Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Design  





2 History  





3 See also  





4 References  





5 External links  














CAREM






Español
Français
Bahasa Indonesia
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 




In other projects  



Wikimedia Commons
 
















Appearance
   

 





Coordinates: 33°5804S 59°1247W / 33.96769816066898°S 59.21303714281933°W / -33.96769816066898; -59.21303714281933
 

From Wikipedia, the free encyclopedia
 


CAREM logo
Status of the construction of the CAREM plant in July 2019

CAREM (Spanish: Central Argentina de Elementos Modulares) is a small modular reactor for electrical power generation currently under construction near the city of Zárate, in the northern part of Buenos Aires province beside the Atucha I Nuclear Power Plant.

Design

[edit]

The reactor was integrally designed by CNEA (National Atomic Energy Commission), being the first power reactor designed by the country. It is basically a simplified pressurized water reactor (PWR) designed to have an electrical output of 25MW for the first prototype, 100MW in the following one. It is an integral reactor – the coolant system is inside the reactor vessel – so that the entire plant operates at the same pressure. This design minimizes the risk of loss-of-coolant accidents (LOCA). Its fuel is uranium oxide with a 235
U
enrichment
of 3.4% that needs to be replaced annually.[1]: 20–22  The primary coolant system uses natural circulation, so there are no pumps required, which provides inherent safety against core meltdown, even in accident situations.

History

[edit]

In 1984 it was presented publicly for the first time during an IAEA conference in Peru.[2] For political reasons the project was halted but was relaunched by the 2006 Argentine nuclear reactivation plan.

The 25 MWe prototype version of CAREM currently being built will be followed by a second one of 100–200 MWe to be installed in Formosa Province.[3][4]

As of 2013, the first prototype was planned to receive its first fuel load in 2017.[5] First concrete was poured in February 2014.[6]

As of 2016, the completion of the project was scheduled for the end of 2018.[7] Cost has been estimated to US$446[8]-700 million.[9] As of 2018, the start date was deferred to 2020.[10]

In November 2019, construction was halted due to late payments to the contractor, design changes and late delivery of technical documentation.[6] A new contract for finishing the concrete structures of the reactor was awarded in November 2021.[6]

See also

[edit]

References

[edit]
  1. ^ Office of Nuclear Energy, Science and Technology (May 2001). "Report to Congress on Small Modular Nuclear Reactors" (PDF). U.S. Department of Energy. Archived from the original (PDF) on 16 July 2011.
  • ^ "El proyecto de reactor CAREM". Archived from the original on 2009-07-16. Retrieved 2010-06-10.
  • ^ "Construction of CAREM underway". World Nuclear News. 10 February 2014. Retrieved 19 February 2014.
  • ^ "El Plan Nuclear Argentino coloca a Formosa en destacado lugar frente a la construcción del CAREM". Archived from the original on 2011-07-20. Retrieved 2010-06-10.
  • ^ "Contract awarded for CAREM vessel". World Nuclear News. 5 December 2013. Retrieved 6 December 2013.
  • ^ a b c "Construction of Argentina's CAREM-25 unit to restart". World Nuclear News. 8 November 2021. Retrieved 9 May 2022.
  • ^ "Contract for prototype CAREM balance of plant". World Nuclear News. 6 September 2016. Retrieved 6 December 2013.
  • ^ "Nuclear Power in Argentina | Argentinian Nuclear Energy". www.world-nuclear.org. World Nuclear Association. April 2020. Archived from the original on 22 June 2020. The total cost was estimated at ARS 3.5 billion ($446 million).
  • ^ Baker, Andrew. "Argentine nuclear reactor due to start up in..." BNamericas.com. Archived from the original on 30 March 2019.
  • ^ "Progress for Argentina's CAREM vessel". Nuclear Engineering International. 9 May 2018. Retrieved 17 August 2019.
  • [edit]

    33°58′04S 59°12′47W / 33.96769816066898°S 59.21303714281933°W / -33.96769816066898; -59.21303714281933

  • t
  • e
  • t
  • e

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=CAREM&oldid=1234784744"

    Categories: 
    Nuclear reactors
    Nuclear technology in Argentina
    Nuclear power stubs
    Argentine building and structure stubs
    Small modular reactor
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Articles with short description
    Short description is different from Wikidata
    Articles containing Spanish-language text
    Official website different in Wikidata and Wikipedia
    Articles with Spanish-language sources (es)
    Coordinates on Wikidata
    All stub articles
     



    This page was last edited on 16 July 2024, at 03:47 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki