Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Construction  





2 History  





3 2020/2021 rebuild  





4 References  





5 External links  














Bletchley Flyover







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 51°5932N 0°447W / 51.99222°N 0.73528°W / 51.99222; -0.73528
 

From Wikipedia, the free encyclopedia
 


Bletchley Flyover
The flyover from Bletchley railway station on 26 October 2017
Coordinates51°59′32N 0°44′7W / 51.99222°N 0.73528°W / 51.99222; -0.73528
OS grid referenceSP 868 335
CarriesVarsity line
CrossesWest Coast Main Line
LocaleBletchley
OwnerNetwork Rail
Characteristics
Total length605 metres (1,985 ft)
No. of spans37
Rail characteristics
No.oftracks2
Track gauge1,435 mm (4 ft 8+12 in)
ElectrifiedNo
History
Opened1959 (1959)
Rebuilt2020–2021
Location
Map

The Bletchley Flyover is a railway viaduct that crosses the West Coast Main Line (WCML) just south of Bletchley railway stationinMilton Keynes, England. It was originally a reinforced concrete railway viaduct that carried the former Varsity line between Oxford and Cambridge from 1959 until its closure in 1968. The flyover was retained, but largely unused until 2021, when the East West Rail Alliance demolished then rebuilt the structure. It reopened for engineering use in early 2022.

Construction[edit]

The original structure was composed of 37 concrete spans,[1] resting on concrete piers. It is 605 metres (1,985 ft) long.[2] Most of the spans are beam-shaped; two are double-length arches.[citation needed] Electrification pads were provided when the flyover was first built, despite there being no plans to electrify the line.[citation needed]

History[edit]

In 1959, the Bletchley Flyover was opened to carry the Varsity line over the West Coast Main Line (WCML) as part of the British Rail Modernisation Plan.[3][4] The plan proposed to develop the Varsity Line as a freight link from the East Coast ports to South Wales, capable of handling up to 2,400 wagons of coal class traffic and empties daily.[5] However, following British Railways deciding not to proceed with the Swanbourne sidings plan, the line saw little use, with most freight traffic taking other routes.[6]

The Varsity line closed to passengers on 1 January 1968; it remained open to goods traffic until October 1993, when the bridge was mothballed.[2][7] The flyover was returned to use in 2006 along with a mile of track west of Bletchley to a loop at the Newton Longville Brickworks landfill site.[8]

2020/2021 rebuild[edit]

As part of the East West Rail project that will reopen the Oxford – Cambridge route, work to replace 14 of the spans began in April 2020.[7][9][10] Sections beside and over the WCML were removed in April and May.[11][12] The arches crossing Buckingham Road (on the east side of WCML) started being removed on 5 July 2020.[13] "The final span was lifted out by crane in October and the last of the supporting piers and pillars were removed over the weekend of 9-10 January 2021".[14] At the early May 2021 holiday, 103 concrete girders were lifted into place to provide the bridge deck over the main line.[15]

During summer 2021, a new structure was built for use by East West Rail, in the form of a box tunnel around the WCML;[16] by February 2022, 1.5 km (0.93 mi) of track had been installed over the new flyover, enabling engineering trains to reach the eastern end of the construction site.[17]

The renovation project includes a plan to construct high level platforms for Bletchley station, just after the eastern end of the flyover.[14] These platforms will serve East West Rail (only).

References[edit]

  1. ^ "Biggest cranes in Europe spotted in Milton Keynes ready for 295-tonne upgrade". Milton Keynes Citizen. 4 May 2020. Archived from the original on 28 July 2020.
  • ^ a b "Class 56 special over doomed Bletchley flyover line". Rail Magazine. No. 200. 12 May 1993. p. 6.
  • ^ "The Bletchley Flyover". The Railway Magazine. No. 691. November 1958. p. 737.
  • ^ Biggest cranes in Europe spotted in Milton Keynes ready for 295-tonne upgrade Milton Keynes Citizen 4 May 2020
  • ^ Klapper, C.F. (1976). London's Lost Railways. London: Routledge & Kegan Paul. p. 101. ISBN 0-710083-78-5.
  • ^ Fiennes, G F (1973). "7. Chief Operating Officer, B.R.". I tried to run a Railway (Revised ed.). London: Ian Allan Publishing. ISBN 9780711004474.
  • ^ a b "Bletchley Flyover Project". Railways Illustrated. No. July 2020. p. 737.
  • ^ "Bletchley flyover reconstruction begins". Modern Railways. No. 861. June 2020. p. 18.
  • ^ Britain’s East-West Rail project makes progress International Railway Journal 4 May 2020
  • ^ Three huge cranes remove flyover at Bletchley Rail Engineer 6 July 2020
  • ^ Kevin Nicholls (4 May 2020). "Biggest cranes in Europe spotted in Milton Keynes ready for 295-tonne upgrade [as] 60-year-old Bletchley Flyover gets a makeover ahead of Milton Keynes's new East-West rail link". Milton Keynes Citizen. Retrieved 5 May 2020.
  • ^ Mark Cuzner (July 2020). "EWR2 Project Newsletter - July 2020". East West Rail Alliance. Retrieved 7 August 2020.
  • ^ Sally Murrer (2 July 2020). "Three of UK's largest cranes heave out sections of concrete railway flyover in Milton Keynes". Milton Keynes Citizen. Retrieved 26 July 2020.
  • ^ a b Cuzner, Mark, ed. (January 2021). "EWR2 Project Newsletter – Winter 2020/2021". East West Rail Alliance.
  • ^ "Bank holiday rail upgrades complete between London and Scotland" (Press release). Network Rail. 4 May 2021.
  • ^ Cuzner, Mark, ed. (November 2021). "EWR2 Project Newsletter – Autumn 2021". East West Rail Alliance. ("Project Updates")
  • ^ Cuzner, Mark, ed. (February 2022). "EWR2 Project Newsletter – Winter 21/22". East West Rail Alliance. (Project Progress)
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Bletchley_Flyover&oldid=1226252256"

    Categories: 
    Bletchley
    Bridges completed in 1959
    Buildings and structures in Milton Keynes
    Concrete bridges in England
    Rail transport in Milton Keynes
    Railway bridges in Buckinghamshire
    1959 establishments in England
    East West Rail
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Use British English from July 2020
    Use dmy dates from July 2020
    Coordinates on Wikidata
    Articles with OS grid coordinates
    All articles with unsourced statements
    Articles with unsourced statements from July 2020
    Commons category link from Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 29 May 2024, at 13:36 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki