Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Line description  





2 History  





3 Station listing  





4 References  





5 External links  














Blue Line (Sacramento RT)







Add links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Route map: 


From Wikipedia, the free encyclopedia
 


Blue Line
Overview
OwnerSacramento Regional Transit District
LocaleSacramento, California
Termini
  • Cosumnes River College (south)
  • Stations28
    Service
    TypeLight rail
    SystemSacramento RT Light Rail
    Daily ridership18,435 (Q2 2018)[1]
    History
    OpenedMarch 12, 1987; 37 years ago (1987-03-12) (as Watt/I-80–Downtown–Butterfield line)
    Technical
    Number of tracksMostly 2, 1 track across the American River and in the median of Interstate 80
    CharacterMostly at-grade
    Track gauge4 ft 8+12 in (1,435 mm) standard gauge
    ElectrificationOverhead line750 V DC
    Operating speed55 mph (89 km/h)[2]

    Route map

    Map Blue Line highlighted in blue


    Watt/I-80
    Bike locks Bus interchange Parking

    Watt/I-80 West
    Parking

    Roseville Road
    Parking

    I-80 (1961).svg I-80

    single track
    double track

    Amtrak

    Marconi/Arcade
    Bus interchange Parking

    Maintenance Facility

    Swanston
    Parking

    Royal Oaks
    Bus interchange

    Arden/Del Paso
    Bike locks Bus interchange Parking

    Globe
    Bus interchange

    Old North Sacramento
    (planned)

    California 160.svg SR 160

    Dos Rios
    (planned)

    Amtrak

    Alkali Flat/La Valentina
    Bus interchange

    12th &I ( southbound)

    Cathedral Square (10th &K11th &K)

    St. Rose of Lima Park (9th &K)
    Bus interchange

    Gold
    Green

    7th &K
    (closed 2016)

    7th & Capitol8th & Capitol

    8th &O
    Bus interchange

    Archives Plaza

    R Street Yard

    13th Street

    16th Street
    Bus interchange

     Gold 

    Broadway
    Bus interchange

    4th Avenue/Wayne Hultgren
    Bus interchange

    City College
    Bike locks Bus interchange

    Fruitridge
    Bus interchange

    47th Avenue
    Parking

    Florin
    Bike locks Bus interchange Parking

    Meadowview
    Bike locks Bus interchange Parking

    Morrison Creek

    Morrison Creek

    Amtrak & ACE
    (2023)

    Franklin
    Parking

    Center Parkway

    Cosumnes River College
    Bus interchange Parking

    Other service sharing track

    Multiple services sharing track

    Handicapped/disabled access All stations are accessible except for 12th &I southbound
  • talk
  • edit
  • The Blue Line is a light rail line in the Sacramento Regional Transit District (RT) system. It runs primarily north–south in Sacramento between Watt/I-80 and Cosumnes River College. Along the route, the Blue Line serves North Highlands, North Sacramento, Downtown and South Sacramento. Portions of the Blue Line run along the original initial alignment between Watt/I-80 and 16th Street stations.

    Line description[edit]

    The Blue Line begins at its northern terminus, the Watt/I-80 station. From there it initially travels southwest in the median of I-80, utilizing a bridge from an abandoned freeway project, then parallels Roseville Road before turning westward paralleling Arden Way in North Sacramento. (It passes up the Siemens plant nearby.) Then the line turns southwest again running in the median of Del Paso Boulevard, merges into a single track crossing the 12th Street viaduct (Highway 160) over the American River. Reaching downtown, the Blue Line goes back to two tracks going south on 12th, turns west on K Street, and splits into one-way tracks for 7th and 8th Streets where it joins the Gold and Green Lines. It then turns westward on O Street, southward on 12th, then eastward in an alley paralleling Q and R Streets. After passing the 16th Street station, the Blue Line splits from the Gold Line (the Green Line terminates at 13th Street station), crossing under the Bee Bridge before going south in its own right-of-way into South Sacramento. It then jogs eastward along Cosumnes River Boulevard before crossing it and reaching its southern terminus at Cosumnes River College station.

    History[edit]

    The first light rail line of the RT opened March 12, 1987.[3] Initial service commenced between Watt/I-80 and 8th & O stations only for the first six months. It was extended to Butterfield that same year on September 5.[3] In all, it was an 18.3-mile (29.5 km) route between Watt/I-80 station in North Sacramento, through downtown, and continuing east on Folsom Blvd. to Butterfield Way station. It was built at a cost of $176 million ($472 million adjusted for inflation), which included the cost of vehicles and maintenance and storage facilities. Approximately $94 million of the funds needed for the project had been reallocated from a canceled plan to build a freeway to bypass I-80 Business.[4]

    Much of the line, when it was first built, was single-tracked, though improvements over the 1990s allowed much of the original system to be double-tracked. The line was built mainly using portions of the Sacramento Northern Railroad and Sacramento Valley Railroad right-of-ways, coupled with use of structures of an abandoned freeway project.[citation needed] A limited portion of the route runs on streets, mainly in downtown Sacramento.

    The line became more popular than anyone anticipated, necessitating further expansions and improvements to the system.

    Sacramento RT has proposed extending the light rail system 11.2-mile (18.0 km) south to the town of Elk Grove in phases.

    The first phase of the southern extension opened on September 26, 2003, with 6.3 miles (10.1 km) added from 16th Street stationtoMeadowview Road. The extension added seven new stations to the system and runs parallel to a railroad right-of-way. The light rail system was reconfigured in June 2005 with the South Line connected to the Watt I-80/Downtown Line and designated as the Blue Line.

    A train bound for Watt/I-80 in Downtown Sacramento, July 2019

    The second phase of the southern extension opened more than a decade later on August 24, 2015, with 4.3 miles (6.9 km) added from Meadowview Road to Cosumnes River College.[5] The extension added seven new stations to the system. A fourth station, Morrison Creek, will open as an infill station after the adjacent land had been developed.[6] Sacramento RT added a large parking structure at Cosumnes River College to attract riders from southern Sacramento County and boost ridership.[7][8][9]

    A third planned phase which would extend the line from its current southern terminus to Elk Grove about 2 miles along Bruceville Road is on hold indefinitely due to a lack of funding. Land use and station accessibility must be improved to qualify the extension for Federal Transit Administration (FTA) grant funding. Currently construction on this project is not expected to begin until after 2040.[10][7][9][11]

    An additional infill station on the line called Dos Rios station is planned between the Globe and Alkali Flat/La Valentina stations in the Dos Rios Triangle neighborhood of North Sacramento. The station is planned as part of a new housing development project that is funded by California's cap and trade system, with an opening date set for around 2023.[12]

    Station listing[edit]

    The following table lists the current stations of the Blue Line, from north to south.

    Key
    Closed station
    Station Opened Transfers[13]
    Watt/I-80 March 12, 1987
  • Bus transport Placer County Transit: 10
  • Watt/I-80 West
    Roseville Road
    Marconi/Arcade Bus transport Sacramento Regional Transit: 25, 86, 87, SmaRT Ride Natomas-North Sacramento
    Swanston
    Royal Oaks Bus transport Sacramento Regional Transit: 13, 23
    Arden/Del Paso Bus transport Sacramento Regional Transit: 13, 15, 19, 23, 88, 113
    Globe
    Alkali Flat/La Valentina Bus transport Sacramento Regional Transit: 33, 129
    12th &I
    • Bus transport Sacramento Regional Transit: 129, E10, E11, E12, E13, E14, E15, E16, E17, E18
  • Bus transport Roseville Transit: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10[14]
  • Cathedral Square
    (westbound: 10th & K, eastbound: 11th &K)
    • Bus transport Sacramento Regional Transit: 30, 38, 62
  • Bus transport North Natomas Jibe
  • Bus transport Yolobus: 42A, 42B, 43, 43R, 230
  • St. Rose of Lima Park
    (eastbound: 9th &K)
    • Bus transport Sacramento Regional Transit: 30, 38, 62, 86, 88, 142 (Airport Express)
  • Bus transport North Natomas Jibe
  • Bus transport Yolobus: 42A, 42B, 43, 43R, 230
  • St. Rose of Lima Park
    (southbound: 7th &K)
    Closed September 30, 2016
    7th & Capitol (southbound)
    8th & Capitol (northbound)
  • Bus transport Sacramento Regional Transit: 11, 30, 38, 51, 62, 86, 88, 102, 103, 106, 107, 109, 129, 134, 142 (Airport Express), E10, E11, E12, E13, E14, E15, E16, E17, E18
  • Bus transport North Natomas Jibe
  • Bus transport Roseville Transit: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10
  • Bus transport Yolobus: 42A, 42B, 43, 43R, 230
  • 8th &O
  • Bus transport Sacramento Regional Transit: 11, 51, 102, 103, 106, 107, 109, E10, E11, E12, E13, E14, E15, E16, E17, E18
  • Bus transport North Natomas Jibe
  • Bus transport Yolobus: 42A, 42B, 43, 43R, 230
  • Archives Plaza
    13th Street
    16th Street September 5, 1987
  • Bus transport Sacramento Regional Transit: 106, 109, E10, E11, E12, E13, E14, E15, E16, E17, E18
  • Broadway September 26, 2003 Bus transport Sacramento Regional Transit: 51, 62
    4th Avenue/Wayne Hultgren Bus transport Sacramento Regional Transit: 62
    City College Bus transport Sacramento Regional Transit: 11, SmaRT Ride Franklin−South Sacramento
    Fruitridge Bus transport Sacramento Regional Transit: 61, SmaRT Ride Franklin−South Sacramento
    47th Avenue Bus transport Sacramento Regional Transit: SmaRT Ride Franklin−South Sacramento
    Florin Bus transport Sacramento Regional Transit: 81, SmaRT Ride Franklin−South Sacramento
    Meadowview Bus transport Sacramento Regional Transit: 56, 105, SmaRT Ride Franklin−South Sacramento
    Morrison Creek August 29, 2021
    Franklin August 24, 2015 Bus transport Sacramento Regional Transit: SmaRT Ride Franklin−South Sacramento
    Center Parkway Bus transport Sacramento Regional Transit: SmaRT Ride Franklin−South Sacramento
    Cosumnes River College Bus transport Sacramento Regional Transit: 56, 67, 68, E110, E114, E115, E116, SmaRT Ride Franklin−South Sacramento

    References[edit]

    1. ^ RT Quarterly Ridership Report (PDF) (Report). Sacramento RT. June 2018. Retrieved December 12, 2018.
  • ^ "Sacramento Regional Transit Light Rail Fact Sheet" (PDF). Sacramento Regional Transit District. April 2016. Retrieved July 17, 2022.
  • ^ a b Sebree, Mac (February 1988). "Sacramento Light Rail". Pacific RailNews, pp. 16–17. Glendale: Interurban Press.
  • ^ Bernstein, Dan; Lewis, Dan (February 15, 1987). "Getting there getting tougher". Sacramento Bee. pp. A1, A28. Retrieved June 6, 2023 – via Newspapers.com.
  • ^ Bizjack, Tony (August 24, 2015). "Transit advocates, riders celebrate opening of light rail's south line". The Sacramento Bee. Retrieved February 2, 2016.
  • ^ Masui, Alane (August 22, 2015). "RT Celebrates Grand Opening of Blue Line to Cosumnes River College Light Rail Extension" (Press release). Sacramento Regional Transit District. Retrieved February 2, 2016.
  • ^ a b "Information Center - Blue Line". Sacramento Regional Transit District. Archived from the original on August 20, 2013. Retrieved July 30, 2013.
  • ^ Official Blue Line extension website: "In order to compete for Federal funding, terminus stations (such as the one proposed at Cosumnes River College) need to provide sufficient parking to claim ridership. A computer model generates the anticipated demand for spaces required at each of the stations. The model calculated a demand of 2,000 spaces for the College." Archived August 20, 2013, at the Wayback Machine. Accessed April 14, 2013
  • ^ a b South Sacramento Corridor Phase 2 Project
  • ^ "2020 MTP/SCS". Sacramento Area Council of Governments. Retrieved July 17, 2022.
  • ^ "SacRT Initiatives – Sacramento Regional Transit District". Retrieved January 8, 2020.
  • ^ Moffitt, Bob (December 21, 2018). "New Light Rail Station Coming To North Sacramento". Capital Public Radio. Retrieved December 23, 2018.
  • ^ "SacRT System Map" (PDF) (Map). Sacramento Regional Transit District. August 29, 2021. Retrieved July 16, 2022.
  • ^ "Roseville Transit Commuter Bus Services Guide" (PDF). Roseville Transit. April 1, 2020.
  • External links[edit]

    KML is from Wikidata

    Retrieved from "https://en.wikipedia.org/w/index.php?title=Blue_Line_(Sacramento_RT)&oldid=1227443128"

    Categories: 
    Sacramento Regional Transit District
    Transportation in Sacramento, California
    Public transportation in Sacramento County, California
    Passenger rail transportation in California
    Light rail in California
    Railway lines opened in 1987
    Railway lines in highway medians
    1987 establishments in California
    750 V DC railway electrification
    Hidden categories: 
    Webarchive template wayback links
    Articles with short description
    Short description is different from Wikidata
    Use American English from April 2024
    All Wikipedia articles written in American English
    Use mdy dates from April 2024
    All articles with unsourced statements
    Articles with unsourced statements from May 2018
    Commons category link is on Wikidata
    Pages using gadget WikiMiniAtlas
    Articles using KML from Wikidata
    Pages using the Kartographer extension
     



    This page was last edited on 5 June 2024, at 19:06 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki