Jump to content
 







Main menu
   


Navigation  



Main page
Contents
Current events
Random article
About Wikipedia
Contact us
Donate
 




Contribute  



Help
Learn to edit
Community portal
Recent changes
Upload file
 








Search  

































Create account

Log in
 









Create account
 Log in
 




Pages for logged out editors learn more  



Contributions
Talk
 



















Contents

   



(Top)
 


1 Operator  





2 History  





3 Processing and transport  





4 Extension  





5 References  





6 External links  














Christmas Creek mine






Cebuano
Deutsch
Français
Svenska
 

Edit links
 









Article
Talk
 

















Read
Edit
View history
 








Tools
   


Actions  



Read
Edit
View history
 




General  



What links here
Related changes
Upload file
Special pages
Permanent link
Page information
Cite this page
Get shortened URL
Download QR code
Wikidata item
 




Print/export  



Download as PDF
Printable version
 
















Appearance
   

 





Coordinates: 22°2246S 119°5059E / 22.379427°S 119.849593°E / -22.379427; 119.849593
 

From Wikipedia, the free encyclopedia
 


Christmas Creek mine
Location
Christmas Creek mine is located in Western Australia
Christmas Creek mine

Christmas Creek mine

Location in Western Australia

LocationShire of East Pilbara, Pilbara
StateWestern Australia
CountryAustralia
Coordinates22°22′46S 119°50′59E / 22.379427°S 119.849593°E / -22.379427; 119.849593
Production
ProductsIron ore
Production50 million tonnes/annum
History
Opened2009
Owner
CompanyFortescue Metals Group
WebsiteFortescue website
Map

The Christmas Creek mine is an iron ore mine located in the Pilbara region of Western Australia, 61 km south-south-west of Nullagine, in the Chichester Range.[1]

Operator[edit]

The mine is fully owned and operated by the Fortescue Metals Group (FMG) and is one of the two iron ore mines that are part of the Chichester Hub operation; the other is Cloud Break mine, located 50 km west of Christmas Creek.[2]

The other FMG mining hubs in the Pilbara are the Solomon Hub[3] 60 km north of Tom Price and 120 km to the west of the Chichester Hub,[4] and the Western Hub,[5] which includes the Eliwana operation.

Fortescue is the third-largest iron ore mining company in the Pilbara, behind Rio Tinto and BHP.[6]

History[edit]

Iron ore mines in the Pilbara region

FMG acquired the Cloudbreak and Christmas Creek tenements during 2003. The company began constructing port facilities at Port Hedland in February 2006, followed by a A$3.2 billion capital raising in August 2006 to finance its projects.[7] Construction on the Cloud Break mine began in October 2006[8] and Fortescue began mining at Cloud Break in October 2007.[7] Iron ore production at the mine began in 2008 and, in its first full year of operation the mine produced 28 million tonnes of iron ore.[2]

Processing and transport[edit]

The ore from the mine is processed on site. Initially, it was loaded onto trucks and transported to Cloudbreak and then on to the coast at Port Hedland through the Fortescue railway, where it is loaded onto ships. Construction on a 280 km long railway from Cloudbreak to the Herb Elliott Port at Point Hedland was begun in November 2006. The line was scheduled to be fully operational within 18 months. A cyclone in March 2007 killed two workers at the project and led to delays. The first train from the mine to the port travelled on 5 April 2008.[9] A 44 km railway linking Christmas Creek to Cloudbreak, allowing ore to be taken all the way to the port by rail, opened in December 2010; further improvements to railways are planned.[10][11] Electricity to the mine and Cloudbreak is supplied by a local power station, being expanded with a 60 MW solar farm and grid connection to Newman,[12] and performs grid services.[13]

The Pinnacles in Christmas Creek is an Australian Aboriginal sacred site in the area. There is a long history of struggle for land rights in the region.

The mine's workforce is on a fly-in fly-out roster.[14]

Originally, FMG planned to increase the production at Cloudbreak to 55 million tonnes through a US$220 million upgrade of the plant, but this had to be abandoned in October 2009 because of funding difficulties through its Chinese investors. Instead, Fortescue decided to develop the Christmas Creek deposit, at a cost of US$360 million, by building a mine and process plant there and linking it to its existing rail network. Christmas Creek is scheduled to produce 16 million tonnes of iron ore in its first year of operation. Fortescue plans to reach an annual production of 95 million tonnes of iron ore by 2012, downgraded from an earlier target of 120 million.[15]

The Christmas Creek operation began transporting ore by truck to Cloudbreak for processing in June 2009.[6] Construction on the processing facility began in November 2009 and is expected to be completed within 13 month.[16][17] Commissioning of the new ore processing facility at Christmas Creek is scheduled to begin in February 2011.[18]

On 14 August 2013, an electrician was killed at the Christmas Creek mine when he sustained fatal crush injuries.[19] A second fatality occurred on 29 December 2013 when a contractor was killed in the heavy vehicle workshop at the mine.[20]

Extension[edit]

In 2015 the Public Environmental Review for the Christmas Creek Iron Ore Mine expansion was made public, and extensive parts of the review relate to issues of mining adjacent to the Fortescue marshes.[21]

References[edit]

  1. ^ MINEDEX website: Christmas Creek search result Archived 11 September 2008 at the Wayback Machine accessed: 6 November 2010
  • ^ a b Mining Archived 9 November 2010 at the Wayback Machine Fortescue Metals Group, accessed: 9 November 2010
  • ^ FMG. "Our Operations". Retrieved 6 August 2021.
  • ^ "Our Operations". Fortescue Metals Group. Retrieved 6 August 2021.
  • ^ FMG. "Our Operations". Retrieved 6 August 2021.
  • ^ a b Western Australian Mineral and Petroleum Statistic Digest 2009 Department of Mines & Petroleum, accessed: 8 November 2010
  • ^ a b History Archived 8 December 2010 at the Wayback Machine Fortescue Metals Group, accessed: 9 November 2010
  • ^ Work begins on Cloud Break mine ABC News, published: 24 October 2006, accessed: 9 November 2010
  • ^ Fortescue opens the world's heaviest haul railway Railway Gazette International, published: 14 July 2008, accessed: 6 November 2010
  • ^ Christmas Creek Rail Extension NRW Holdings
  • ^ "Heavy haul expansion plan approved". Retrieved 13 February 2011.
  • ^ Parkinson, Giles (9 November 2020). "Biggest solar farm outside main grids nearly complete, miner counts huge savings". RenewEconomy. Archived from the original on 9 November 2020.
  • ^ Parkinson, Giles (16 December 2021). "The solar farm where inverters operate all night, doing voltage control for the grid". RenewEconomy.
  • ^ Sucked in The Australian, published: 4 April 2008, accessed: 9 November 2010
  • ^ "Fortescue Metals Group's China funding flops" The Australian, published: 13 October 2010, accessed: 9 November 2010
  • ^ Fortescue to spend $360m at Christmas Creek mine to up output The Australian, published: 112 October 2009, accessed: 9 November 2010
  • ^ Fortescue shares up on FY profit jump Sydney Morning Herald, published: 26 August 2010, accessed: 9 November 2010
  • ^ Ore dip fails to slow Fortescue progress The Age, published: 15 October 2010, accessed: 9 November 2010
  • ^ Worker dies at FMG's Christmas Creek iron ore minesite Archived 15 August 2013 at the Wayback Machine News.com.au, published: 15 August 2013, accessed: 16 August 2013
  • ^ Fatality at Fortescue's Christmas Creek mine The Australian, published: 30 December 2013, accessed: 31 December 2013
  • ^ "Archived copy". Archived from the original on 2 May 2015. Retrieved 19 June 2015.{{cite web}}: CS1 maint: archived copy as title (link)
  • External links[edit]


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Christmas_Creek_mine&oldid=1221577537"

    Categories: 
    Iron ore mines in Western Australia
    Surface mines in Australia
    Shire of East Pilbara
    Fortescue Metals Group
    2009 establishments in Australia
    Hidden categories: 
    Pages using gadget WikiMiniAtlas
    Webarchive template wayback links
    CS1 maint: archived copy as title
    Articles with short description
    Short description is different from Wikidata
    Use Australian English from June 2015
    All Wikipedia articles written in Australian English
    Use dmy dates from June 2015
    Coordinates on Wikidata
    Infobox mapframe without OSM relation ID on Wikidata
    Wikipedia articles in need of updating from December 2021
    All Wikipedia articles in need of updating
    Pages using the Kartographer extension
     



    This page was last edited on 30 April 2024, at 19:01 (UTC).

    Text is available under the Creative Commons Attribution-ShareAlike License 4.0; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.



    Privacy policy

    About Wikipedia

    Disclaimers

    Contact Wikipedia

    Code of Conduct

    Developers

    Statistics

    Cookie statement

    Mobile view



    Wikimedia Foundation
    Powered by MediaWiki