Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Position on the railway network  





2 History of Bellegarde railway station  



2.1  Before the creation of the SNCF  





2.2  After 1938  the creation of the SNCF  





2.3  The arrival of the TGV  







3 Lines which converge on Bellegarde-sur-Valserine  





4 Services  





5 See also  





6 References  














Bellegarde station






Esperanto
Français

Italiano
Magyar
مصرى
Nederlands
Polski

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 46°633.930N 5°4924.539E / 46.10942500°N 5.82348306°E / 46.10942500; 5.82348306
 

From Wikipedia, the free encyclopedia
 


Bellegarde
Circular building with domed roof
The station building in 2010
General information
Location1, place Charles-de-Gaulle
Valserhône
France
Coordinates46°6′33.930″N 5°49′24.539″E / 46.10942500°N 5.82348306°E / 46.10942500; 5.82348306
Owned bySNCF
Line(s)
  • Longeray-Léaz-Le Bouveret line [fr]
  • Lyon–Geneva line
  • Train operators
  • Swiss Federal Railways
  • Other information
    Station code87745000
    Fare zone400 (unireso)[1]
    Passengers
    20181,151,476[2]
    Services
    Preceding station SNCF Following station
    Paris-Lyon
    Terminus
    TGV

    Annemasse
    TGV inOui

    Seasonal service
    Annemasse
    towards Saint-Gervais
    Preceding station TGV Lyria Following station
    Nurieux
    towards Paris-Lyon
    Paris to Lausanne Geneva
    towards Lausanne
    Lyon-Part-Dieu Marseille to Geneva Geneva
    Terminus
    Preceding station TER Auvergne-Rhône-Alpes Following station
    Culoz
    towards Valence
    2 Geneva
    Terminus
    Seyssel-Corbonod 3
    Valleiry
    Seyssel-Corbonod
    towards Chambéry
    51 Geneva
    Terminus
    Preceding station Logo Léman Express - LEX Léman Express Following station
    Terminus L6 Pougny-Chancy

    Location

    Bellegarde is located in France
    Bellegarde

    Bellegarde

    Location within France

    Bellegarde is located in Auvergne-Rhône-Alpes
    Bellegarde

    Bellegarde

    Bellegarde (Auvergne-Rhône-Alpes)

    Bellegarde station (French: Gare de Bellegarde) is a railway station served by TGV, TER Auvergne-Rhône-Alpes and Léman Express located in Bellegarde-sur-Valserine, in the département of Ain, France.

    The first station building opened in 1858 to allow a stop on the line between Seyssel and Geneva. The wooden building was destroyed by fire and requiring the construction of a new building in 1907. Over the years, other lines reached to the station, causing passenger numbers to grow. The first TGV service was in 1981 between Paris Gare de Lyon and Geneva. From a simple railway station, the site underwent a major restructuring in 2010 to become an interchange.[3] This was triggered by the decision to renovate the Ligne du Haut-Bugey.

    Position on the railway network[edit]

    A junction station, situated at kilometer 134,252 of the Lyon–Geneva railway, and kilometer 64,523 of the Ligne du Haut-Bugey. Its altitude is 378m.

    History of Bellegarde railway station[edit]

    Before the creation of the SNCF[edit]

    Façade in the early 20th century. In the foreground, a motor car of the Bellegarde-Chézery tram. Bellegarde was a terminus for this line which operated from 1912 to 1937.

    Railway history started in Bellegarde-sur-Valserine in the middle of the 19th century.[4] In 1830, the first studies of a Bellegarde-Geneva line were done.[5] The decision on construction of the Lyon–Geneva railway was part of a project to reduce the travel time from Paris to the Swiss border from 6 days to 12 hours,[6] was finalized when a law was passed on 10 June 1853 by Napoleon III concerning the commitment by the treasury to the construction of a railway to the frontier of Geneva.[7] The Seyssel-Geneva section was opened on 18 March 1858[8] with a halt in Bellegarde where the station building was in the style of a Swiss chalet.[4] The station was designed as a last junction before the frontier, avoiding lines connecting French territory passing through Swiss territory. It was thus used for customs controls on people and goods.[9]

    A new service was inaugurated when, on 30 August 1880, the line from Longeray to Thonon via Annemasse and Evian was opened. This service was operated by the Chemins de fer de Paris à Lyon et à la Méditerranée (PLM) company. Two years later on 1 April 1882, the Cluse-Bellegarde section of the Ligne du Haut-Bugey opened. This section completed the line from Bourg en Bresse to Bellegarde operated by Compagnie des Dombes et du Sud-Est.[10] In 1883, the PLM acquired the Compagnie des Dombes,[11] and from then on, Bellegarde was exclusively served by the PLM.

    On 1 August 1904, a fire completely destroyed the station building.[11] A new building was constructed on the site of the old one and opened in 1907.[12] This in turn was severely damaged by fire in the night of the 9 April 2003.[13]

    After 1938 – the creation of the SNCF[edit]

    The façade on a mid 20th century postcard

    Upon its creation in 1938, the SNCF took over the operation of the Culoz-Bellegarde line from the PLM,[8] and over time created new links to western Switzerland. Bellegarde station became connected to the whole of France.

    As technology evolved with time, different types of railcar passed through Bellegarde, An X2700 class RGP2 passed through on its inaugural trip from Lyon-PerrachetoGeneva on 30 June 1954. The following year, on 16 December 1955, the Culoz - Bellegarde section was electrified[8] with 1.5 kV DC. From 10 June 1959, the Alpazur connection (Genève - Bellegarde - Grenoble - Veynes-Dévoluy - Digne) returning via the ligne des Alpes was operated with X4200 class panoramic railcars. Then on 31 May 1964, a first-class express train, Le Rhodanien, was put on the line linking Geneva to Marseille. 1969 saw the arrival Catalan-Talgo trains on the creation of a Trans-Europ-Express link between Geneva and Barcelona via Bellegarde, Chambéry et Grenoble on 1 June. In 1972, passenger trains were making up to 12 return journeys per day between Geneva and Grenoble. On 1 October 1972, X4500 class railcars went into service on the Valence - Geneva route via Grenoble, Chambéry et Bellegarde, then on 28 September 1975, first generation turbotrains (so-called 'ETGs') took over. They were so successful that they soon needed to be coupled in pairs to meet the demand.

    The arrival of the TGV[edit]

    A Geneva-bound TGV arrives

    The introduction of TGV services to Bellegarde-sur-Valserine on 22 September 1981, the completion of the autoroutes from Lyon to Geneva and the opening of the Mont Blanc Tunnel all greatly improved access to Bellegarde, enabling the town to develop through industrial restructuring which allowed Bellegarde to maintain unemployment below the national average.[14] Two daily services between Paris and Geneva were created, making Bellegarde the first town with less than 20,000 inhabitants to get a daily TGV link to Paris, although night trains to Paris were discontinued at the same time. However the advent of TGV services coincided with the decline of the Geneva – Barcelona Trans-Europ-Express; on 23 May 1982 the Catalan Talgo was replaced by a EuroCity service. and the IC 5642/3 train took over the name le Rhodanien. It linked Geneva to Marseille via Bellegarde, Chambéry, Grenoble, Valence and Avignon. In summer 1983, a TGV Paris – Geneva/Annecy was created, with trains being split or joined at Culoz. In the 1980s, as with many other French stations, services to Bellegarde were generally reduced or cancelled. After summer 1984, the La Rochelle – Saint-Gervais service was stopped. In 1985, Z 7500, Z 9500 and Z 9600 railcars were introduced on the Lyon – Genève/Evian/Saint-Gervais services, then in 1987, the Class BB 25200 locomotives (made available by the introduction of BB 22200 locos) were used with push-pull Corail trains between Lyon and Geneva. Service reductions continued in the 1990s, and apart from the long-distance service from Hendaye/Irun to Geneva, only regional TER services were left. In 2001, the Corail Lunéa Rhône-Océan Lyon–Quimper service was extended to Geneva with a stop in Bellegarde.

