Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Construction and design  





2 Gallery  





3 See also  





4 References  














Cheongpung Bridge








 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 






From Wikipedia, the free encyclopedia
 

(Redirected from Cheong poong bridge)

Cheongpung Bridge


청풍대교
Coordinates37°00′12N 128°10′47E / 37.00347°N 128.179593°E / 37.00347; 128.179593
CarriesRoute 82
CrossesChungju Lake
LocaleNorth Chungcheong Province, South Korea
Characteristics
Longest span327m
History
Constructed byDaelim Industrial Co.
Location
Map

Cheongpung Bridge (Korean청풍대교; RRCheongpungdaegyo) is a cable-stayed bridge which crosses the lake formed by Chungju Dam (part of the Namhan River system, a tributary of the Han River) in North Chungcheong Province, South Korea on Route 82 in that region.

The bridge project began in December 2004 and was scheduled to be completed in September 2010, to replace an existing PSC box girder bridge which had required periodical rehabilitation and repair work. As the area where the bridge was constructed has well-known natural scenery and attractions, it designed to support tourism development plans.[1]

Construction and design[edit]

The bridge was built by contractor Daelim Industrial Co., LTD, at a contract price of 40.3 million USD.[2] Concrete pylon height with typical H-shape is 103m and constructed by auto climbing form. The main span of 327m across the lake is constructed using the free cantilever method and the side span of 57.5m is constructed by the full staging method.[1] The combination of composite section (reinforced concrete deck and I-shaped steel girder) for the center span and concrete section for side spans applied to the bridge because of decreasing effect of weight balance. Concrete pylon has typical H-shape. The leg shape beneath the superstructure level, on the other hand, needs to be narrow down a little bit to make the size of foundation smaller mainly for less rock excavation at foundation locations and better handling of construction unit (caisson) considering the site condition. Cable is a multi strand system as two planes semi-fan. An extra pier support in each side span has been applied. To maximize the counter weight effect by concrete girder at side span, it is necessary to make the side span heavier as possible and not to have excessive bending moment by increasing dead load at the same time. Here, the extra pier support gives more opportunity for having more weight and stiffness in side span without resulting in excessive bending moment in girders and pylons.[3]

Carries 2lanes
Location Mooltae-ri~Dohwa-ri, Sheongpung-myeon, Jecheon-si, Chungcheongbuk-do
Total length 442m
Width 14.5m
Height 103m
Longest span 327m
Construction begin DEC. 2004
Construction end SEP. 2010

Gallery[edit]

See also[edit]

References[edit]

  1. ^ a b "Construction of Hybrid Cable-Stayed Bridge",D.G Kim, H.C Kwon, K.J. Lee, IABMAS, 2010
  • ^ “Daelim bridge 2013 http://www.daelim.co.kr/static/data/brochure_eng.pdf Archived 2014-07-26 at the Wayback Machine
  • ^ "Design of Cheong-poong bridge (Steel-concrete Hybrid cable-stayeg)", D-H. Yoo, J-S. Ko and C.Moon., 3rd International Symposium on Steel Structures, March 2005

  • Retrieved from "https://en.wikipedia.org/w/index.php?title=Cheongpung_Bridge&oldid=1187649160"

    Categories: 
    Cable-stayed bridges in South Korea
    Bridges completed in 2010
    Buildings and structures in North Chungcheong Province
    Hidden categories: 
    Webarchive template wayback links
    Articles needing additional references from July 2014
    All articles needing additional references
    Articles with short description
    Short description is different from Wikidata
    Pages using gadget WikiMiniAtlas
    Infobox mapframe without OSM relation ID on Wikidata
    Pages using infobox bridge with empty coordinates parameter
    Articles containing Korean-language text
    Pages using the Kartographer extension
     



    This page was last edited on 30 November 2023, at 15:51 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki