Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Planning  





1.2  Construction and delays  





1.3  Opening and start of operations  







2 Structure  



2.1  Passenger terminal  





2.2  Runway  







3 Airlines and destinations  





4 Statistics  





5 Incidents and accidents  





6 See also  





7 Footnotes  



7.1  Footnotes  





7.2  References  







8 External links  














Bicol International Airport






العربية
Bikol Central
Español


Română
Tagalog
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 13°0644N 123°4038E / 13.11222°N 123.67722°E / 13.11222; 123.67722
 

From Wikipedia, the free encyclopedia
 


Bicol International Airport


Pankinàban na Palayogan kan Bikol
Paliparang Pandaigdig ng Bikol
  • ICAO: RPLK
  • Summary
    Airport typePublic
    OwnerCivil Aviation Authority of the Philippines
    OperatorAboitiz InfraCapital Inc.
    ServesAlbay
    LocationDaraga, Albay, Philippines
    OpenedOctober 8, 2021; 2 years ago (2021-10-08)
    Elevation AMSL95 m / 313 ft
    Coordinates13°06′44N 123°40′38E / 13.11222°N 123.67722°E / 13.11222; 123.67722
    Map
    DRP/RPLK is located in Albay
    DRP/RPLK

    DRP/RPLK

    DRP/RPLK is located in Luzon
    DRP/RPLK

    DRP/RPLK

    DRP/RPLK is located in Philippines
    DRP/RPLK

    DRP/RPLK

    Runways
    Direction Length Surface
    m ft
    05/23[a] 2,500 8,202 Asphalt
    Statistics (2022)
    Passenger movements526,742
    Increase 708.64
    Aircraft movements5,790
    Increase 182.58
    Cargo (inkg)458,698
    Increase 217.98

    Source: CAAP[1]

    Bicol International Airport (IATA: DRP, ICAO: RPLK), also referred by some sources as Southern Luzon International Airport, is an airport serving the vicinity of Legazpi, the capital city of Albay and the regional center of Bicol Region, in the Philippines.

    Dubbed as the Philippines' "Most Scenic Gateway",[2] the airport is located in Daraga, an adjacent municipality of Legazpi. The 4.7 billion project is on a 200-hectare (490-acre) plateau 15 kilometers (9.3 mi) from Mayon Volcano. It replaced the old Legazpi Airport, which is only 2 to 3 kilometers (1.2 to 1.9 mi) from the BIA.[3]

    First planned in 1996 with initial construction beginning in 2008, the construction was repeatedly delayed until the airport was inaugurated on October 7, 2021. It is expected to handle an estimated 2.2 million passengers every year.[3] While the airport is billed as an international airport, it is classified as Class 1 principal domestic airport by the Civil Aviation Authority of the Philippines.[4]

    History

    [edit]

    Planning

    [edit]

    Plans for an international airport in Legazpi started in 1996.[5] In 1997, a study commissioned by the Japan International Cooperation Agency (JICA) indicated the need for expansion at four airports in the Philippines: namely Legazpi Airport, Bacolod City Domestic Airport, Mandurriao AirportinIloilo City and Daniel Z. Romualdez AirportinTacloban.[6]

    On March 4 and 5, 2006, officials in Daraga, where the airport would be constructed, discussed with the barangay captains and Leaders of barangays Alobo, Inarado, Kinawitan, Burgos, Martos territory, Velasco Hacienda, and Mabini over the conversion of agricultural lands into industrial lands for the airport. It is estimated to occupy at least 200 hectares (490 acres) of land, and many families could be displaced from the construction. It will be the first international airport to be built in Bicolandia and, according to Daraga Mayor Gerry Rodrigueza Jaucian, would be a testament to economic growth in the region and of the dreams of Bicolanos, as shown in the following excerpt from the Manila Times: "We’re grateful to the President for fulfilling the Bicolanos’ dream to have an international airport. This is the realization of our quest to become one of the booming regions in the country."[7]

    Construction and delays

    [edit]

    In July 2007, ordered the Department of Transportation and Communications (DoTC; now simply Department of Transportation), to fast-track the paperwork on the planned new airport.[8] Then-President Gloria Macapagal Arroyo released ₱85 million for its advance engineering study.[9] Tourism secretary Ace Durano has assured the allotment of ₱250 million for the purchase of land.

    The airport was originally scheduled for completion in 2014.[10] However, due to a construction delay, the project was expected to be finished at an unspecified date before 2016.[11] In June 2015, it was reported that the construction is 47% done and would be finished in July 2017,[12] but in July 2016 it was reported that the construction would be delayed further and would be finished in August 2018.[13]

    In September 2012, the Department of Budget and Management released ₱4.6 billion to support the public-private partnership (PPP) projects of the DOTC. Of the total, the airport will receive ₱2 billion to develop and fund the engineering of runways and taxiways.[14]

    Construction works for the runway, taxiway, apron, and fences were mostly left uncompleted in 2012, and budget was reverted to the national treasury.

    The construction was fast-tracked under the Duterte administration through the Build! Build! Build! infrastructure program. The groundbreaking ceremony of the airport was held on December 8, 2016,[15] with the construction of landside facilities that began in the same year.[5]

    On the night of September 28, 2017, people suspected to be members of the New People's Army committed arson to 11 heavy equipment that were used for the airport's construction.[16]

    After a delay in construction for more than a decade, Bicol International Airport was confirmed to be 50% complete in August 2018, with construction works in the runway, taxi apron, and perimeter fence being completed.[17] By January 2020, the airport was confirmed to be 62% complete, with the airport slated for completion by July 2020.[18] However, the July 2020 completion was delayed.

    Opening and start of operations

    [edit]
    President Rodrigo Duterte leading the inauguration of Bicol International Airport on October 7, 2021

    The airport was inaugurated by President Rodrigo Duterte on October 7, 2021,[3][2] with operations commencing the following day.[19] The airport will initially handle domestic operations, while international flights were expected to start by November 7.[20][21] However, there are currently no international flights servicing the airport as of March 2024.

    The first commercial flight to land at the airport, Philippine Airlines Flight 2923 from Manila, a flight operated by PAL Express and performed by a Dash 8 Q400, landed at 9:57 am PHT.[22] Cebu Pacific also started operating flights at the airport on the same day.[23] Flights operating at the airport were initially served by turboprops until Airbus A320 flights begun on May 1, 2022. Cebu Pacific landed its first A320 flight at the airport as Flight 321 at 4:39 am PHT,[24] while PAL landed its first A320 flight as Flight 2919 later that day.[25]

    Structure

    [edit]

    Passenger terminal

    [edit]
    Front area of the BIA Terminal Buildling

    The 13,680-square-meter (147,300 sq ft) passenger terminal has two levels and is designed to accommodate two million passengers annually. It features self-service check-in kiosks aside from 19 check-in counters, a lounge at the airport lobby, and two jet bridges.[26][27]

    EM Cuerpo handled the construction of the passenger terminal building along with the runway extension.[28]

    Runway

    [edit]

    The airport has a single runway which is 2,500 meters (8,200 ft) long and 45 meters (148 ft) wide, running in a direction of 05°/23°.[29] The runway is longer and wider than the now-defunct Legazpi Airport, allowing larger aircraft to land at the airport.[28] Moreover, the airport is capable of operating at night.[19]

    Airlines and destinations

    [edit]
    AirlinesDestinations
    Cebgo Cebu, Manila
    Cebu Pacific Cebu, Manila
    PAL Express Cebu, Manila

    Statistics

    [edit]

    Data from the Civil Aviation Authority of the Philippines (CAAP).[1]

    Year Passenger movements Aircraft movements Cargo movements (in kg)
    Domestic % change Domestic % change Domestic % change
    2021 65,139 Steady 2,049 Steady 144,253 Steady
    2022 526,742 Increase 708.64 5,790 Increase 182.58 458,698 Increase 217.98

    Incidents and accidents

    [edit]

    See also

    [edit]

    Footnotes

    [edit]

    Footnotes

    [edit]
    1. ^ Runway 05 is 2,050 meters (6,730 ft) long with a displaced threshold of 450 meters (1,480 ft) and 23 is 1,900 meters (6,200 ft) long with a displaced threshold of 600 meters (2,000 ft).

    References

    [edit]
    1. ^ a b "Aircraft, Passenger, and Cargo Movements". Civil Aviation Authority of the Philippines. Retrieved October 21, 2022.
  • ^ a b Parrocha, Azer (October 7, 2021). "Duterte opens PH's 'most scenic' airport in Bicol". Philippine News Agency. Retrieved October 7, 2021.
  • ^ a b c Quismorio, Ellson (October 7, 2021). "Duterte leads inauguration of Bicol int'l airport, 'most scenic' in PH". Manila Bulletin. Retrieved October 7, 2021.
  • ^ "CAAP Airport Directory" (PDF). Civil Aviation Authority of the Philippines. February 7, 2022. Archived from the original (PDF) on August 15, 2022. Retrieved September 12, 2022.
  • ^ a b Abadilla, Emmie V. (October 5, 2021). "P5-B Bicol international airport starts domestic operation Oct. 7". Manila Bulletin. Retrieved October 8, 2021.
  • ^ "Bacolod Airport (BCD), Negros Island, Philippines". Airport Technology. SPG Media Limited. January 6, 2007. Retrieved August 23, 2022.
  • ^ Barcia, Rhaydz B. (March 7, 2006). "Talks to construct airport under way". Manila Times. Archived from the original on November 8, 2007.
  • ^ "PGMA orders DOTC to fast-track preparations for Legazpi City's new airport 'on the plateau'". Philippine Information Agency. July 3, 2007. Archived from the original on September 27, 2007.
  • ^ "PGMA's Speech during the Infra Conference for Central Philippines Super Region". Office of the President. July 13, 2007. Archived from the original on October 15, 2007.
  • ^ "Roxas approves P2b for new Bicol airport". Manila Standard. May 26, 2012. Archived from the original on June 28, 2012.
  • ^ Adolfo, Jae Denise (December 19, 2014). "DOTC allocates P780.9 million for Bicol International Airport". BusinessMirror. Retrieved January 29, 2015.
  • ^ "Bicol International Airport to Become Operational in 2017". Philippine Flight Network. June 2015. Retrieved October 25, 2016.
  • ^ "Completion of Bicol International Airport Delayed to August 2018". Philippine Flight Network. July 2016. Retrieved October 25, 2016.
  • ^ Jiao, Diane Claire J. (September 14, 2012). "Budget for DoTC's PPP projects released". BusinessWorld Online Corp. Archived from the original on January 11, 2018. Retrieved January 11, 2018.
  • ^ Velasquez, Caleb (December 8, 2016). "President Duterte leads groundbreaking ceremony for Bicol International Airport development". Update Philippines. Retrieved October 8, 2021.
  • ^ Mier, Ma. April (September 29, 2017). "NPA rebels burn 11 heavy equipment at Bicol International Airport". Inquirer.net. Retrieved January 10, 2018.
  • ^ Valdez, Denise A. (August 28, 2018). "Bicol airport hits 50% completion, remains on track for 2020 opening". BusinessWorld. Retrieved October 8, 2021.
  • ^ Quadra-Balibay, Aurora (January 11, 2020). "LOOK: Bicol's most scenic gateway to Mayon Volcano opens in Albay this July 2020". Good News Pilipinas. Retrieved October 8, 2021.
  • ^ a b Cordero, Ted (October 8, 2021). "Bicol International Airport starts commercial operations". GMA News. Retrieved August 23, 2022.
  • ^ Arguelles, Mar S. (October 7, 2021). "New Bicol International Airport opens after 11-year construction". Philippine Daily Inquirer. Retrieved October 7, 2021.
  • ^ "Bicol International Airport to start domestic operations on Oct. 7". CNN Philippines. October 4, 2021. Archived from the original on October 6, 2021. Retrieved October 6, 2021.
  • ^ "LOOK: Very first commercial flight from the new Bicol International Airport". AirTraveller PH. October 8, 2021. Retrieved October 8, 2021.
  • ^ Abadilla, Emmie V. (October 8, 2021). "CEB starts operating at Bicol International Airport". Manila Bulletin. Retrieved October 8, 2021.
  • ^ "Cebu Pacific deploys A320 to Legazpi". TTR Weekly. May 5, 2022. Retrieved November 18, 2022.
  • ^ Barcia, Raydes (April 25, 2022). "PAL announces return of airbus flight in Bicol International Airport in May". Rapid News PH. Retrieved August 23, 2022.
  • ^ Bueno, Feliz Grace (October 7, 2021). "Bicol Welcomes the World: Welcome to the newly constructed Bicol Int'l Airport". Pinoy Builders. Retrieved October 8, 2021.
  • ^ "Bicol International Airport". Civil Aviation Authority of the Philippines. Retrieved November 19, 2022.
  • ^ a b "Bicol International Airport, Legazpi". Airport Technology. SPG Media Limited. February 18, 2021. Retrieved August 23, 2022.
  • ^ "Bicol Airport". SkyVector. Retrieved August 23, 2022.
  • ^ Barcia, Rhaydz (January 10, 2018). "Plane carrying Bangko Sentral employees makes emergency landing at Bicol airport". The Manila Times. Retrieved January 11, 2018.
  • ^ "'No survivors': Bodies of passengers of crashed Cessna plane found in Albay". Rappler. February 23, 2023. Retrieved February 23, 2023.
  • ^ Yu, Lance Spencer (October 2, 2023). "'BOMB??': How a crumpled piece of paper shut down the Bicol airport for hours". Rappler. Retrieved October 2, 2023.
  • [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Bicol_International_Airport&oldid=1233446004"

    Categories: 
    Airports in the Philippines
    Airports established in 2021
    2021 establishments in the Philippines
    Buildings and structures in Albay
    Transportation in Albay
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Pages with non-numeric formatnum arguments
    Articles with short description
    Short description is different from Wikidata
    Use Philippine English from January 2023
    All Wikipedia articles written in Philippine English
    Use mdy dates from October 2021
    Articles containing Bikol-language text
    Articles containing Filipino-language text
    Coordinates on Wikidata
     



    This page was last edited on 9 July 2024, at 03:11 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki