Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Working Process  





2 Capacity  





3 Status updates  





4 References  














Butibori Power Plant






Norsk bokmål
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 20°5542N 78°5601E / 20.9284°N 78.9336°E / 20.9284; 78.9336
 

From Wikipedia, the free encyclopedia
 

(Redirected from Butibori Power Project)

Butibori Power Project
Map
Country
  • India
LocationButibori, Maharashtra
Coordinates20°55′42N 78°56′01E / 20.9284°N 78.9336°E / 20.9284; 78.9336
StatusClosed
Construction began2009 (2009)
Commission dateAugust 2013 (2013-08)
Decommission date2019 (2019)
Operator(s)
Thermal power station
Primary fuelCoal
Power generation
Units operational2
Units planned3
Units cancelled1
Units decommissioned2
Nameplate capacity
  • 600 MW

Butibori Power Project is a coal-based thermal power plant located at Butibori near Nagpur in the Indian state of Maharashtra. The power plant is operated by the Reliance Power.

The Engineering, procurement and construction contract is given to Reliance Infrastructure and Shanghai Electric Corporation of People's Republic of China is supplying the boiler, turbine and generator (BTG) for the power plant.[1] Along with Power generation units, there are two reservoirs of water, one of which has intake from the MIDC area and the other from the nearby Wadgaon dam. The premises of the power plant also include a Coal Handling Plant (CHP), an Ash Handling Plant (AHP) and a Water Treatment Plant.

The basis for generation of electricity in this plant is the reheat Rankine cycle.

Working Process[edit]

The plant has two 72 m high tangentially fired, water tube boilers. The boilers have a capacity of 1024 m3/hr each, with the output steam being supplied at 167 bar and 540 °C. The boilers are heated by coal. The coal is initially about 300 mm in size. It is crushed to 20 mm and then put into a coal mill, which pulverizes it into extremely fine powder of around 70 microns. The powdered coal is then supplied to the top of the boilers via tubes and primary air (PA) fans, where it is burnt to generate heat and convert the water in the boilers to steam.

The steam generated in the boilers is then supplied to the turbine, which is coupled to a generator. The steam is supplied via 2 out of 3 boiler feed pumps. Two pumps are always active, while one pump is on standby. The turbines run at a constant speed of 3000 rpm, so as to provide a steady output of 50 Hz. The turbines are divided into 3 parts : High Pressure (HP) turbine, Intermediate Pressure (IP) turbine and a Low Pressure (LP) turbine. The steam is supplied to the HP, which sends it back for reheating. This reheated steam then goes to the IP and the LP, which in turn run the generator to produce electricity.

The steam let out from the turbine goes to a condenser, which converts the steam into water to be reused in the boiler.

The burning of coal releases ash and flue gases. The flue gases are released out into the surroundings, 220 m above the ground level via two chimneys. Post combustion, the mixture of flue gases and ash passes over an Electrostatic Precipitator (ESP). This attracts the ash particles, which are usually positively or negatively charged, to its surface and lets the uncharged flue gases through to the chimneys. This ESP has 8 stages, to even out the accumulation of ash and prevent overloading. The ash is collected in a storage via a hopper. This ash is then carried away to the AHP until it is shipped if the need arises.

Before the water is supplied into the boilers, it is treated in the water treatment plant, which removes all dissolved minerals in the water, disinfects it and removes dissolved air and silica. The turbidity of water is also reduced to less than 1 NTU. Chemicals used in the Water treatment plant are Lime Dolomite, Poly electrolyte, Chlorine gas, SMBS (Sodium metabisulphate) and an antiscalant.

Capacity[edit]

It has an installed capacity of 600 MW.

Unit No. Generating Capacity Commissioned on Status
1 300 MW 2012 August Stooped (non-functional)
2 300 MW 2013 December Stooped (non-functional)[2]

Although the plant has a capacity of 660 MW, it supplies only about 540 MW to the grid. 30% of the power generated is used to run the plant itself.

Status updates[edit]

Vidarbha Industries Power Limited (VIPL), a subsidiary of Reliance Power Limited, has made 141 out of its 170 staffers at the 600 MW Butibori power plant tender their resignation. The plant was closed since January 2019 and the staffers were doing only maintenance and preservation work. The remaining 29 staffers will continue this work. Station director Rajendra Kale said the plant had closed down due to regulatory issues after Adani Power took over Reliance’s power distribution business in Mumbai. “We initially closed one 300 MW unit and then had to close the second one too,” he added.[3]

References[edit]

  1. ^ ":: Butibori Power Project ::". Archived from the original on 15 March 2015. Retrieved 20 April 2015.
  • ^ "Reliance-Power starts up 2nd unit of Butibori plant". The Times of India. Retrieved 20 April 2015.
  • ^ "Butibori Power company asks 141 staff to resign amid Covid mayhem". Times of India.

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Butibori_Power_Plant&oldid=1183593691"

    Categories: 
    Coal-fired power stations in Maharashtra
    Nagpur district
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description matches Wikidata
    Use dmy dates from April 2017
    Use Indian English from April 2017
    All Wikipedia articles written in Indian English
    Infobox mapframe without OSM relation ID on Wikidata
    Coordinates on Wikidata
    Thermal power station articles using Infobox power station
    Year of establishment missing
    Pages using the Kartographer extension
     



    This page was last edited on 5 November 2023, at 08:43 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki