Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Original RER Project  





1.2  Current Project  



1.2.1  The tram-train solution  





1.2.2  Declaration of public utility  





1.2.3  Work  







1.3  Versailles-Chantiers Extension  







2 Planned rolling stock  





3 Route  





4 References  





5 External links  














Île-de-France tramway Line 12 Express






Čeština
Español
Esperanto
Français
Português

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Île-de-France tramway Line 12 Express
Tramways in Île-de-France Île-de-France tramway Line 12
Île-de-France tramway Line 12 Express at the Évry-Courcouronnes Centre terminal
Overview
OwnerÎle-de-France Mobilités
Termini
  • Évry-Courcouronnes Centre
  • Stations16
    Service
    TypeTram-train
    SystemTramways in Île-de-France
    Operator(s)Transkeo
    Rolling stock21Alstom Citadis Dualis
    History
    Opened10 December 2023 (2023-12-10)
    Technical
    Line length20 km (12 mi)
    Track gauge1,435 mm (4 ft 8+12 in) standard gauge

    Route map

    Massy–Palaiseau
    RERRER BRER C TransilienTransilien Line V Ouigo#Ouigo Train Classique SNCF

    Massy-Europe

    Champlan

    Longjumeau

    Chilly-Mazarin

    Gravigny-Balizy

    Petit Vaux

    Épinay-sur-Orge
    RERRER C

    Parc du Château

    Côteaux de l'Orge

    Amédée Gordini

    La Ferme-Neuve

    Bois de Saint-Eutrope

    Traité de Rome

    Bois Briard

    Évry-Courcouronnes Centre
    RERRER D

    Handicapped/disabled access All stations are accessible

    Key

    Heavy rail section

    Light rail tram section
  • talk
  • edit
  • Île-de-France tramway Line T12 Express (known as the Tram-Train Évry-Massy and Tram Express Sud during the planning phase) is a suburban tram-train line in Paris, France. Designed by Île-de-France Mobilités and operated by Transkeo T12-T13 (a joint venture 51% owned by Keolis and 49% owned by SNCF Voyageurs), the line is 20 kilometres (12 miles) long and is projected to carry approximately 40,000 passengers per day. On 22 January 2014, the STIF published a plan presenting the commissioning of the line in 2020.[1] Initially planned to open in 2020, the opening date of the line was postponed to 2022, and in May 2021, the opening date of T12 was delayed again to December 2023. The line opened on 10 December 2023.[2]

    History[edit]

    Original RER Project[edit]

    The line of tram-train Évry – Massy finds its origin in the project of Tangential the South or Tangential Southwest, which suggested connecting by a new RER line the city of Versailles, even that of AchèresinYvelines, to that from MeluninSeine-et-Marne, including Massy and Évry.

    The project contained several operations:

    The studies were presented in committee of follow-up of the STIF on 23 September 2004.[4]

    Registered with a 300 million euro budget on the planning contract State-Region in 2000–2006, the project of a global cost about a billion euros was finally abandoned in 2006 considering its cost considered as prohibitive by comparison with its expected effects. The attributed credits were accordingly lost.

    Current Project[edit]

    The tram-train solution[edit]

    The STIF then proposed a less expensive solution but questioning all the led studies. On its essonnian part, the project was transformed into a more modest line, but also more viable, connecting Évry with Massy by tram-train, the comfort, the speed and the number of transported passengers being necessarily lower than the initial project.

    In February 2008 the projected timescale was established as follows:

    Within the framework of the "Plan Banlieue" approved by the interministerial committee of the cities on 20 June 2008, the State claimed to be ready to finance at the level of 220 million euros "to support at least 4 specific projects of which the Tramway Line 4 towards Clichy-Montfermeil, the Tangentielle Nord, the Massy-Evry tram-train and the connection RER D/RER B (Barreau de Gonesse)".

    The public consultation, which was kept during the second semester 2009, had no unanimous result. The proposed plan met oppositions: the association Tangentielle 8, for example, clearly showed its opposition to the project because of the abandonment of the Juvisy-Massy-Versailles direct link. The association rather proposed a RER line Juvisy-Massy-Versailles disconnected from the RER line C, and, in addition, to create a tramway line between Savigny and Évry.

    The fate of the section between Versailles-construction sites and Massy-Palaiseau, who is at present a member of the branch C8, was unknown back then. In 2020, this section must be kept in principle in the plan of the RER C, after its connecting in the branch C2 of the RER C ending in the same place (this railway is moreover used by some Norman TGV intersectors every week). It was later decided to extent the line from Massy-Palaiseau to Versailles-Chantiers, in order to replace completely the branch C2. The projected putting into service is towards the end of 2020.

