curprev15:2715:27, 31 January 2019 FlyRNPGuytalkcontribs 24,185 bytes+97 →Description: It is incorrect to say RF is only allowed for RNP AR (see ICAO Doc 8168 Vol II, Part III Section 1, para 1.1.4.J.a "The RF path terminator functionality is required in the ARNP navigation specification and is an optional function in the RNP 1, RNP 0.3 and RNP APCH navigation specifications.") it is correct to say that RF legs between the Final Approach Fix (FAF) or Precise Final Approach Fix (PFAF) and the Missed approach Point (MAPT) or are only allowed for RNP-ARundo