Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 History  



1.1  Construction and independent operation  





1.2  Subsequent history  







2 Stations  





3 Ferries  





4 References  














Bristol and South Wales Union Railway






Cymraeg
Deutsch
Español
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


A commemorative plaque at Bristol Temple Meads.
  • t
  • e
  • Bristol & South Wales
    Union Railway

    Portskewett Junction

    Portskewett Pier

    Ferry across
    River Severn

    New Passage Pier

    New Passage

    Severn Beach

    New Passage Halt

    Cross Hands Halt

    Pilning
    High Level │ Low Level

    Pilning Junction

    Almondsbury Tunnels

    Patchway

    Filton

    Horfield

    Ashley Hill

    Narroways Hill Junction

    Stapleton Road

    Lawrence Hill

    Bristol Temple Meads

    The Bristol and South Wales Union Railway was built to connect Bristol, England, with south Wales. The route involved a ferry crossing of the River Severn but was considerably shorter than the alternative route through Gloucester. The ferry was replaced by the Severn Tunnel in 1886 but part of the route continues to be used, forming parts of the Cross-Country Route and the South Wales Main Line.

    History[edit]

    Construction and independent operation[edit]

    A "Bristol and South Wales Junction Railway" was authorised by Act of Parliament in 1846. Isambard Kingdom Brunel surveyed a route across the Severn and the ferry at New Passage was purchased, but the line failed to raise enough money so was not built. The "Bristol, South Wales and Southampton Union Railway" proposed in 1854 to carry a line through the centre of Bristol and along the Avon Gorge to New Passage, where a train ferry would cross the water. This became the "Bristol and South Wales Union Railway" (B&SWUR) which received its Act on 27 July 1857 but using a route to the east and north of Bristol. Brunel died in 1859 and the works were completed by Robert Pearson Brereton.[1]

    Construction started in 1858 and the single-track ft (2,134 mm) broad gauge line opened from South Wales Junction, half a mile east of Temple Meads, as far as the landward end of New Passage Pier on 8 September 1863, a distance of 11 miles (18 km). The distance by rail between Bristol and Cardiff was reduced from 94 miles (151 km) to 38 miles (61 km).[2] Stations were opened at Lawrence Hill, Stapleton Road, Filton, Patchway, Pilning and New Passage. The short section on the opposite side of the Severn officially opened on 1 January 1864. On 13 August 1864 Ashley Hill station was opened between Stapleton Road and Filton.

    In 1868 the B&SWUR was amalgamated with the GWR which had operated its trains from the outset.[3]

    Subsequent history[edit]

    Under GWR ownership, the Portskewett branch was converted to 4 ft 8+12 in (1,435 mm) standard gauge on 13 May 1872 along with all the other broad gauge lines on that side of the river. The Bristol section was closed for one day on 8 August 1873 and reopened the following day as a standard gauge line.

    On 1 October 1874 a junction was put in at Narroways Hill, just north of Stapleton Road railway station, to connect the GWR with the Clifton Extension Railway, a joint venture with the Midland Railway to serve the affluent Clifton district. The line from Temple Meads to Narroways Hill Junction was doubled at the same time.[3]

    Work had started on the Severn Tunnel a little way downstream from New Passage in 1872 and sidings were laid at both Portskewett and New Passage in connection with sinking shafts to the tunnel workings. On 29 May 1886 a curve was opened near South Wales Junction (between Dr Day's Junction and North Somerset Junction) to allow trains to run directly from London to the new Tunnel. The line between Narroways Hill Junction and Patchway was also doubled to carry the heavier traffic. Just short of Pilning railway station the new route diverged to south and a new station was built. The ferry and Pilning-New Passage line ceased operation after 30 November 1886 and the tunnel opened for passenger trains the following day, although goods trains had already been using the new route. A new 1,440 yards (1,320 m) single track tunnel alongside the old tunnel at Almondsbury carried the Up line on a more gentle gradient from 1887.[1] The increased traffic caused the line from Dr Day's Junction to Narroways Hill Junction to be widened to four tracks in 1891.[3]

    The B&SWUR had been authorised to construct a line from Pilning to a proposed new dock at Avonmouth in 1862, but neither the dock nor railway was built. The GWR reopened a section of the old line for goods traffic on 5 February 1900, this ran from Pilning to New Passage and then connected with a new route to Avonmouth railway station. Passenger trains ran from Avonmouth as far as a new Severn Beach railway station from 10 July 1922, and continued to new stations at New Passage and Pilning (known as "Pilning Low Level") from 9 July 1928. The service was withdrawn from 23 November 1964.[1]

    Stations[edit]

    Ferries[edit]

    Two steam ferries had crossed the River Severn near Aust for many years before the coming of the railway. The upper ferry between Old Passage and Beachley continued as before but the lower ferry, about 2 miles (3.2 km) away at New Passage, was sold to the Bristol and South Wales Junction Railway in 1847. The Bristol and South Wales Union Railway eventually built new piers for the ferry, that at New Passage being 546 yards (499 m) long and that at Portskewett just 258 yards (236 m). On the night of 21 May 1881 Portskewett Pier was badly damaged by a fire; it was reopened on 16 June 1881, during which time a limited train service between Bristol and Cardiff was operated over the Bristol and Gloucester line of the Midland Railway.[1]

    A steam ferry, the Saint Pierre had been built by Pride and Williams for the New Passage crossing in 1825 and it worked there until 1831. The B&SWUR bought a new steamer, the Gem in 1863 but it proved unsuitable and was soon replaced by the Relief. John Bland, a carrier and shareholder in the railway, was contracted to operate the ferry. The next vessel purchased was the Dragon Fly, this had been used by the contractors to build the piers but was too small to work as the ferry. Instead, two paddle tugs, the Ajax and the Atlas were hired in to cover for the Relief.

    A new paddle steamer arrived in June 1864, named Christopher Thomas after the chairman of the B&SWUR, it had been built for the company by Henderson, Coulborn and CompanyatRenfrewinScotland. A slightly larger vessel named the Chepstow arrived from the same shipyard on 11 February 1875.[1] These two continued in service until the Severn Tunnel was opened in 1886. They were sold to WS Ogden at Cardiff in 1880, the Chepstow being renamed the Rover.[4] The funnels were generally painted black with a red band.[1]

    Paddle steamer[1] Period Length Gross tons HP
    Gem 1863 122.2 feet (37.2 m) 100 50
    Relief 1863–1864 117.6 feet (35.8 m) 163 70
    Christopher Thomas 1864–1886 132.0 feet (40.2 m) 159 100
    Chepstow 1875–1886 140.6 feet (42.9 m) 188 100

    References[edit]

    1. ^ a b c d e f g Norris, John (1985). The Bristol & South Wales Union Railway. Oakham: Railway and Canal Historical Society. ISBN 0-901461-38-5.
  • ^ Cragg, Roger (1997). "Bristol and South Wales Union Railway". Wales and West Central England. Civil Engineering Heritage. London: Institution of Civil Engineers. pp. 136–7. ISBN 0-7277-2576-9.
  • ^ a b c MacDermot, E T (1931). History of the Great Western Railway, volume II 1863-1921. London: Great Western Railway.
  • ^ Duckworth, Christian Leslie Dyce; Langmuir, Graham Easton (1948). Railway and other steamers. Prescot: T Stephenson and Sons.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Bristol_and_South_Wales_Union_Railway&oldid=1190550906"

    Categories: 
    Bristol and South Wales Union Railway
    7 ft gauge railways
    Great Western Railway constituents
    Rail transport in Bristol
    Rail transport in Gloucestershire
    Railway lines in Wales
    Ferry companies of England
    Ferry companies of Wales
    Railway companies established in 1857
    Railway lines opened in 1864
    Railway companies disestablished in 1868
    Standard gauge railways in Wales
    Standard gauge railways in England
    British companies established in 1857
    1857 establishments in Wales
    British companies disestablished in 1868
    Hidden categories: 
    Use dmy dates from December 2023
    Use British English from June 2013
    Commons category link is on Wikidata
    Articles with VIAF identifiers
    Articles with LCCN identifiers
     



    This page was last edited on 18 December 2023, at 14:55 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki