|
m corrected formatting
|
||
Line 108: | Line 108: | ||
The first Nova-C mission, [[IM-1]], uses a lander named ''[[Odysseus (spacecraft)|Odysseus]]''.<ref name=odysseus /><ref name=mw-sc /> A contract for the mission was signed in 2021, with later modifications.<ref name ="contract_modifications"/> The mission launched 15 February 2024 on a [[Falcon 9]] launch vehicle and landed on the lunar surface with a "rough" - soft landing on 22 February 2024 at 6:24 p.m. EST in the South Pole region of the moon within approximately 1.5 km of the Malapert A crater.<ref name=NYT-20240222 /><ref name=il-lf /><ref name=nbc-td /><ref>[https://www.nasa.gov/missions/lro/nasas-lro-images-intuitive-machines-odysseus-lander/ NASA’s LRO Images Intuitive Machine’s Odysseus Lander] Nasa.gov. February 26, 2024. Retrieved February 26, 2424.</ref><ref name="mission_placement_and_duration">[https://qz.com/sideways-moon-landing-cuts-mission-short-private-us-lu-1851286363 Sideways moon landing cuts mission short, private US lunar lander will stop working Tuesday] Quartz/ qz.com. By Marcia Dunn. February 26, 2024. Retrieved February 26, 2024.</ref> Odysseus's "rough" - soft Moon landing is the first soft landing of any kind for an American made spacecraft since [[Apollo 17]], more than 50 years ago, and the first by a [[Private spaceflight|private company]].<ref name=ap-pl /><ref name=nxsf-im1 /> The soft Odysseus landing also qualifies the Odysseus mission as the first liquid methane and liquid oxygen ([[methalox]]) powered spacecraft to fire beyond low earth orbit, as well as the first methalox spacecraft to land on an off-world celestial body.<ref>[https://www.dropbox.com/scl/fi/bxegh13yo6p8f3nwxv83z/24-02-28-b-reply-from-steve-altemus.pdf?rlkey=48m09hfmv9hkv5lftd4f84bp5&dl=0 Intuitive Machines Press Release] Mindsviewpress. By Steve Altemus. February 28, 2024. Retrieved February 29, 2024.</ref> |
The first Nova-C mission, [[IM-1]], uses a lander named ''[[Odysseus (spacecraft)|Odysseus]]''.<ref name=odysseus /><ref name=mw-sc /> A contract for the mission was signed in 2021, with later modifications.<ref name ="contract_modifications"/> The mission launched 15 February 2024 on a [[Falcon 9]] launch vehicle and landed on the lunar surface with a "rough" - soft landing on 22 February 2024 at 6:24 p.m. EST in the South Pole region of the moon within approximately 1.5 km of the Malapert A crater.<ref name=NYT-20240222 /><ref name=il-lf /><ref name=nbc-td /><ref>[https://www.nasa.gov/missions/lro/nasas-lro-images-intuitive-machines-odysseus-lander/ NASA’s LRO Images Intuitive Machine’s Odysseus Lander] Nasa.gov. February 26, 2024. Retrieved February 26, 2424.</ref><ref name="mission_placement_and_duration">[https://qz.com/sideways-moon-landing-cuts-mission-short-private-us-lu-1851286363 Sideways moon landing cuts mission short, private US lunar lander will stop working Tuesday] Quartz/ qz.com. By Marcia Dunn. February 26, 2024. Retrieved February 26, 2024.</ref> Odysseus's "rough" - soft Moon landing is the first soft landing of any kind for an American made spacecraft since [[Apollo 17]], more than 50 years ago, and the first by a [[Private spaceflight|private company]].<ref name=ap-pl /><ref name=nxsf-im1 /> The soft Odysseus landing also qualifies the Odysseus mission as the first liquid methane and liquid oxygen ([[methalox]]) powered spacecraft to fire beyond low earth orbit, as well as the first methalox spacecraft to land on an off-world celestial body.<ref>[https://www.dropbox.com/scl/fi/bxegh13yo6p8f3nwxv83z/24-02-28-b-reply-from-steve-altemus.pdf?rlkey=48m09hfmv9hkv5lftd4f84bp5&dl=0 Intuitive Machines Press Release] Mindsviewpress. By Steve Altemus. February 28, 2024. Retrieved February 29, 2024.</ref> |
||
The lunar landing was not an ideal "soft landing," as during the touchdown process the Odysseus lander unfortunately landed leaning at a 30° angle. A downloaded image shows the 30° |
The lunar landing was not an ideal "soft landing," as during the touchdown process the Odysseus lander unfortunately landed leaning at a 30° angle. A downloaded image shows the 30° attitude of the lander.{{citation needed}} It is assumed that one of the landing foot struts broke off during the landing, and that the lander is resting on an oxygen tank that was strapped outside of the main fuselage. After landing it was found that the lander remained in radio contact with the IM Mission controllers. Based on the transmissions that IM was able to receive from the lander, it was determined that the lander was still in "good health." Due to the fact that the antennas were not vertically aligned as had initially been planned, transmissions from the lander have been somewhat reduced. Still much valuable science and engineering data has been downloaded back to Earth from the lander.<ref>{{Cite web |last1=Sriram |first1=Akash |last2=Varghese |first2=Harshita |last3=Roulette |first3=Joey |date=February 23, 2024 |title=Intuitive Machines shares descend fast after the CEO says the moon lander is on its side |url=https://www.reuters.com/business/intuitive-machines-rockets-higher-after-landing-spacecraft-moon-2024-02-23/ |access-date=February 23, 2024 |website=Reuters}}</ref><ref>[https://www.usatoday.com/story/news/nation/2024/02/28/odysseus-moon-lander-press-conference-nasa/72772049007/ Watch live: NASA, Intuitive Machines share updates on Odysseus moon lander] USAtoday.com. By Emily DeLetter. February 28, 2024. Retrieved February 28, 2024.</ref> |
||
''Odysseus'' touched down on the Moon in the middle of a lunar day, and was expected to remain functional for approximately six Earth days (until February 27), when the cold lunar night will set in and the solar panels will no longer be able to supply power.<ref name=eda-power /><ref name="mission_placement_and_duration"/> IM engineers announced that they may be able to maintain communication with Odysseus for an additional 10 to 20 hours after the sun has gone down over the Odysseus landing site, due to Odysseus's battery capacity. It was also announced that the Odysseus data feed back to Earth has been sending back payload related science data as well as images. <ref>[https://www.intuitivemachines.com/im-1 Lunar Surface Day Five Update] Intuitivemachines.com. February 27, 2024. Retrieved February 27, 2024.</ref> |
''Odysseus'' touched down on the Moon in the middle of a lunar day, and was expected to remain functional for approximately six Earth days (until February 27), when the cold lunar night will set in and the solar panels will no longer be able to supply power.<ref name=eda-power /><ref name="mission_placement_and_duration"/> IM engineers announced that they may be able to maintain communication with Odysseus for an additional 10 to 20 hours after the sun has gone down over the Odysseus landing site, due to Odysseus's battery capacity. It was also announced that the Odysseus data feed back to Earth has been sending back payload related science data as well as images. <ref>[https://www.intuitivemachines.com/im-1 Lunar Surface Day Five Update] Intuitivemachines.com. February 27, 2024. Retrieved February 27, 2024.</ref> |
File:Intuitive-machines-nova-c-lunar-lander.jpg
Artistic rendering of a Nova-C Class lander on the Moon
| |
Manufacturer | Intuitive Machines |
---|---|
Designer | Intuitive Machines |
Country of origin | United States |
Operator | Intuitive Machines |
Applications | Lunar payloads delivery and support |
Specifications | |
Spacecraft type | Lunar lander |
Bus | Nova-C Bus |
Launch mass | 1,900 kg (4,200 lb) [1] |
Payload capacity | 100 kg (220 lb) [2] |
Power | 200 W (0.27 hp)[2] |
Design life | After landing, 14 Earth days max. |
Dimensions | |
Length | 3 m (9.8 ft) [3] |
Diameter | 2 m (6 ft 7 in) [3] |
Production | |
Status | In production (and operational) |
On order | 2 |
Built | 1 |
Launched | 1 |
Operational | 1 |
Maiden launch | 01:05 a.m. EST, 15 February 2024[4] |
Related spacecraft | |
Derived from | Project Morpheus[2] |
Additional flight information | |
Launch vehicle | Falcon 9 Block 5 |
Avg. cost per spacecraft | $118 million US[5] |
Proximate missions | |
Last mission | IM-1 |
Last mission launch date | 15 February, 2024[6] |
Next mission | IM-2 |
Next mission launch date | Last quarter 2024 (or after)[7] |
The Intuitive Machines Nova-C, or simply Nova-C, is a class of lunar landers designed by Intuitive Machines (IM) to deliver small payloads to the surface of the Moon. Intuitive Machines was one of three service providers awarded task orders in 2019 for delivery of NASA science payloads to the Moon.[8] The IM-1 lunar lander, named Odysseus (pronounced /əˈdɪsiəs/ ə-DISS-ee-əs), was launched by a SpaceX Falcon 9[6] rocket on 15 February 2024, reached lunar orbit on 21 February, and landed on the lunar surface on 22 February. This marked the inaugural Nova-C landing on the Moon and the first American spacecraft to perform a soft landing on the Moon in over 50 years.[9][10] It is the first spacecraft to use methalox propulsion to navigate between the Earth and the Moon.
The second Nova-C lander with the IM-2 mission is scheduled to launch no earlier than the fourth quarter of 2024, and a third Nova-C lander on the IM-3 mission is scheduled for early 2025.[7] SpaceX is under contract to provide Falcon 9 launches for each of the three landers.[11][12][13][14][15]
In 2017, Space Policy Directive 1 signaled the intention of returning NASA astronauts to the Moon.[16] NASA documents obtained by The New York Times suggested the agency would involve the private spaceflight sector in the effort.[17] In 2018, NASA solicited bids from nine companies, including Intuitive Machines, for the Commercial Lunar Payload Services (CLPS) program.[18] CLPS is part of the NASA Artemis program; one of the long term goals of Artemis is establishing a permanent crewed base on the Moon. Intuitive Machines was one of three service providers awarded task orders in 2019 for delivery of NASA science payloads to the Moon.[8]
In 2021, Intuitive Machines received a NASA contract that was initially valued at US$77 million to conduct lunar landings for NASA.[19] After contract modifications, the total contract value came to US$118 million in 2024.[5]
The Nova-C design was developed by Intuitive Machines, inheriting technology from NASA's Project Morpheus. Its pressure-fed, gimbaled VR900 main engine uses methane and oxygen as liquid propellants, pressurized by helium gas, to produce 4,000 N (900 lbf) of thrust.[20] For attitude[a] control the vehicle uses a helium reaction control system.[21] At launch Nova-C is filled with 839 kg (1,850 lb) of liquid oxygen, 420 kg (930 lb) kg of liquid methane and 17 kg (37 lb) of gaseous helium.[22] [23] Propellant is loaded onto Nova-C at the launch pad alongside propellant loading of the launch vehicle.[24] Use of liquid methane and liquid oxygen is believed to be an enabling technology for future deep space missions. Propellants aboard the lander were stored in composite over-wrap liner-less cryogenic tanks. Thermodynamic venting systems provide cryogenic cooling.[25]
Nova-C landers use solar panels as a source of electrical power. Most areas of the lunar surface are sunlit during lunar days, which last approximately fourteen Earth days.
Electrical power is generated by a photovoltaic system with three solar panels, a top deck panel and two body panels, generating a combined maximum of 788 W. Lithium-ion batteries store the power and supply it to the spacecraft when generation does not match consumption.[22]
The lander structure is a hexagonal cylinder with six landing legs and is 3.938 m (12.92 ft) tall. It includes solar panels that can generate 200 W of electrical power on the lunar surface.[26]
The lander includes autonomous landing and hazard detection technology and once landed is still capable of relocating itself to a second landing site by performing a vertical takeoff, cruise, and vertical landing.[2][1] Nova-C is capable of 24/7 data coverage for its client payloads, and can hold a payload of 100 kg (220 lb).[2]
Intuitive Machines is conducting the first three Nova-C missions for the NASA Commercial Lunar Payload Services program.[19] The landers are tasked with delivering small science and technology-development payloads.[27]
The first Nova-C mission, IM-1, uses a lander named Odysseus.[28][29] A contract for the mission was signed in 2021, with later modifications.[5] The mission launched 15 February 2024 on a Falcon 9 launch vehicle and landed on the lunar surface with a "rough" - soft landing on 22 February 2024 at 6:24 p.m. EST in the South Pole region of the moon within approximately 1.5 km of the Malapert A crater.[9][30][31][32][33] Odysseus's "rough" - soft Moon landing is the first soft landing of any kind for an American made spacecraft since Apollo 17, more than 50 years ago, and the first by a private company.[34][35] The soft Odysseus landing also qualifies the Odysseus mission as the first liquid methane and liquid oxygen (methalox) powered spacecraft to fire beyond low earth orbit, as well as the first methalox spacecraft to land on an off-world celestial body.[36]
The lunar landing was not an ideal "soft landing," as during the touchdown process the Odysseus lander unfortunately landed leaning at a 30° angle. A downloaded image shows the 30° attitude of the lander.[citation needed] It is assumed that one of the landing foot struts broke off during the landing, and that the lander is resting on an oxygen tank that was strapped outside of the main fuselage. After landing it was found that the lander remained in radio contact with the IM Mission controllers. Based on the transmissions that IM was able to receive from the lander, it was determined that the lander was still in "good health." Due to the fact that the antennas were not vertically aligned as had initially been planned, transmissions from the lander have been somewhat reduced. Still much valuable science and engineering data has been downloaded back to Earth from the lander.[37][38]
Odysseus touched down on the Moon in the middle of a lunar day, and was expected to remain functional for approximately six Earth days (until February 27), when the cold lunar night will set in and the solar panels will no longer be able to supply power.[39][33] IM engineers announced that they may be able to maintain communication with Odysseus for an additional 10 to 20 hours after the sun has gone down over the Odysseus landing site, due to Odysseus's battery capacity. It was also announced that the Odysseus data feed back to Earth has been sending back payload related science data as well as images. [40]
IM and NASA held a joint press conference on February 28 at 2 PM EST to discuss and review the IM-1 mission.[41] After the press conference, IM announced that until entering standby mode on February 29, 2024, Odysseus had transmitted over 350 megabytes of science and engineering data from all payloads. It also announced that it plans to try to revive the unit in two or three weeks during the next lunar day.[42]
IM was selected in October 2020 in order to land its second Nova-C lander near the lunar south pole. As of February 2024, IM-2 is expected to be launched no earlier than the fourth quarter of 2024.[7] The primary payload, PRIME-1, includes the TRIDENT ice drill to sample ice from below the lunar surface and the MSolo mass spectrometer to measure the amount of ice in the samples.[43][44]
ILO-1 prime contractor Canadensys is working to deliver "a flight-ready low-cost optical payload for the ILO-1 mission, ruggedized for the Moon South Pole environment". It could potentially be ready for integration on the IM-2 mission.[45]
The µNova (Micro Nova) Hopper will separate from the Nova-C lander after landing and function as a standalone hopper lander, exploring multiple difficult-to-reach areas such as deep craters on the lunar surface.[46][47]
A lunar communications satellite will be deployed on this mission to facilitate communications between the lander and ground stations on Earth.[47]
Spaceflight will deliver rideshare payloads on this mission aboard its Sherpa EScape (Sherpa-ES) space tug called Geo Pathfinder.[48][49]
The MiniPIX TPX3 SPACE payload, provided by the Czech company ADVACAM, will be onboard the Nova-C lunar lander. This payload is designed to monitor the radiation field on the Moon and help understand how to protect crew and equipment from the negative effects of cosmic rays. This marks the first Czech payload planned to be delivered to the Moon's surface.[50][51]
In August 2021, IM selected SpaceX to launch its third lunar mission IM-3, at some point in 2024.[13] As of February 2024, the launch of IM-3 is expected to take place in early 2025.[7] It will deliver payloads to the Reiner Gamma lunar swirl for the Commercial Lunar Payload Services program.[52][53] There the lander will conduct experiments investigating the properties of the unexpected magnetic field that has been detected in the vicinity of the Reiner Gamma swirl.[54]
Intuitive Machines have indicated that they are working on a 'commercial' mission, named IM-C1.[25]
The Nova-C lander was designed to be compatible with methane and oxygen fuel sources that are believed to be available on both the Moon and on Mars. For future missions, methane and oxygen could potentially be "harvested" wherever the Nova-C lander may be based using In-situ resource utilization (ISRU) (off-world resource processing technologies).[55][56] The Nova-C lander technology platform can be scaled up to mid and large lander classes, capable of accommodating larger payloads.[27]
In an interview with NASA recorded in October 2023, Tim Crain, CTO of Intuitive Machines, mentioned the possible development of a Nova-D lander.[57] Early reports of the in-development Nova-D state that it will use two of the VR-900 engines and be capable of carrying more than 500 kg to the lunar surface.[58]
Intuitive Machines is developing another lander, the Nova-M which, according to early reports, will use two VR-3500 engines originally developed for Boeing and their HLS to carry 5,000 kg to the lunar surface.[58]
{{cite news}}
: |archive-date=
/ |archive-url=
timestamp mismatch; 23 February 2024 suggested (help)
{{cite web}}
: CS1 maint: bot: original URL status unknown (link) Space.com. By Mike Wall. Jan. 31, 2024. Retrieved Feb. 5, 2024.
| ||||||
---|---|---|---|---|---|---|
| ||||||
Missions |
| |||||
Agencies |
| |||||
Facilities |
| |||||
Rockets |
| |||||
Crewed spacecraft |
| |||||
Robotic spacecraft |
| |||||
|
Lunar landing missions
| |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Active |
| ||||||||||
Past |
| ||||||||||
Failed |
| ||||||||||
Planned |
| ||||||||||
Proposed |
|
| |
---|---|
January |
|
February |
|
March |
|
April |
|
May |
|
June |
|
July |
|
Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ). |