Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Locomotives  



1.1  The Bury type  





1.2  Railways supplied  







2 Train operating contract  





3 Formation of partnership  





4 Production  





5 Closure  





6 Preservation  





7 See also  





8 External links  





9 References  














Bury, Curtis and Kennedy






Español
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


Bury, Curtis and Kennedy
Company typeGeneral partnership
IndustryEngineering
Heavy industry
PredecessorEdward Bury and Company
Founded1826
FounderEdward Bury
Defunct1851
SuccessorBedford, Burys & Company
HeadquartersTabley Street (1826)
Clarence Foundry,
Love Lane (1828), ,

Key people

James Kennedy
Timothy Abraham Curtis
John Vernon
ProductsLocomotives
Ships

Number of employees

1600

Bury, Curtis and Kennedy was a steam locomotive manufacturer in Liverpool, England.

L&YR locomotive Victoria c.1878-80, designed by Bury and built by the Clarence Foundry in 1847, converted later to 0-4-2

Edward Bury established the works in 1826, under the name Edward Bury and Company. He employed James Kennedy as foreman; Kennedy later became a partner. About 1828, the firm moved to bigger premises in Love Lane, Liverpool, known as the Clarence Foundry.[citation needed]

Locomotives[edit]

Their first engine was built in 1830. Called Dreadnought, it ran on the Liverpool and Manchester Railway. It was objected to because it was on six wheels and was sold to the Bolton and Leigh Railway. The second, the four-coupled Liverpool, later in 1830,[1] used a cranked driving axle, and was also objected to (byGeorge Stephenson) because the 6 ft diameter wheels were too big.

The Bury type[edit]

However, they refined their designs and the resulting 2-2-0 and 0-4-0 locomotives quickly became a standard which was emulated by many other manufacturers, becoming known as the "Bury type". Distinguishing features of these engines were inside horizontal (or near-horizontal) cylinders, inside wrought-iron bar frame, which gave them a light appearance, and the round firebox (D-shaped in plan), with a large domed top surmounted by a safety valve.

Railways supplied[edit]

Thirteen were supplied to the Great Northern Railway (six of them being sub-contracted to William Fairbairn & Sons), and they became the standard classes on the London and Birmingham Railway, the Eastern Counties Railway, the Midland Counties Railway, the Manchester, Bolton and Bury Canal Navigation and Railway Company, the Lancaster and Preston Railway and the North Union Railway. Several were exported to the US, more than from any other British company except R. Stephenson & Co., and where Bury's "bar-frames" became standard. The firm had a reputation for good workmanship, cheapness and reliability.

Train operating contract[edit]

In 1836 Edward Bury was contracted to run the trains of the London and Birmingham Railway at a cost of one farthing per mile per passenger, and a speed not exceeding 22.5 miles per hour (36.2 km/h), with the L&BR providing locomotives to Bury's specification. This contract was annulled in July 1839 because of the unexpected growth in traffic and the increased speed required, and Bury acted thereafter as Locomotive Superintendent of the L&BR in the normal way. The engines he had specified were built by seven different firms, Bury's firm providing 45 of the original stock of 90.

Formation of partnership[edit]

Potteries, Shrewsbury and North Wales train at Abbey Station, Shrewsbury, behind an 1848 Bury, Curtis and Kennedy 0-4-2 locomotive

In 1842, Bury took Kennedy, Timothy Abraham Curtis and John Vernon as partners, and the company changed its name to Bury, Curtis and Kennedy.

Bury continued as Locomotive Superintendent of the London and Birmingham Railway but a few months after it had become part of the London and North Western Railway he resigned in March 1847. In February 1848 he was appointed Locomotive Superintendent of the Great Northern Railway, and in June 1849 became also its general manager.

Meanwhile, the firm of Bury, Curtis & Kennedy continued building locomotives, some of advanced design which had a great influence on subsequent practice, such as the 2-2-2s for the L&NWR which led directly to the Bloomers, as well as one-offs such as the gigantic 6-2-0 Crampton Liverpool for the L&NWR, the most powerful locomotive in the world in 1848. Six 0-4-2 locomotives were built in 1848 for the LNWR (Southern Division) with 16 in. x 20 in. cylinders, 5 ft. driving wheels, and 3 ft. trailing wheels.

Production[edit]

In all Bury, Curtis and Kennedy's Clarence Foundry built about 415 locomotives, but they produced much else besides, from church bells to iron ships. At its height, the firm employed 1,600 men.

Closure[edit]

The firm lost heavily in making components for the large bascule Blagoveshchensky Bridge over the River NevaatSt Petersburg — for which the Imperial Russian Government never paid, according to Bury's widow. This, plus a serious decline in the shipbuilding trade in Liverpool led to the firm's closing down in 1851.

Preservation[edit]

Engine No.36 ran from DublintoCork, remaining in service until 1874; displayed at the Cork International Exhibition 1902, British Empire Exhibition, Railway Centenary, 1925 and the bi-centenary of the Royal Dublin Society, 1930.

Two of the firm's locomotives have been preserved, Furness Railway 0-4-0 No. 3 (nicknamed "Old Coppernob" or "Coppernob"), built in 1846, now in the National Railway Museum, York and Great Southern and Western Railway 2-2-2 No. 36, built in 1847, now at Cork Kent railway station, Cork, Republic of Ireland.

See also[edit]

External links[edit]

References[edit]

  1. ^ Ahrons, E.L. (1966). The British Steam Railway Locomotive. Vol. I, to 1925. Ian Allan. pp. 18–19.

Retrieved from "https://en.wikipedia.org/w/index.php?title=Bury,_Curtis_and_Kennedy&oldid=1219049768"

Categories: 
Locomotive manufacturers of the United Kingdom
Manufacturing companies based in Liverpool
Defunct companies based in Liverpool
Hidden categories: 
CS1: long volume value
Use dmy dates from February 2015
Use British English from February 2015
All articles with unsourced statements
Articles with unsourced statements from July 2015
 



This page was last edited on 15 April 2024, at 12:58 (UTC).

Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



Privacy policy

About Wikipedia

Disclaimers

Contact Wikipedia

Code of Conduct

Developers

Statistics

Cookie statement

Mobile view



Wikimedia Foundation
Powered by MediaWiki