[edit]Siphoning operations draining the reservoir behind Boardman Dam in July 2017; this operation realigned the watercourse under the Robbins Bridge (foreground).Robbins Bridge in Garfield Township, which carries Cass Road over the river, was constructed in 2016.The Boardman River in downtown Traverse City along the Sara Hardy Farmer's Market, 2015The Boardman River near its mouth in downtown Traverse City; the land on the banks of the river in this location is urbanized, including some public greenspace.
Prior to European settlement, the river was known as adaawewiziibi, roughly translating from Ojibwe as "river of trade".
In the year 1847, Captain Horace Boardman of Naperville, Illinois, purchased land at the head of Grand Traverse Bay, at a river then known as the Ottaway River.[4] With the arrival of Hannah-Lay in the 1850s, the river was colloquially, and later officially, renamed the Boardman River. Recent movements have sought to change the name of the river to its original name, either in full or abbreviated (i.e. Boardman–Ottaway River)[5][1]
Later in 1800s, as Traverse City was first being settled, the Union Street Dam was being built by the Hannah-Lay Company as a saw mill. Around this time, citizens were dumping sewage into the Boardman, which was causing severe health problems. The lake became very industrialized. The western shore of the lake was used for a log rollaway and rail yard on the Great Lakes Central Railroad, up until the early 2000s.[6] Additionally, five dams were built along the main course of the river.
Five dams were built along the main course of the Boardman River, in upstream order: the Union Street Dam, Sabin Dam, Boardman Dam, Keystone Dam, and Brown Bridge Dam.[7] In 1961, the Keystone Dam was washed out after flooding upstream.[8] On October 6, 2012, while preparing to demolish Brown Bridge Dam, the highest on the river and largest in terms of impoundment, a temporary structure put in place to facilitate drawdown at the dam was breached, flooding the river valley.[9] In June 2014 the Michigan DEQ issued a report identifying erosion around the temporary drawdown structure as the likely cause of the failure.[10] Brown Bridge Dam removal was completed in January 2013 and resulted in the reestablishment of 2.5 miles of river channel.[7]
In 2017, Boardman Dam and its impoundment structure were demolished, along with an adjacent one-lane bridge carrying Cass Road over the river.[11][12] A new bridge for Cass Road over the new future river channel was completed the previous year. With the removal of this dam, the watercourse was realigned under the new bridge for the first time.[13]
Sabin Dam was fully removed by the end of 2018.[14] This leaves Union Street Dam as the only remaining impoundment on the main course of the Boardman River. In early June 2024, light construction on the Union Street Dam began.[15] Some trees and the small building on the dam were removed in preparation for the heavy construction in July. The process is expected to be completed in 2027.
The Boardman River follows a rather unusual course. The river rises from streams and swamps in Kalkaska County, flowing generally west–southwest to west until reaching Blair TownshipinGrand Traverse County, where the river turns due north. Upon exiting Boardman Lake, water flows northwesterly, before turning back due east, forming a U-shape around downtown Traverse City. The river then angles northeast, finally entering the west arm of Grand Traverse Bay.
^U.S. Geological Survey. National Hydrography Dataset high-resolution flowline data. The National MapArchived March 29, 2012, at the Wayback Machine, accessed November 21, 2011