    In 1991, a project to bring Paris and Geneva closer was launched: to build a high speed line alongside the A40.[15] This operation, named the LGV des Titans was estimated at 12 billion francs (2 billion euros) which was much too expensive, so was abandoned in 1997[16] in favour of less costly projects. It was decided to upgrade the Ligne du Haut-Bugey instead.[17]

    Lines which converge on Bellegarde-sur-Valserine[edit]

    Several lines meet at Bellegarde-sur-Valserine station. The first line to arrive was the Lyon–Geneva railway in 1858. The line came from Paris and Geneva via Arlod and from Geneva via the Crêt d'Eau tunnel. At the end of the 19th century, three other lines reached Bellegarde-sur-Valserine, the Longeray-Léaz - Le Bouveret line via the Crédo tunnel in 1880, the Ligne du Haut-Bugey in 1882 and the Collonges-Fort-l'Écluse – Divonne-les-Bains railway serving the Pays de Gex in 1899.[18]

    Services[edit]

    The following services stop at Bellegarde:[19][20]

    See also[edit]

    References[edit]

    1. ^ "Plan tarifaire" (in French). unireso. 2019. Retrieved 25 July 2020.
  • ^ "Fréquentation en gares" (in French). SNCF. 28 November 2019. Retrieved 25 July 2020.
  • ^ SNCF (April 2009). "The future Interchange" (PDF) (in French). Archived from the original (PDF) on 30 August 2009. Retrieved 29 October 2009.
  • ^ a b Commune de Bellegarde-sur-Valserine. "Complément à propos de l'histoire" (in French). Archived from the original on 11 December 2009. Retrieved 30 October 2009.
  • ^ Musée du cheminot. "Dates historiques Ambarroises" (in French). Archived from the original on 13 November 2008. Retrieved 30 October 2009.
  • ^ "Plaquette 150 ans Bellegarde (page 7)" (PDF) (in French). 2008. Archived from the original (PDF) on 18 November 2008. Retrieved 31 October 2009.
  • ^ Napoléon III (10 June 1853). Bulletin des lois numéro 59 (in French). Retrieved 30 October 2009.
  • ^ a b c "Pyrimont-Chanay - Culoz à Bellegarde" (in French). Archived from the original on 20 July 2011. Retrieved 31 October 2009.
  • ^ "Plaquette 150 ans Bellegarde (page 6)" (PDF) (in French). 2008. Archived from the original (PDF) on 18 November 2008. Retrieved 31 October 2009.
  • ^ "Ligne du Haut-Bugey" (in French). Retrieved 30 September 2009.
  • ^ a b "Historique" (in French). Archived from the original on 15 October 2009. Retrieved 30 September 2009.
  • ^ CCBB. "De la gare SNCF au siège de la communauté de communes" (in French). Communauté de communes du Bassin Bellegardien. Archived from the original on 28 September 2009. Retrieved 29 October 2009.
  • ^ Le Progrès. "La gare de Bellegarde entièrement ravagée par un incendie" (in French). Retrieved 3 November 2009.
  • ^ Commune de Bellegarde-sur-Valserine. "Un peu d'histoire". Bellegarde-sur-Valserine. Retrieved 31 October 2009.
  • ^ Xavier de Villepin (21 February 1991). "Schéma directeur des TGV Mâcon-Bourg-en-Bresse-Genève". Xavier de Villepin. Retrieved 29 October 2009.
  • ^ 24 heures (21 June 1997). "TGV Genève-Mâcon : le mythe s'effondre". 24 heures (Suisse). Archived from the original on 9 July 2012. Retrieved 30 September 2009.{{cite web}}: CS1 maint: numeric names: authors list (link)
  • ^ La Tribune de Genève (4 July 1998). "TGV Mâcon-Genève: une étape indispensable". La Tribune de Genève. Retrieved 29 October 2009.[permanent dead link]
  • ^ "Ligne de Collonges-Fort-L'Ecluse à Nyon" (in French). Retrieved 25 Feb 2011.
  • ^ "Bellegarde (Ain) – La Plaine – Genève" (PDF) (in French). Bundesamt für Verkehr. 12 May 2020. Retrieved 25 July 2020.
  • ^ "St-Gervais/Evian/Genève - Bellegarde - Lyon" (PDF) (in French). SNCF. 12 July 2020. Archived from the original (PDF) on 26 July 2020. Retrieved 25 July 2020.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Bellegarde_station&oldid=1178409834"

    Categories: 
    Railway stations in Ain
    Railway stations in France opened in 1858
    LyonGeneva railway
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    CS1 French-language sources (fr)
    CS1 maint: numeric names: authors list
    All articles with dead external links
    Articles with dead external links from December 2019
    Articles with permanently dead external links
    Articles with short description
    Short description is different from Wikidata
    Coordinates on Wikidata
    Pages with no open date in Infobox station
    Pages using infobox station with deprecated parameters
     



    This page was last edited on 3 October 2023, at 13:52 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki