Bujagali Energy Limited






Oʻzbekcha / ўзбекча
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 00°1959N 33°0743E / 0.33306°N 33.12861°E / 0.33306; 33.12861
 

From Wikipedia, the free encyclopedia
 


Bujagali Energy Limited
Company typePrivate
IndustryElectric power generation
Founded2004; 20 years ago (2004)
HeadquartersNjeru, Uganda

Key people

Alaister McDougall
CEO[1]
ProductsElectricity
Websitewww.bujagali-energy.com

Bujagali Energy Limited (BEL) is an electric energy generating company in Uganda. The company owns and operates the Bujagali Power Station, the largest hydropower plant in the country as of July 2014.[2]

Overview

[edit]

BEL is a single purpose company, formed to develop the 250-megawatt Bujagali Hydropower Station. Under arrangements with the government of Uganda (GOU), BEL owns and operates the power plant for 30 years, starting with commissioning. After the 30 years, BEL will transfer ownership of the station to the GOU for US$1.00. The power generated is sold to the Uganda Electricity Transmission Company Limited, the Uganda electricity transmitter monopoly. The power purchase agreements were executed between the concerned parties, in December 2005.[3]

Power stations

[edit]

BEL owns and operates the Bujagali Hydroelectric Power Station, a 250-megawatt hydropower station built on the Victoria Nile at a cost of US$900 million between 2007 and 2012.[4]

Ownership

[edit]

As of September 2016, the shareholders in BEL were as listed in the table below.[5] In May 2018, the Daily Nation newspaper reported that Jubilee Holdings Limited was set to invest an additional KSh4.4 billion (US$44 million) in the business, in addition to the KSh5.5 billion (US$55 million) that it had already invested.[6] In August 2018, Sithe Global Power of the United States exited the company and SN Power AS of Norway acquired shareholding in the business.[7] After the exit of Sithe Global Power in 2018, the shareholding was adjusted as reflected in the table below.[8] SN Power AS was acquired by Scatec along with its assets on 29 January 2021.[9]

Shareholding In Bujagali Energy Limited
Rank Name of Owner % Ownership in 2018 % Ownership in 2020
1 Jubilee Investment Company[10] 8.80[11] 18.24[8]
2 Government of Uganda[5] 10.00 10.00
3 Scatec (formerly SN Power AS)[9] 64.89[7] 55.45[8]
4 Aga Khan Fund for Economic Development[5] 16.31 16.31
Total 100.0 100.0

Financing

[edit]

The following entities contributed funds to build the power station. As of July 2019, the restructured debt package was approximately US$500 million, with IFC contributing about US$100 million to the total new loan package.[11]

Modified Fund Sources for Bujagali Power Station
No. Name of Lender Loan Amount (US$) Percentage Ownership
1 International Finance Corporation[12] 100[11] 20.0
2 African Development Bank
3 European Investment Bank
4 German Investment Corporation
5 KfWofGermany
6 PROPARCOofFrance
7 French Development Agency
8 Netherlands Development Finance Company
Total 500.00 100.00

In December 2017, the Ugandan government reached consensus with the power station's financiers on restructuring the loans and waiving taxes on the power generated, to enable the cost of power to the consumer to reduce.[13] In July 2018, with about US$450 million of the US$900 million construction loan repaid, the remaining loan was restructured and extended for another 15 years, thereby lowering the loan payments and related electricity tariffs to as low as US$0.08 per unit, for large industrial customers.[11] The new lower electricity rates were expected to commence in July 2018.[14]

See also

[edit]

References

[edit]
  1. ^ Okuda, Ivan (21 August 2016). "Kiggundu to oversee Karuma dam project". Daily Monitor. Kampala. Retrieved 1 June 2018.
  • ^ Article (31 January 2011). "Bujagali Energy Limited: Powering Opportunity". Bus-Ex.Com Quoting Bujagali Energy Limited. Retrieved 19 July 2014.
  • ^ Mwesigye, Shifa (8 August 2013). "One Year On: Bujagali Doubles Power Supply". The Observer (Uganda). Retrieved 19 July 2014.
  • ^ "Ugandan President Museveni And Aga Khan Inaugurate Bujagali Hydropower Plant" (Press release). The Blackstone Group. 8 October 2012. Retrieved 19 July 2014.
  • ^ a b c Kalinaki, Daniel (4 September 2016). "Uganda urges Bujagali investors to take haircut on project to reduce power costs". The EastAfrican. Nairobi. Retrieved 7 September 2016.
  • ^ Mutua, John (31 May 2018). "Jubilee Holdings to pump Sh4.4bn into Bujagali power plant". Daily Nation. Nairobi. Retrieved 1 June 2018.
  • ^ a b Kasemiire, Christine (24 August 2018). "Government Earns Shs300 Billion From Bujagali Buyout Deal". Daily Monitor. Uganda. Retrieved 24 August 2018.
  • ^ a b c James Anyanzwa (30 June 2020). "Jubilee Holdings Injects Additional $40 Million In Bujagali Energy". The EastAfrican. Nairobi. Retrieved 1 July 2020.
  • ^ a b January 29; notice, 2021 Stock exchange (2021-01-29). "Scatec completes acquisition of SN Power". Scatec. Retrieved 2022-01-06.{{cite web}}: CS1 maint: numeric names: authors list (link)
  • ^ Juma, Victor (23 May 2014). "Jubilee Wins 30-Year Pact to Operate Bujagali". Kampala: Daily Monitor. Retrieved 23 May 2014.
  • ^ a b c d Victor Juma (21 July 2019). "Jubilee restructures its Sh51.5 billion Uganda power plant loans". Business Daily Africa. Nairobi. Retrieved 21 July 2019.
  • ^ IFC (20 December 2006). "Bujagali Energy Limited: Summary of Proposed Investment". International Finance Corporation (IFC). Archived from the original on 16 October 2014. Retrieved 19 July 2014.
  • ^ Abdallah, Halima (30 December 2017). "Uganda agrees to demands of Bujagali financiers". The EastAfrican. Nairobi. Retrieved 31 December 2017.
  • ^ Asiimwe, Dicta (9 July 2018). "Manufacturers win as Bujagali financing extended". The EastAfrican. Nairobi. Retrieved 9 July 2018.
  • [edit]

    00°19′59N 33°07′43E / 0.33306°N 33.12861°E / 0.33306; 33.12861


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Bujagali_Energy_Limited&oldid=1227369631"

    Categories: 
    Energy companies of Uganda
    Hydroelectric power companies of Uganda
    Aga Khan Development Network
    Energy companies established in 2004
    Renewable resource companies established in 2004
    2004 establishments in Uganda
    Electric power companies of Uganda
    Hidden categories: 
    CS1 maint: numeric names: authors list
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Coordinates not on Wikidata
     



    This page was last edited on 5 June 2024, at 09:33 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki