1 BOT framework  





2 BOOT Framework  





3 Alternatives to BOT  





4 Economic theory  





5 See also  





6 References  














Buildoperatetransfer






العربية
 / Bân-lâm-gú
Deutsch
فارسی
Français
Bahasa Indonesia
עברית


Polski
Português
Türkçe
Tiếng Vit

 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 

(Redirected from Build-operate-transfer)

Build–operate–transfer (BOT) or build–own–operate–transfer (BOOT) is a form of project delivery method, usually for large-scale infrastructure projects, wherein a private entity receives a concession from the public sector (or the private sector on rare occasions) to finance, design, construct, own, and operate a facility stated in the concession contract. The private entity will have the right to operate it for a set period of time. This enables the project proponent to recover its investment and operating and maintenance expenses in the project.

BOT is usually a model used in public–private partnerships. Due to the long-term nature of the arrangement, the fees are usually raised during the concession period. The rate of increase is often tied to a combination of internal and external variables, allowing the proponent to reach a satisfactory internal rate of return for its investment.

Countries where BOT is prevalent are Thailand, Turkey, Taiwan, Bahrain, Pakistan, Saudi Arabia,[1] Israel, India, Iran, Croatia, Japan, China, Vietnam, Malaysia, Philippines, Egypt, Myanmar and a few US states (California, Florida, Indiana, Texas, and Virginia). However, in some countries, such as Canada, Australia, New Zealand and Nepal,[2] the term used is build–own–operate–transfer (BOOT). The first BOT was for the China Hotel, built in 1979 by the Hong Kong listed conglomerate Hopewell Holdings Ltd (controlled by Sir Gordon Wu).

BOT framework

[edit]

BOT finds extensive application in infrastructure projects and public–private partnership. In the BOT framework a third party, for example the public administration, delegates to a private sector entity to design and build infrastructure and to operate and maintain these facilities for a certain period. During this period, the private party has the responsibility to raise the finance for the project and is entitled to retain all revenues generated by the project and is the owner of the regarded facilities. The facility will be then transferred to the public administration at the end of the concession agreement,[3] without any remuneration of the private entity involved. Some or even all of the following different parties could be involved in any BOT project:

BOT model

A BOT project is typically used to develop a discrete asset rather than a whole network and is generally entirely new or greenfield in nature (although refurbishment may be involved). In a BOT project the project company or operator generally obtains its revenues through a fee charged to the utility/ government rather than tariffs charged to consumers. A number of projects are called concessions, such as toll road projects, which are new build and have a number of similarities to BOTs.[3]

In general, a project is financially viable for the private entity if the revenues generated by the project cover its cost and provide sufficient return on investment. On the other hand, the viability of the project for the host government depends on its efficiency in comparison with the economics of financing the project with public funds. Even if the host government could borrow money on better conditions than a private company could, other factors could offset this particular advantage. For example, the expertise and efficiency that the private entity is expected to bring as well as the risk transfer. Therefore, the private entity bears a substantial part of the risk. These are some types of the most common risks involved:

BOOT Framework

[edit]

The BOOT procurement strategy utilizes project finance to fund large-scale greenfield infrastructure projects such as local power stations, water treatment facilities and sewage facilities, or transit infrastructure, etc.[7]

The BOOT delivery model is different from the BOT (build-operate-transfer) delivery model, in which the private party does not own the project as an asset; they only receive a concession to operate it for a period of time.

The BOOT delivery model is different from PPP (public-private partnerships), which refer to project agreements where a private entity takes over the building and operation of government-owned infrastructure.

Build-own-operate-transfer is often the best kind of delivery model, in which a private sector party, or consortium, receives a mandate from a private or public sector client to finance, design, construct, own, and operate a long-term project.

If you have been awarded a BOOT contract, this means that during that time period, you, the private party or your consortium, own and operate the facility. Your goal is to recover the costs of your investment, operations, and maintenance, and also make a profit from your project.

While you manage your contract, you generate profit by charging fees from the users of your project, and you have the project as an asset.

While the risk is yours, this risk is offset by various government incentives, funding, tax breaks, money to hire select people (such as unemployment job initiatives), and any other benefits that the regulatory body sees fit to grant you.

At the end of the contractual period (typically in the order of decades), ownership of the construction is given back to the state (or federal actor). You may receive a fee for this transfer.

Alternatives to BOT

[edit]

The scale of investment by the private sector and type of arrangement means there is typically no strong incentive for early completion of a project or to deliver a product at a reasonable price. This type of private sector participation is also known as design-build. Contrasted below, are reasons why the BOT model and it’s variants may work for you the end user, or government body.[promotion?]

Modified versions of the "turnkey" procurement and BOT "build-operate-transfer" models exist for different types of public-private partnership (PPP) projects, in which the main contractor is appointed to design and construct the works. This contrasts with the traditional procurement route (the build-design model), where the client first appoints consultants to design the development and then a contractor to construct the work.

The private contractor designs and builds a facility for a fixed fee, rate, or total cost, which is one of the key criteria in selecting the winning bid. The contractor assumes the risks involved in the design and construction phases.

Turnkey procurement under a design-build contract means that the design-build team would serve as the owner’s representative to determine the specific needs of the user groups; meet with the vendors to select the best options and pricing; advise the owner on the most logical options; plan and build the spaces to accommodate the function of the project; coordinate purchases and timelines; install the infrastructure; facilitate training of staff to use the equipment; and outline care and maintenance. In addition to being responsible for the design and construction of the work to the employer’s requirements, the contractor is also responsible for operating and maintaining the completed facility. The operation and maintenance period will span decades, during which time the contractor is said to have the "concession," is responsible for the operation of the facility, and benefits from operational income. The facility itself, however, remains the property of the employer. [8]

A DBO(design-build-operate) contract is a project delivery model in which a single contractor is appointed to design and build a project and then to operate it for a period of time.

The common form of such a contract is a PPP (public-private partnership), in which a public client (e.g., a government or public agency) enters into a contract with a private contractor to design, build, and then operate the project, while the client finances the project and retains ownership.

DBFO stands for design-build-finance-operate, which also assigns the responsibility to the private organization to design, build, finance, and operate. Financing your competitive project may be easy when there is a high demand for a service right now, and investors will throw money at any project that claims the spoils, such as opening a new airport in a busy metropolis.

BLT stands for build-lease-transfer, in which the public sector partner leases the project from the contractor and also takes responsibility for its operation.

ROT (renovate-operate-transfer) is a procurement method for infrastructure that already exists but is performing substandardly.

As you know, when essential services are no longer operating efficiently or effectively, repairs can be costly. When an obsolete facility or amenity (any public service such as telephone lines, etc.) becomes outdated and requires expensive repairs, it can be financed through public-private partnerships between public entities and private contractors that are able to provide renovation services and operate the project management after the repairs have been completed.

Economic theory

[edit]

Incontract theory, several authors have studied the pros and cons of bundling the building and operating stages of infrastructure projects. In particular, Oliver Hart (2003) has used the incomplete contracting approach in order to investigate whether incentives to make non-contractible investments are smaller or larger when the different stages of the project are combined under one private contractor.[9] Hart (2003) argues that under bundling incentives to make cost-reducing investments are larger than under unbundling. However, sometimes the incentives to make cost-reducing investments may be excessive because they lead to overly large reductions of quality, so it depends on the details of the project whether bundling or unbundling is optimal. Hart's (2003) work has been extended in many directions.[10][11] For example, Bennett and Iossa (2006) and Martimort and Pouyet (2008) investigate the interaction of bundling and ownership rights,[12][13] while Hoppe and Schmitz (2013, 2021) explore the implications of bundling for making innovations.[14][15]

See also

[edit]

References

[edit]
  1. ^ P.K. Abdul Ghafour (6 April 2009). "North-South Railway to be ready for freight movement by 2010". Arab News. Archived from the original on 16 June 2012. Retrieved 7 June 2011.
  • ^ Gajurel, Ashish (2013-07-07). "Promotion of public-private partnership". The Himalayan Times. Archived from the original on 15 September 2013. Retrieved 15 September 2013.
  • ^ a b "BOT - PPP in Infrastructure Resource Center". World Bank. March 13, 2012.
  • ^ Walker, Smith, Adrian Charles (1995). Privatized infrastructure: the build operate transfer approach. Thomas Telford. p. 258. ISBN 978-0-7277-2053-5.
  • ^ Wilde Sapte LLP, Denton (2006). Public Private Partnerships: Bot Techniques and Project Finance. London: Euromoney Books. p. 224. ISBN 978-1-84374-275-3.
  • ^ Mishra, R.C. (2006). Modern Project Management. New Age International. p. 234. ISBN 978-81-224-1616-9.
  • ^ "Build-Own-Operate-Transfer (BOOT)". Thomson Reuters Practical Law UK.
  • ^ "2.2.3. Turnkey".
  • ^ Hart, Oliver (2003). "Incomplete Contracts and Public Ownership: Remarks, and an Application to Public-Private Partnerships". The Economic Journal. 113 (486): C69–C76. doi:10.1111/1468-0297.00119. ISSN 0013-0133.
  • ^ Iossa, Elisabetta; Martimort, David (2015). "The Simple Microeconomics of Public-Private Partnerships". Journal of Public Economic Theory. 17 (1): 4–48. doi:10.1111/jpet.12114. ISSN 1467-9779.
  • ^ Henckel, Timo; McKibbin, Warwick J. (2017). "The economics of infrastructure in a globalized world: Issues, lessons and future challenges". Journal of Infrastructure, Policy and Development. 1 (2): 254–272. doi:10.24294/jipd.v1i2.55. hdl:1885/248776. ISSN 2572-7931.
  • ^ Bennett, John; Iossa, Elisabetta (2006). "Building and managing facilities for public services". Journal of Public Economics. 90 (10): 2143–2160. doi:10.1016/j.jpubeco.2006.04.001. ISSN 0047-2727.
  • ^ Martimort, David; Pouyet, Jerome (2008). "To build or not to build: Normative and positive theories of public–private partnerships". International Journal of Industrial Organization. 26 (2): 393–411. doi:10.1016/j.ijindorg.2006.10.004. ISSN 0167-7187.
  • ^ Hoppe, Eva I.; Schmitz, Patrick W. (2013). "Public-private partnerships versus traditional procurement: Innovation incentives and information gathering" (PDF). The RAND Journal of Economics. 44 (1): 56–74. doi:10.1111/1756-2171.12010. ISSN 1756-2171.
  • ^ Hoppe, Eva I.; Schmitz, Patrick W. (2021). "How (Not) to Foster Innovations in Public Infrastructure Projects". The Scandinavian Journal of Economics. 123: 238–266. doi:10.1111/sjoe.12393. ISSN 1467-9442.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Build–operate–transfer&oldid=1220860101"

    Categories: 
    Buildoperatetransfer
    Infrastructure investment
    Public administration
    Public finance
    Publicprivate partnership
    Hidden categories: 
    Articles with short description
    Short description matches Wikidata
    Articles with a promotional tone from April 2023
    All articles with a promotional tone
    Articles with J9U identifiers
    Articles with LCCN identifiers
     



    This page was last edited on 26 April 2024, at 10:50 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki