Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Closure of 20112012  





1.2  Potential impact of tolling I-65 bridges  







2 Construction  





3 See also  





4 References  





5 External links  














Sherman Minton Bridge: Difference between revisions







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




Print/export  







In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 38°1642.44N 85°4919.34W / 38.2784556°N 85.8220389°W / 38.2784556; -85.8220389

Help
 

From Wikipedia, the free encyclopedia
 


Browse history interactively
 Previous editNext edit 
Content deleted Content added
Earl753 (talk | contribs)
456 edits
updating urls
Filled in 1 bare reference(s) with reFill 2
Line 57: Line 57:

}}{{dead link|date=January 2018|bot=medic}}{{cbignore|bot=medic}}</ref><ref>{{cite news|url=http://start.toshiba.com/news/read.php?rip_id=%3CD9PN1CQ03%40news.ap.org%3E&ps=1011&page=2 |title=Traffic nightmare over closed Ohio River bridge |first1=Brett |last1=Barrouquere |first2=Janet |last2=Cappiello |agency=Associated Press |date=September 12, 2011 |access-date=September 12, 2011 |url-status=dead |archive-url=https://web.archive.org/web/20140820235627/http://start.toshiba.com/news/read.php?rip_id=%3CD9PN1CQ03%40news.ap.org%3E&ps=1011&page=2 |archive-date=August 20, 2014 }}</ref>

}}{{dead link|date=January 2018|bot=medic}}{{cbignore|bot=medic}}</ref><ref>{{cite news|url=http://start.toshiba.com/news/read.php?rip_id=%3CD9PN1CQ03%40news.ap.org%3E&ps=1011&page=2 |title=Traffic nightmare over closed Ohio River bridge |first1=Brett |last1=Barrouquere |first2=Janet |last2=Cappiello |agency=Associated Press |date=September 12, 2011 |access-date=September 12, 2011 |url-status=dead |archive-url=https://web.archive.org/web/20140820235627/http://start.toshiba.com/news/read.php?rip_id=%3CD9PN1CQ03%40news.ap.org%3E&ps=1011&page=2 |archive-date=August 20, 2014 }}</ref>



It was initially feared the bridge would remain closed from several months to up to 3 years, and that the entire span would have to be either completely replaced or extensively renovated before the Sherman Minton Bridge could reopen to traffic. However, engineers determined the crack that initiated the bridge closure dated back to the bridge's original construction in the 1960s, but had not been discovered until the summer of 2011 because another structural component was covering it. On September 23, 2011, Kentucky Governor [[Steve Beshear]] and US Secretary of Transportation [[Ray LaHood]] announced the 2.5-inch crack has been repaired, but the bridge would remain closed until crews completed an inspection of the remainder of the bridge.<ref>[https://www.wdrb.com/story/15533343/indot-no-replacement-needed-for-sherman-minton-bridge "LAHOOD: One Sherman Minton Bridge crack repaired; no timetable for re-opening", WDRB-TV, September 23, 2011]</ref> Five to seven additional cracks were discovered during the following inspection in welded areas in a load-bearing steel beam. "The fissures were discovered in a type of steel frequently used in the 1950s and 1960s that is now known to be susceptible to cracking. ...". This necessitated the bridge being closed for an extended period of time for repairs. Repairs cost $20 million and ultimately took four months to complete.<ref>{{cite news |url=https://pqasb.pqarchiver.com/courier_journal/access/2474952381.html?FMT=ABS&FMTS=ABS:FT&type=current&date=Oct+1%2C+2011&author=Marcus+Green&pub=Courier+-+Journal&edition=&startpage=A.1&desc=Bridge+fix%3A+6+months%2C+%2420+million |title=Sherman Minton Bridge repairs to take six months, cost $20M |newspaper=The Courier-Journal |date=October 1, 2011 |access-date=October 1, 2011}}</ref>

It was initially feared the bridge would remain closed from several months to up to 3 years, and that the entire span would have to be either completely replaced or extensively renovated before the Sherman Minton Bridge could reopen to traffic. However, engineers determined the crack that initiated the bridge closure dated back to the bridge's original construction in the 1960s, but had not been discovered until the summer of 2011 because another structural component was covering it. On September 23, 2011, Kentucky Governor [[Steve Beshear]] and US Secretary of Transportation [[Ray LaHood]] announced the 2.5-inch crack has been repaired, but the bridge would remain closed until crews completed an inspection of the remainder of the bridge.<ref>{{Cite web|url=https://www.wdrb.com/story/15533343/indot-no-replacement-needed-for-sherman-minton-bridge|title="LAHOOD: One Sherman Minton Bridge crack repaired; no timetable for re-opening", WDRB-TV, September 23, 2011}}</ref> Five to seven additional cracks were discovered during the following inspection in welded areas in a load-bearing steel beam. "The fissures were discovered in a type of steel frequently used in the 1950s and 1960s that is now known to be susceptible to cracking. ...". This necessitated the bridge being closed for an extended period of time for repairs. Repairs cost $20 million and ultimately took four months to complete.<ref>{{cite news |url=https://pqasb.pqarchiver.com/courier_journal/access/2474952381.html?FMT=ABS&FMTS=ABS:FT&type=current&date=Oct+1%2C+2011&author=Marcus+Green&pub=Courier+-+Journal&edition=&startpage=A.1&desc=Bridge+fix%3A+6+months%2C+%2420+million |title=Sherman Minton Bridge repairs to take six months, cost $20M |newspaper=The Courier-Journal |date=October 1, 2011 |access-date=October 1, 2011}}</ref>



In a news release from the Indiana Department of Transportation, dated October 18, 2011, Governor Mitch Daniels announced that Louisville based Hall Contracting of Kentucky had been awarded the repairs contract in the amount of $13.9 million. A time frame of 135 work days was announce with an incentive of $100,000 per day to finish early. Likewise, a penalty of $100,000 would be deducted from the contract payments for each day over. Repair cost were covered by the [[Federal Highway Administration]], who announced on September 30, 2011, that it would contribute 25% of the cost, with the remaining 75% being equally split between Indiana and Kentucky.

In a news release from the Indiana Department of Transportation, dated October 18, 2011, Governor Mitch Daniels announced that Louisville based Hall Contracting of Kentucky had been awarded the repairs contract in the amount of $13.9 million. A time frame of 135 work days was announce with an incentive of $100,000 per day to finish early. Likewise, a penalty of $100,000 would be deducted from the contract payments for each day over. Repair cost were covered by the [[Federal Highway Administration]], who announced on September 30, 2011, that it would contribute 25% of the cost, with the remaining 75% being equally split between Indiana and Kentucky.


Revision as of 01:06, 9 May 2024

Sherman Minton Bridge
The bridge as seen from the flood wall in New Albany
Coordinates38°16′42.44″N 85°49′19.34″W / 38.2784556°N 85.8220389°W / 38.2784556; -85.8220389
Carries6 lanes (3 upper, 3 lower) of I-64 / US 150
CrossesOhio River
LocaleLouisville, Kentucky and New Albany, Indiana
Maintained byIndiana Department of Transportation
Characteristics
DesignDouble-decked twin tied arch bridge
Total length2,052.9 ft (625.7 m)
Width42 ft (13 m)
Longest span800 ft (240 m)
Clearance above16.3 ft (5.0 m)
History
OpenedDecember 22, 1961 (lower deck) September 1, 1962 (upper deck)
Statistics
Daily traffic68,000/day
Location
Map

The Sherman Minton Bridge is a double-deck through arch bridge spanning the Ohio River, carrying I-64 and US 150 over the river between Kentucky and Indiana. The bridge connects the west side of Louisville, Kentucky to downtown New Albany, Indiana.

History

In 1952 the "Second Street Bridge" was reaching peak traffic, and the K&I Bridge faring similarly. Arthur W. Grafton commissioned two studies in 1952 and 1953, with their results being a need for two bridges in Louisville; one crossing to Jeffersonville, Indiana, and the other to New Albany. Hoosiers as far as Scottsburg, Indiana (30 miles (48 km) away) were vastly against making any bridges toll, and many residents of Louisville were against toll bridges as well.[1] When the Interstate Highway System was announced by President Dwight D. Eisenhower, the solution became clear. The Federal government would finance 90% of both bridges, with Indiana paying 10% of the New Albany bridge, and Kentucky paying 10% of the Jeffersonville bridge.[1]

The New Albany bridge was given to Hazelet & Erdal, of Louisville to design in 1956. Construction began in June 1959. The lower deck was dedicated and opened on December 22, 1961, by Indiana Governor Matthew Welsh and Kentucky Governor Bert T. Combs. It was built at a cost of $14.8 million. At the time it was dedicated, it was named the Louisville-New Albany Bridge. New Albany Mayor C. Pralle Erni suggested to Indiana State Senator Clifford H. Maschmeyer of Clarksville to name the new bridge for the former United States Senator and Supreme Court justice Sherman Minton. On April 4, 1962, Indiana governor Matthew E. Welsh made the formal announcement that it would be named for Minton, who was a native of New Albany.[2] The upper deck was completed on September 1, 1962, and opened that day at 11:00 AM without ceremonies. The American Institute of Steel Construction in 1961 named it the most beautiful long-span bridge of the year.[1]

View of the bridge from the Main Street in New Albany

On February 5, 2009, a fifteen container coal barge lost power and was pushed downstream by the current and struck the bridge's central pier. The Indiana Department of Transportation (INDOT) closed the bridge for several hours while it was inspected for damage. When no damage was found, the bridge was reopened later the same day.[3]

Closure of 2011–2012

On September 9, 2011, Indiana Governor Mitch Daniels ordered the bridge closed. This was done after construction crews found cracks in the main load-bearing structural element. Experts from INDOT, the Kentucky Transportation Cabinet (KYTC), the Federal Highway Administration (FHWA), and private engineering firms and academic institutions participated in determining the severity of this crack and others found on the bridge, and determine whether the bridge could be saved.[4][5][6]

It was initially feared the bridge would remain closed from several months to up to 3 years, and that the entire span would have to be either completely replaced or extensively renovated before the Sherman Minton Bridge could reopen to traffic. However, engineers determined the crack that initiated the bridge closure dated back to the bridge's original construction in the 1960s, but had not been discovered until the summer of 2011 because another structural component was covering it. On September 23, 2011, Kentucky Governor Steve Beshear and US Secretary of Transportation Ray LaHood announced the 2.5-inch crack has been repaired, but the bridge would remain closed until crews completed an inspection of the remainder of the bridge.[7] Five to seven additional cracks were discovered during the following inspection in welded areas in a load-bearing steel beam. "The fissures were discovered in a type of steel frequently used in the 1950s and 1960s that is now known to be susceptible to cracking. ...". This necessitated the bridge being closed for an extended period of time for repairs. Repairs cost $20 million and ultimately took four months to complete.[8]

In a news release from the Indiana Department of Transportation, dated October 18, 2011, Governor Mitch Daniels announced that Louisville based Hall Contracting of Kentucky had been awarded the repairs contract in the amount of $13.9 million. A time frame of 135 work days was announce with an incentive of $100,000 per day to finish early. Likewise, a penalty of $100,000 would be deducted from the contract payments for each day over. Repair cost were covered by the Federal Highway Administration, who announced on September 30, 2011, that it would contribute 25% of the cost, with the remaining 75% being equally split between Indiana and Kentucky.

View of the Sherman Minton bridge from Floyd's Knobs. Louisville International Airport is in the distance.

The contract attached 1,200 short tons (1,100 t) of reinforcing steel plating along both sides of the bridge ties spanning 1,600 feet (490 m). The repairs along with regular maintenance increased the bridge's safety and reliability and extend its useful life by at least 20 years.[9]

Repairs were completed and the Sherman Minton Bridge reopened at 11:50 pm on February 17, 2012.[10]

Potential impact of tolling I-65 bridges

The bridge has been expected to see major increases in traffic following the completion of the Ohio River Bridges Project at the end of 2016. The project included repurposing the John F. Kennedy Memorial Bridge, which previously carried I-65 in both directions, for southbound traffic only; building the new Abraham Lincoln Bridge for northbound I-65 traffic; and building the Lewis and Clark Bridge to connect I-265 in the two states. The two I-65 crossings and the I-265 bridge are tolled to pay for the project, leaving the Sherman Minton as the only free interstate-quality river crossing in the Louisville area. One consultant who worked on a transportation study for the Kentucky government predicted that traffic on the Sherman Minton would increase by nearly 40% once tolling on the other bridges started.[11]

Construction

The bridge is a double-deck configuration—westbound traffic from Kentucky to Indiana travels on the upper deck of the bridge, while eastbound traffic from Indiana into Kentucky travels on the lower deck of the bridge. It is of similar construction to the Hernando de Soto BridgeinMemphis, Tennessee (with the primary difference being that the de Soto Bridge is single-deck).

The steel used was T1 steel, which in the early 1960s was "innovative material" but is much weaker than modern steel. Classification of the bridge is "fracture critical" because if one part of the bridge should fail, the entire bridge could be at risk.[12]

See also

References

  1. ^ a b c Kleber p.123
  • ^ Kleber pp.123,418
  • ^ Mike Dever (February 5, 2009). "Sherman Minton Bridge Reopens". WAVE 3 News. Retrieved September 12, 2011.
  • ^ "Sherman Minton bridge shut down; crack found in bridge". Louisville, Kentucky: WDRB. September 9, 2011. Retrieved September 9, 2011.
  • ^ "Sherman Minton Bridge closed indefinitely due to structural cracks". The Courier-Journal. Louisville, KY. September 9, 2011. Retrieved September 11, 2011.[dead link]
  • ^ Barrouquere, Brett; Cappiello, Janet (September 12, 2011). "Traffic nightmare over closed Ohio River bridge". Associated Press. Archived from the original on August 20, 2014. Retrieved September 12, 2011.
  • ^ ""LAHOOD: One Sherman Minton Bridge crack repaired; no timetable for re-opening", WDRB-TV, September 23, 2011".
  • ^ "Sherman Minton Bridge repairs to take six months, cost $20M". The Courier-Journal. October 1, 2011. Retrieved October 1, 2011.
  • ^ "Sherman Minton Bridge Repair to Require 135 Work Days" (PDF). Indiana Department of Transportation. Retrieved October 27, 2011.
  • ^ "Motorists celebrate bridge reopening".
  • ^ Sutter, Chris (November 17, 2016). "Many fear un-tolled bridges will wear quickly due to increased traffic". Louisville: WDRB. Retrieved November 18, 2016.
  • ^ "Agency: Sherman Minton Bridge's Steel More Brittle". Associated Press. September 12, 2011. Archived from the original on March 23, 2012. Retrieved September 12, 2011.
  • 'Works cited

    External links


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Sherman_Minton_Bridge&oldid=1222963758"

    Categories: 
    Bridges completed in 1962
    Bridges in Louisville, Kentucky
    Bridges over the Ohio River
    Buildings and structures in New Albany, Indiana
    Double-decker bridges
    Interstate 64
    Through arch bridges in the United States
    Transportation buildings and structures in Floyd County, Indiana
    U.S. Route 150
    Road bridges in Indiana
    Road bridges in Kentucky
    Bridges on the Interstate Highway System
    Bridges of the United States Numbered Highway System
    Steel bridges in the United States
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    All articles with dead external links
    Articles with dead external links from January 2018
    Articles with short description
    Short description is different from Wikidata
    Use mdy dates from September 2019
    Coordinates on Wikidata
    Infobox mapframe without OSM relation ID on Wikidata
    Pages using infobox bridge with clearance
    Commons category link is on Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 9 May 2024, at 01:06 (UTC).

    This version of the page has been revised. Besides normal editing, the reason for revision may have been that this version contains factual inaccuracies, vandalism, or material not compatible with the Creative Commons Attribution-ShareAlike License.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki