Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Landing Points  





2 History  





3 Usage  





4 Notes  





5 References  





6 External links  














CANTAT-3






Deutsch
Eesti
Íslenska

Русский
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 


CANTAT-3
Owners:
Føroya Tele
Landing points
  • 2. Vestmannaeyjar, Iceland(Turned off in 2023)
  • 3. Tjørnuvík, Faroe Islands
  • 4. Redcar, North Yorkshire, UK (defunct)
  • 5. Blaabjerg, Denmark
  • 6. Sylt, Germany
  • 7. Valdemar Oil Platforms, North Sea
  • Design capacity2.5 Gigabit/Second
    TechnologyNL-16 laser regenerative
    Date of first use1994

    CANTAT-3 was the third Canadian transatlantic telecommunications cable, in regular operation from 1994 to 2010, carrying 3 x 2.5 Gbit/s between Canada and Europe. It branches to both Iceland and the Faroe Islands.[1] It is out of normal service for international bandwidth and is currently operated by Føroya Tele to service oil platforms in the North Sea.

    Landing Points

    [edit]

    The landing points are:

    1. Pennant Point, Nova Scotia, Canada (defunct since 2010)
    2. Vestmannaeyjar, Iceland[2](Turned off in 2023)
    3. Tjørnuvík, Faroe Islands
    4. Redcar, North Yorkshire, UK (defunct)
    5. Blaabjerg, Denmark
    6. Sylt, Germany
    7. Valdemar Oil Platforms, North Sea (connected in 2012)[3]

    History

    [edit]

    CANTAT-3 is the only NL-16 laser regenerative 2.5 Gig/s submarine system built in the world.[4] Part of this huge system was built at STC Submarine Networks, Portland, Oregon, USA, from 1993-1994 (which later became Alcatel Submarine Networks). STC Submarine Networks in Southampton, Hampshire, UK. made the rest of the system. The Canadian portion (shore end system) was laid off Nova Scotia by the Teleglobe cable ship CS John Cabot. The main-lay portion was deployed off Nova Scotia towards the Faroes on board the AT&T ship Global Mariner. Other cable ships were involved in the completion of this system. This was the northernmost cable system ever deployed at the time.

    CANTAT-3 was operated[until when?]byIndia's Teleglobe.

    On December 17, 2006, CANTAT-3 services were disrupted due to damage to the submarine cable, resulting in degradation of service to hundreds of thousands of users connecting via internet and media providers (Síminn, Vodafone and Hive). The country was however backed up by the second submarine cable, FARICE-1 The most notable effect of the event was a temporary shut-down of data communications by Iceland's universities and hospitals, which relied exclusively on CANTAT-3's services. Although it was predicted that a full recovery of the cable would take ten days, starting from midnight on January 13, 2007, it actually took until July 29, 2007 before service was fully restored. During that time, the Icelandic universities and hospitals in Akureyri and Reykjavík relied on emergency connectivity obtained via local internet providers Síminn and Vodafone. The Icelandic government decided not to buy extra bandwidth for the university network through the functioning FARICE-1 cable, despite being a large shareholder in FARICE-1.[5]

    Given that CANTAT-3 suffered multiple[1][6] interruptions, the alternative cables FARICE-1, DANICE and Greenland Connect were established and/or expanded[1] to ensure cabled telecommunication connectivity in Iceland. CANTAT-3 also had too little capacity by 2007 for domestic Internet usage, and became outdated as soon as the DANICE cable came into operation by 2009.

    Usage

    [edit]

    Føroya Tele (Faroese Telecom) took over ownership and operation of the cable in 2012 to service oil platforms in the North Sea.[citation needed]

    As of 2022, CANTAT-3 is still in use and is powered from the Faroe Islands, Germany, Denmark and Valdemar Oil Platforms. Given its obselete bandwidth capacity, providing service to oil platforms is the currently the primary function of CANTAT-3. The transatlantic portion as well as the spur to England is no longer in operation and has not been replaced.[7]

    Notes

    [edit]
  • ^ "Míla ehf. and Føroya Tele signed 3 year contract". Míla (Press release). Archived from the original on 2013-09-18. Retrieved 2013-09-18.
  • ^ "Offshore oil and gas". Orange Marine. Retrieved 2022-08-08.
  • ^ "12.17 ODIN Cable System". Greenland Theory. Retrieved 31 December 2018.
  • ^ Press release by Síminn at 2006-12-17 about failure of CANTAT-3 Archived 2013-09-18 at archive.today (Icelandic)
  • ^ Press release by Síminn at 2003-11-05 about failure of CANTAT-3 Archived 2013-09-18 at archive.today (Icelandic)
  • ^ "The Shefa Network". Shefa (in Faroese). Retrieved 2022-08-08.
  • References

    [edit]
    [edit]
    Retrieved from "https://en.wikipedia.org/w/index.php?title=CANTAT-3&oldid=1225321335"

    Categories: 
    Transatlantic communications cables
    Infrastructure completed in 1994
    Submarine communications cables in the North Atlantic Ocean
    Submarine communications cables in the North Sea
    1994 establishments in Nova Scotia
    1994 establishments in Europe
    2010 disestablishments in Nova Scotia
    2010 disestablishments in Europe
    Hidden categories: 
    Webarchive template archiveis links
    CS1 Faroese-language sources (fo)
    Articles with short description
    Short description matches Wikidata
    All articles with vague or ambiguous time
    Vague or ambiguous time from May 2024
    All articles with unsourced statements
    Articles with unsourced statements from May 2024
    Webarchive template wayback links
     



    This page was last edited on 23 May 2024, at 18:09 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki