Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  





2 Current system  





3 References  














Akron Barberton Cluster Railway







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Akron Barberton Cluster Railway
Overview
HeadquartersBarberton, Ohio
Reporting markAB
LocaleOhio
Dates of operation1994–present
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge

The Akron Barberton Cluster Railway (reporting mark AB) is a Class III railroad that operates on 73 miles (117 km) of track in and around Akron, Ohio.

History[edit]

ABC Railway's beginnings trace back to the organization of the Akron and Barberton Belt Railroad (ABB) which had been formed in the late 19th century. ABB owned 62 miles (100 km) of track in and around Akron, Ohio.

By the 1980s, ABB's traffic had fallen due to a lack of business in the tire industry in Akron. In 1994, the new Wheeling and Lake Erie Railway purchased the ABB. After the ICC and W&LE signed an agreement and contract in 1993, W&LE made arrangements to form a new railroad in Akron using the former ABB as its basis.

In early 1994, WE created Akron Barberton Cluster Railway (ABCR) from the former ABB assets. It also included the former Erie main line from Barberton to Rittman and from Kent to Ravenna, Ohio sold by Conrail. In 1997, ABCR was granted permission to tear out 45% the former ABB "Loop" line which looped from the grade in Barberton and Firestone Park to the WE's Brittain Yard in Akron. In 1999, ABCR took the line out of service, and in 2001, they tore the line out completely with expenses paid off by parent railroad company, WE.

Current system[edit]

ABCR has trackage rightsonCSX's New Castle Subdivision from the yard in Akron south to Barberton, where it swings off around their headquarters area. ABCR is headquartered in a small building off a local road in Barberton, Ohio. ABCR uses the restored Erie Railroad line from Barberton to Rittman, Ohio.

In 2002, the railroad acquired the line to the General Electric factory in northern Ravenna, Ohio. ABCR has purchased trackage rights with METRO Regional Transit Authority in 2006, to connect to the Canton area.

References[edit]


Retrieved from "https://en.wikipedia.org/w/index.php?title=Akron_Barberton_Cluster_Railway&oldid=1222773923"

Categories: 
Ohio railroads
Switching and terminal railroads
Hidden categories: 
Articles lacking sources from May 2009
All articles lacking sources
 



This page was last edited on 7 May 2024, at 20:43 (UTC).

Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



Privacy policy

About Wikipedia

Disclaimers

Contact Wikipedia

Code of Conduct

Developers

Statistics

Cookie statement

Mobile view



Wikimedia Foundation
Powered by MediaWiki