenders was released for the management of the construction itself, the winners were as following:
Although the main east-west highway project started in 2006, several sections already existed. The new sections were to be delivered scattered throughout the following decade.
The western and central sections, carried out by the Chinese group CITIC-CRCC, were inaugurated and completed during the early 2010s, but the work on the eastern section would not be completed up until 2016, which carried out by the Japanese group COJAAL. Technical problems as well as Cojaal's inability to carry out this type of infrastructure would be used to explain this delay.
A corruption scandal surfaced in 2010 , and alleged outside sources reported on the quality of the work carried out by CITIC-CRCC , and it was considered non-compliant with international standards as repair work and maintenance were already necessary as early as 2013 [13].
The project was completed on August 12th, 2023.
{{cite web}}
: CS1 maint: url-status (link)
| |
---|---|
1 Number Roads |
|
2 Number Roads |
|
3 Number Roads |
|
Under construction |
|
Ring Roads |
|
Regional |
|
Transcontinental |
|
List of Algeria national roads (fr) · List of Algeria Expressways (fr) · |
![]() | This Algerian road or road transport-related article is a stub. You can help Wikipedia by expanding it. |