    Declaration of public utility[edit]

    The public inquiry of the first phase, that is approximately 20 km (12 mi) connecting the multimodal pole of Évry-Courcouronnes Centre with the station of Massy-Palaiseau, was held from 7 January to 11 February 2013, within the various municipalities concerned by the project. The déclaration d'utilité publique (declaration of public utility) was granted on 22 August 2013.

    Work[edit]

    The financial plan of the line, to the amount of 455 million euros, is approved on 7 October 2015, by the STIF. The coverage is split between the State (28%), the region Île-de-France (53%), the Essonne departmental council (15%) and SNCF Réseau (4%). Work began at the beginning of 2017, then the validation of the protocol of financing on 9 March 2017 by the regional elected representatives guaranteed the pursuit of the project for the deadlines, with an opening planned in 2020.

    Versailles-Chantiers Extension[edit]

    At the end of 2008, the SNCF proposed that the section between Versailles-Chantiers and Pont de Rungis (when it will be merged, thanks to the putting into service of the streetcar-train Évry-Massy in 2017) will be integrated into a project of tram-train connecting the stations of Versailles-Chantiers and Sucy-Bonneuil and it will replace the RER C (since December 2023 replaced by Transilien Line V on this segment).

    However, during the public dialogue on the streetcar-train Évry-Massy, numerous notices expressed themselves in favour of another solution: the extension of the Évry-Massy tram-train to Versailles-Chantiers. Both projects are not compatible.

    On 26 January 2011 the State and the Region agreed on the broad guidelines for public transport in Île-de-France by quoting the possible extension of the Évry-Massy tram-train to Versailles-Chantiers with the indication of a putting into service planned for 2020.

    At the beginning of 2011, SNCF seemed to notice this choice concerning the section between Versailles-Chantiers and Massy-Palaiseau by suggesting integrating the section between Massy-Palaiseau and Pont de Rungis into a Massy-Palaiseau-Sucy-Bonneuil line via Pont de Rungis.

    On 16 May 2013 the STIF officially validated the continuation of the tram-train up to the station of Versailles-Chantiers. The tram-train would completely replace the C8 branch of the RER C. The project was presented in preliminary dialogue from 1 June to 7 July 2013.

    Planned rolling stock[edit]

    The line is operated with 25 Class U52600 Citadis Dualis tram-trains.[2]

    The Citadis Dualis, a tram-train version of Citadis, is an electrical equipment 2.65 m wide and 42 m long, with a load in the 11.5-ton axle, the maximal speed of 100 km/h (62 mph). It is capable of strong accelerations and can climb banisters of 65%. Totally accessible to people with reduced mobility or in wheelchairs, it is endowed with a flat floor 38 cm in height, and can transport 250 people. It can circulate in double or triple units to adapt itself to the traffic. The material will be endowed with an air conditioning system, with a space reserved for the people with reduced mobility, of a video surveillance system as well as a system of visual and sound announcement of the served stations, and a bright display from the plan of the line.

    Route[edit]

    The line Évry-Massy, planned to be 20 kilometres (12 miles) long, will serve all in all 16 stations and stations among which 11 new stations, allowing in main-line railway lines the service of the municipalities of Longjumeau, Chilly-Mazarin and finally Épinay-sur-Orge. Then, in an urban tramway network, it will serve the municipalities of Épinay-sur-Orge, Morsang-sur-Orge, Viry-Châtillon, Grigny, Ris-Orangis, Courcouronnes and finally Évry. It will have interchanges with existing Réseau Express Régional (RER) lines B, C and D.

    References[edit]

    1. ^ "Le Nouveau Grand Paris : un projet au service des (...) – Portail du …". archive.ph. 2014-01-26. Archived from the original on 2014-01-26. Retrieved 2022-03-16.
  • ^ a b Haydock, David (2023-12-11). "Paris tram-train Line T12 opens". International Railway Journal.
  • ^ "Municipal site of Épinay-sur-Orge – Communication of the session of 21 December 2006 (In French)". Epinay-sur-Orge website. Archived from the original on 2007-10-13.
  • ^ "RFF – Our Projects – Tangentielle Sud (In French, via archive.wikiwix)". rff.fr. Archived from the original on 2008-12-07.
  • External links[edit]

    (in French) Official website


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Île-de-France_tramway_Line_12_Express&oldid=1225073170"

    Categories: 
    Rail transport in Paris
    Tram lines in Île-de-France
    Railway lines opened in 2023
    Hidden categories: 
    Articles with short description
    Short description matches Wikidata
    Transport articles needing translation from French Wikipedia
    Wikipedia articles needing clarification from June 2020
    Articles with French-language sources (fr)
     



    This page was last edited on 22 May 2024, at 06:08 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki